l-The project
conceptually linked marine pollution and biodiversity;
l
l-Training was basically organized as training for trainers to maximize the results of the capacity building
activities;
l
l-Funds were released to national authorities in small tranches only, on the basis of the
achievements made;
l
l-Some activities (e.g.
the preparation of pre-investment studies for pollution reduction) resulted in an upgrading of capacities at the local level