GEF




About this publication:

This publication contains the report of the Fifth Meeting of the Regional Working Group for
the Investment Component, under the UNDP/GEF Project, "Reducing Environmental Stress
in the Yellow Sea Large Marine Ecosystem." The report includes a summary of the
discussions and agreements from the Meeting. The agreed list of governance activities for
the Project's second phase is included, as well as recommendations to improve on-going
activities conducted under the Investment Component.



For reference purposes, this report may be cited as:

UNDP/GEF 2008. Reducing Environmental Stress in the Yellow Sea Large Marine
Ecosystem, Report of the Fourth Meeting of the Regional Working Group for the Investment
Component. UNDP/GEF/YS/RWG-I.5/3.







REDUCING ENVIRONMENTAL STRESS
IN THE YELLOW SEA
LARGE MARINE ECOSYSTEM



Report of the Fifth Meeting of the
Regional Working Group for the Investment Component
UNDP/GEF Yellow Sea Project

Shanghai, China, 14 - 16 October 2008



GEF

UNDP/GEF PROJECT ENTITLED "REDUCING ENVIRONMENTAL STRESS IN THE
YELLOW SEA LARGE MARINE ECOSYSTEM"

UNDP/GEF/YS/RWG-I.5/3
Date: 16 October 2008
English only


Fifth Meeting of the Regional Working Group
for the Investment Component
Shanghai, China, 14 - 16 October 2008

















Meeting Report



TABLE OF CONTENTS


1
OPENING OF THE MEETING ........................................................................................ 1
1.1 WELCOME ADDRESSES.............................................................................................. 1
1.2 INTRODUCTION OF MEMBERS ..................................................................................... 1
2
ORGANISATION OF THE MEETING............................................................................. 1
2.1 DOCUMENTATION AVAILABLE TO THE MEETING .......................................................... 1
2.2 ORGANISATION OF WORK.......................................................................................... 1
3
ADOPTION OF THE MEETING AGENDA ..................................................................... 2
4
EXPECTED OUTPUTS FROM THE 5TH RWG-I MEETING.......................................... 2
5
REVIEW OF COMPLETED AND ON-GOING INVESTMENT COMPONENT
ACTIVITIES .................................................................................................................... 2

5.1 CONTRIBUTION TO THE PREPARATION OF THE STRATEGIC ACTION PROGRAMME ......... 2
5.2 DATA AND INFORMATION MANAGEMENT ­ REGIONAL GIS DATABASES & TECHNICAL
WORKSHOP .............................................................................................................. 5
5.3 STAKEHOLDER INVOLVEMENT, PUBLIC AWARENESS AND PARTICIPATION .................... 5
5.4 NATIONAL CO-ORDINATION AND IMPLEMENTATION...................................................... 6
5.5 SMALL GRANT PROJECTS........................................................................................... 6
6
SCIENTIFIC AND TECHNICAL INPUTS FOR THE 2ND PHASE PROJECT
DOCUMENT ................................................................................................................... 6

6.1 REVIEW GOVERNANCE ACTIONS................................................................................ 6
6.2 ACTIVITIES REQUIRED UNDER EACH GOVERNANCE ACTION.......................................... 6
6.3 INPUTS FOR 2ND PHASE PROJECT DOCUMENT - DETAILS OF HOW EACH GOVERNANCE
ACTION SHOULD BE IMPLEMENTED ............................................................................. 6
7
OTHER ACTIVITIES TO BE IMPLEMENTED IN 2009 .................................................. 7
7.1 INFORMATION ON THE OPERATIONAL CHANGES AT UNOPS ........................................ 7
7.2 OTHER ACTIVITIES NEEDED........................................................................................ 7
8
WORKPLAN FOR 2009 ................................................................................................. 7
9
PROPOSED CANCELLATION OF 6TH RWG-INVESTMENT MEETING FOR THE
2ND REGIONAL SCIENCE CONFERENCE .................................................................. 8

10 ADOPTION OF THE MEETING REPORT...................................................................... 8
11 CLOSURE OF THE MEETING ....................................................................................... 8





ANNEXES

Annex I
List of Participants

Annex II
List of Documents

Annex III
Agenda

Annex IV
Agreed Activities and Budget Table for Governance

Annex V
Investment Component Workplan for 2009



UNDP/GEF/YS/RWG-I.5/3
Page 1
1
OPENING OF THE MEETING

1.1

Welcome addresses

1.1.1 On behalf of the UNDP/GEF Yellow Sea Project, Mr. Yihang Jiang, Project Manager,
opened the meeting and welcomed the members of the Regional Working Group-
Investment (RWG-I), and other participants to Shanghai, China. After informed the
meeting of the recent development in Project implementation, Mr. Jiang mentioned
that with the drafting of the Regional Strategic Action Programme (SAP) completed
successfully, the Project had started planning for the implementation of the SAP--the
Project's 2nd Phase--under the request of the Project Steering Committee (PSC). To
attain GEF funding, the initial Project Identification Form and the Project Document
should be developed. One of the most important tasks for this meeting was to
provide inputs for preparing those documents.

