•The International Consultant
(NIRAS & ECMA) suggested some modifications to the design such as:
•Modified the monitoring plan of KOMEX
(Five cells with the same plants and different discharge and five cells with
the same discharge and different plants)
•Install pipes with valves to control the
influent and effluent to and from each cell
•Install ultrasonic sensors at the inlets
and outlets of the cells to measure the flows.
•Install water level gauges at several
points of the facility
•Change the plants of some cells (from reed
to cattail and papyrus)