Lake Manzala Engineered Wetland Project
Treatment System Components
25
14
2
8.3
1.2
2
Day
Retention time
11,250
700
1,000
25,000
25,000
50,000
M3
Volume
10,300
640
2,100
50,000
50,000
33,300
M2
Area
1.1
1.1
1.2
0.5
0.5
1.5
M
Depth
450
50
500
3,000
21,500
25,000
M3/d
Flow
Fingerling Ponds
Hatchery Ponds
Reciprocating Cells
Low Flow Wetland
High Flow Wetland
Sediment Basin
Units
Parameter