1.1.2 Mr. Mingyuan Zhu, Chairperson of RWG-I welcomed the participants to the meeting.
Referring to major agenda items to be discussed during this meeting, Mr. Zhu hoped
that the members will provide constructive suggestions to improve proposed future
activities to contribute to the 2nd Phase preparation.

1.1.3 On behalf of the Chinese participants, Mr. Fengkui Liang welcomed all participants to
Shanghai. Mr. Liang indicated that the implementation of the project activities in
2008 has been very successful, including the co-operative cruises organised in
January and August 2008, the preparation and agreement on the SAP, and initiation
of PIF preparation.

1.1.4 On behalf of the Korean members, Mr. Hak-Bong Chang expressed his gratitude to
meet the participants, especially the members from China. Mr. Chang hoped that the
meeting will produce a number of outputs by having fruitful discussions and using the
limited time effectively.

1.2
Introduction of members

1.2.1 Members and other participants were invited to introduce themselves and gave a
brief introduction on their background and roles in the Project. The list of participants
is attached to this report as Annex I.


2
ORGANISATION OF THE MEETING

2.1
Documentation Available to the Meeting

2.1.1 The Chairperson invited Project Management Office (PMO), Secretariat of the
meeting, to introduce this agenda item. Mr. Isao Endo introduced the working and
information documents prepared by the PMO with emphasis on the reports of
completed and on-going activities under the Component as well as on the reference
materials for the 2nd Phase preparation. The list of documents is attached as Annex
II.

2.2

Organisation of Work

2.2.1 Mr. Endo presented the provisional working programme for the meeting. He
informed that due to the nature of the agenda items to be discussed, the meeting
would be organised in plenary as far as possible. Sessional working groups would
be formed if deemed necessary.

UNDP/GEF/YS/RWG-I.5/3
Page 2

2.2.2 The meeting was conducted in English.


3
ADOPTION OF THE MEETING AGENDA

3.1
The Chairperson introduced the Provisional Agenda and Provisional Annotated
Agenda prepared by the PMO.

3.2
The meeting adopted the agenda with no change, which is attached as Annex III to
this report.


4
EXPECTED OUTPUTS FROM THE 5TH RWG-I MEETING

4.1
The Chairperson invited the Secretariat to present the expected outputs from the
meeting. Referring to Document UNDP/GEF/YS/RWG-I.5/4, Mr. Endo presented a
list of the expected outputs, provided some details for each agenda item's objectives,
and drew attention of participants to the main focal outputs that will be used in
preparation of the 2nd Phase.

4.2
The Meeting noted the expected outputs presented by the Secretariat.


5
REVIEW OF COMPLETED AND ON-GOING INVESTMENT COMPONENT
ACTIVITIES


5.1
Contribution to the preparation of the Strategic Action Programme

Political and Social Acceptance Analysis

5.1.1 Ms. Goueun Lee and Ms. Ming Yu, Consultants of the Political and Social
Acceptance Analysis (PSAA), gave presentations on the results of the PSAA for
Republic of Korea (ROK) and for China, respectively.

5.1.2 After explaining the background and methodology of the study, Ms. Lee presented
analytical results. She mentioned that the SAP was consistent with existing
government policies and guidelines in terms of fisheries, pollution, ecosystem &
biodiversity, and governance. However, Ms. Lee indicated that there were several
aspects in which further efforts would be considered to improve the SAP.
Specifically, she presented nine recommendations to be considered with respect to,
for example, DPRK participation, close co-operation with relevant ministries, and
capacity building of NGOs and local governments.

5.1.3 Ms. Yu presented the analytical results, stating that the SAP was consistent with
China's legislation and policies. She mentioned that most management actions were
supported by existing national plans and laws. Ms. Yu further presented specific
comments provided by various stakeholders, and she suggested recommendations
to address those comments. Ms. Yu concluded that in general, the SAP was
accepted positively by stakeholders, although there were some issues to be
addressed, including the lack of understanding among stakeholders of ecosystem-
based approach that the SAP advocated.

5.1.4 Participants exchanged their views and opinions with the presenters, providing some
suggestions to improve the PSAA reports.

