•After the Governorate of Port
Said handed over the site to the project management, the following activities
had taken place:
•Widening and leveling of the access rough
road
•Evacuated the existing fish ponds from its
polluted water
•Constructed an earth ring road around the
site
•Conducted a geotechnical study and ground
survey
•Implemented the conceptual design by
TVA
•Finalized the detailed design by AAW
•Initiated construction of the main and
pilot wetlands by Misr for Development Concrete Company