UNDP/GEF/YS/RWG-I.5/3
Page 3

5.1.5 After all questions raised by the participants were duly answered by the consultants,
the Meeting thanked Ms. Lee and Ms. Yu for their works, and suggested that all the
comments provided by the participants to be reflected in the final drafts of the
PSAA, and that the final drafts should be used as a reference to facilitate
endorsement of the SAP by the participating countries
.

Cost-Benefit Analysis of Demonstration Activities

5.1.6 Ms. Wei Zheng, Consultant of economic analysis, presented the progress in
conducting a cost-benefit analysis (CBA) of one of the SAP demonstration activities:
Improvement of sustainable mariculture technique (integrated multi-trophic
aquaculture).

5.1.7 Ms. Zheng explained the concept and methodology to be employed, describing the
demonstration site in Sanggou Bay, based on the data and information provided by
the Yellow Sea Fisheries Research Institute (YSFRI). She mentioned that the
Analysis will be conduced in the close co-operation with YSFRI.

5.1.8 Participating economists provided a wide range of comments with respect to the
methodology. Specifically, participants discussed the following issues: environmental
benefits, valuation methods, discount rates, and externalities. A suggestion was
made to use benefit-cost ratio rather than NPV to avoid the problem of scale in
measured economic value when multiple alternatives would be compared. There
was a discussion on the period of aggregating benefit and cost amounts.
Participants suggested using several valuation methods, comparing results from
different approaches to provide recommendation for the future activities. Having
appreciated the comments, Ms. Wei told that she would consider them and apply
suggested methodologies as much as possible to the CBA.

5.1.9 A suggestion was made to organise a sessional working group meeting with the
economists to discuss and propose alternative methods to be employed to assess
cost-benefit performance of the IMTA demonstration activity. The meeting agreed on
this suggestion.

5.1.10 The working group reported the result of the discussion, providing possible
alternative methods to evaluate cost-benefit performance of the mariculture
demonstration activity. The group emphasised that it was important to review the
availability of data to be analysed before selecting appropriate methods. Participants
emphasized that the key issue of the CBA was to identify (select) appropriate
methods to measure the environmental benefits to be generated from reduced
amount of nutrient loads. As possible methods, the replacement cost method, the
use of proxy variables, and the Emergy approach were suggested. The group then
suggested the use of production function with various parameters (e.g., nutrients)
incorporated. Simple regression analysis would suffice to estimate the relationship
between, for example, nutrient loading and cultured fish production. Ms. Zheng and
other participants noted the proposed methods, appreciating suggestions from the
working group.

5.1.11 After some comments were exchanged and questions were duly answered, the
Meeting encouraged the consultant to further the analysis, considering the
comments and suggestions provided by the participants as well as by the
Sessional group
.


UNDP/GEF/YS/RWG-I.5/3
Page 4
National Strategic Action Plans

5.1.12 Mr. Zhu explained the NSAP preparation conducted by China, highlighting some of
the major components of the Plan. The NSAP Working Group was formed with
national government officials, natural scientists, social scientists, and local
government officials. There were six working group meetings organised in 2008,
leaving the final seventh meeting to be organised in November 2008. Mr. Zhu
reported that the draft NSAP consisting of seven chapters was prepared already.
Those chapters included the management actions for the period of 2009-2020 and
the enforcement mechanism in line with the regional SAP. After discussing the final
draft at the seventh meeting, the Working Group aimed at completing the NSAP and
securing the government endorsement by the end of 2008.

5.1.13 Mr. Sukjae Kwon stated that NSAP Working Group was formed in ROK, and that the
Group would prepare the structure of the NSAP, conduct consultation meetings with
various stakeholders, and create the draft Plan for the government to review and
endorse. He explained the methodology to be used in NSAP preparation: gap
analysis, expert group meeting, and consultation meeting. Gap analysis was to
identify the limitation or "gaps" between ideal and existing policies/actions. The
expert group would be organised under the Working Group, which is in charge of
drafting the NSAP. Mr. Kwon mentioned that the MLTM provided matching funds to
co-finance the work. The Working Group aimed at preparing the NSAP by March
2009.

5.1.14 There was a concern raised about the delay in preparing the NSAP for ROK. The
draft NSAP should be presented and discussed at the next RSTP/PSC meetings in
November 2008. The NSAP preparation should be accelerated.

5.1.15 The Meeting noted the progresses made in each country and suggested to speed
up the process so as to complete the preparation of the NSAPs to provide
inputs to the preparation of the documents for the 2nd phase on time.


Approval of the regional SAP

5.1.16 Representatives of the participating countries were invited to update the meeting on
the status of the Regional SAP approval.

5.1.17 Mr. Huh mentioned that the draft SAP was sent to the relevant ministries in ROK.
The Inter-Ministerial Co-ordination Committee (IMCC) meeting will further discuss the
endorsement issue in November 2008. Mr. Huh had an impression that the
government would be likely to endorse the SAP; there were neither negative
comments nor objections provided by relevant agencies. Ministry of Foreign Affairs
and Trade (MOFAT), GEF focal point, would send the endorsement letter to the
PMO.

5.1.18 Mr. Liang informed the meeting that comments from relevant Chinese governmental
agencies were solicited, and those comments were being analised. Mr. Liang also
informed that the formal request was sent to the Ministry of Finance for their
consideration and approval. He added that it was likely to get the endorsement
without major difficulties.

5.1.19 Considering the signing ceremony of SAP endorsement during the next PSC
meeting, the meeting thought that it would be possible to hold the ceremony. The
meeting suggested inviting a government official at the Director General level
(or his/her representative) of the GEF Focal Point in each participating country


UNDP/GEF/YS/RWG-I.5/3
Page 5
to sign the MOU. The meeting also suggested inviting media to the PSC to
report/broadcast the signing ceremony
. The PMO will contact relevant media
agencies for necessary arrangements.

5.1.20 Having appreciated the efforts made by the National Project Co-ordinators (NPCs),
and relevant ministries in the countries, the Meeting invited the governments to
continue the national consultation in order to secure endorsement of the SAP.

5.2
Data and Information Management ­ Regional GIS Databases & Technical
Workshop


5.2.1 Mr. Zhu of the China-Korea Joint Ocean Research Center (CKJORC) explained the
latest developments of the regional GIS databases, referring to the results of the
technical workshop (Qingdao, China, 23-24 August 2008). Mr. Zhu detailed that
there were several major improvements made, following the suggestions made by
experts who attended the workshop. Those improvements included the following: (i)
introduced new categories (physical, chemical, and biological parameters) to
organise and retrieve data and information, (ii) introduced new GIS maps and
visual/graphical interfaces, and (iii) updated search engine for easy data query and
retrieval.

5.2.2 The meeting was informed that the Korea Ocean Research and Development
Institute (KORDI) expressed its interest in hosting the mirror site at the Institute.
However, there was a suggestion, made by KORDI's experts on data and information
services, to establish the mirror site in the Project's 2nd Phase because there were
not enough data stored in the databases that would require the mirror site at this
moment.

5.2.3 The Meeting thanked the CKJORC and the First Institute of Oceanography for their
dedication to the data and information management. The Meeting suggested for
the Center to continuously improve information service through the databases,
strengthening the network with regional data centres
. Additionally, the Meeting
decided to suggest developing the mirror site during the 2nd Phase when more
data and information were available, considered the comments from the experts.

5.3
Stakeholder Involvement, Public Awareness and Participation

5.3.1 Referring to Document UNDP/GEF/YS/RWG-I.5/5, the Secretariat briefed the
progresses of the following public awareness activities:

· Yellow Sea Partnership*;
· Youth
Programme*;
· Drawing and photo competitions;
· Voluntary internship programme*; and
· Associate Expert programme*.

(Activities with an asterisk (*) are to be continued in 2009.)

5.3.2 Mr. Endo informed the meeting that the Youth Programme, the drawing and photo
competitions, and the voluntary internship programme were successfully
implemented in co-operation with a number of partner organisations, including the
Buan Municipal Government, the China Ocean News, the Korea Marine Rescue
Center, the Korea University, and the Northwest Pacific Action Plan,


UNDP/GEF/YS/RWG-I.5/3
Page 6
5.3.3 The additional information was given to the meeting that Korea University invited
Chinese counterparts to join the Model United Nations (MUN) that will be organised
in February 2009 by the Korea University. The registration fee of Chinese students
attending the MUN would be waived thanks to kind arrangement by the University;
however, other costs of participation will not be covered by the Korea University.

5.3.4 The Meeting acknowledged the progress and encouraged the PMO to continue
public awareness activities as proposed in 2009.

5.4
National Co-ordination and Implementation

5.4.1 Mr. Liang and Mr. Huh presented the reports of national co-ordination in China and
ROK, respectively. The reports covered a wide range of co-ordination activities
taken by the NPCs, including the implementation of Co-operative Cruises, the
facilitation of the SAP endorsement, the preparation of the NSAP, the organisation of
national working group meetings, and the co-ordiantion with relevant agencies for
implementing demonstration activities.

5.4.2 The Meeting acknowledged all the co-ordination activities reported by the
NPCs and thanked them for dedication to the work. The Meeting believed that
the co-ordination work has been and will be greatly contributing to securing the
endorsement of SAP/NSAPs, implementing SAP demonstration activities, and
preparing for the Project's 2nd Phase.

5.5
Small grant projects

5.5.1 Secretariat explained the results and progress in the Small Grants Programme. Mr.
Endo mentioned that the Programme Report was published, that summarised six
completed projects funded in 2006. Five projects funded in 2007 were implemented
as scheduled; three projects were completed already. Following the successful
implementation of the Programme in the past two years, the Project funded five
projects under the Programme in 2008.

5.5.2 Having acknowledged the progress, the meeting thought that the Small Grants
Programme was an effective way to encourage stakeholder participation in Project
activities. The meeting noted that the existing projects funded under the Programme
would be completed by 2009; there will be no new project to be granted in 2009.


6
SCIENTIFIC AND TECHNICAL INPUTS FOR THE 2ND PHASE PROJECT
DOCUMENT


6.1
Review Governance Actions
6.2
Activities required under each governance action
6.3
Inputs for 2nd Phase Project Document - details of how each governance
action should be implemented


6.1.1 Mr. Endo introduced this agenda to the meeting by explaining the progress in the 2nd
Phase preparation, the governance actions suggested by the SAP, and the activities
proposed by Project Phase 2 Working Group. He informed that the meeting should
review the activities proposed for the 2nd Phase, keeping in mind the limited funds
from GEF. The participants were invited to suggest revising or consolidating the
proposed activities, replacing them with new activities, and/or reallocating budgets
according to priorities.


UNDP/GEF/YS/RWG-I.5/3
Page 7
6.1.2 Mr. Endo informed that there was currently no consulting work of cost-benefit
analysis (CBA) of management actions proposed under the "finance" component.
However, the RWG for Fisheries Component (RWG-F) suggested conducting a CBA
of boat buy-back, for which the budget was allocated already. The RWG-F would like
to conduct a CBA of mariculture activities if budget were available. Similarly, the
RWG for Pollution Component would like to have a CBA of management activities
addressing pollution, and the Group asked for the RWG-I to consider allocating
budget to the CBA.

6.1.3 The Meeting worked in plenary to review the proposed activities. Questions were
raised with respect to various activities proposed as Governance Activities, including
the provision of equipment for research and monitoring, the cost and effective
operation (of the YSLME Commission), and the YSLME Clearing House. The
meeting had intensive discussions on harmonisation of domestic legislation. The
meeting shared additional information and explanation provided by Secretariat and
participants, gained clear understanding of the points that were questioned and
discussed, and reached a consensus on all the points.

6.1.4 The meeting discussed the necessity of including cost-benefit analysis of SAP
management actions as one of the 2nd Phase activities, keeping in mind the request
from the RWG-F and the RWG-P. The Meeting then agreed to discuss this issue
further in the next Regional Science and Technical Panel (RSTP) meeting
.

6.1.5 After having exhaustive discussions and making necessary revisions, the Meeting
agreed on the final version of the table of activities. The table is attached to
this document as Annex IV
.


7
OTHER ACTIVITIES TO BE IMPLEMENTED IN 2009

7.1
Information on the operational changes at UNOPS

7.1.1 Secretariat introduced this agenda item by explaining the change taken by UNOPS in
awarding contracts. To make procurement fairer and more transparent, the UNOPS
has introduced a new set of procedures and standards in 2008. The new protocol
applies to every aspect of procurement activity, including soliciting and evaluating
proposals. The UNOPS's Headquarters Contracts and Property Committee
(HQCPC), an evaluation panel, reviews the requests for awarding contracts,
submitted by project management offices, according to the new rules. As a result,
significant delays might be caused in issuing contracts and disbursing funds.

7.1.2 The participants noted the information provided by the PMO.

7.2

Other activities needed

7.2.1 Secretariat overviewed proposed activities for 2009.

7.2.2 Being satisfied with the proposal, the Meeting proposed no other new activities to
be implemented in 2009.


8
WORKPLAN FOR 2009

8.1
Based on a draft workplan prepared by the PMO (Document UNDP/GEF/YS/RWG-I.
5/8), the Meeting discussed and created the workplan for 2009. The agreed

UNDP/GEF/YS/RWG-I.5/3
Page 8
workplan, attached as Annex V, will be submitted to the next PSC Meeting for
its consideration and approval
.


9
PROPOSED CANCELLATION OF 6TH RWG-INVESTMENT MEETING FOR THE
2ND REGIONAL SCIENCE CONFERENCE


9.1
Secretariat proposed to organise the 2nd Regional Science Conference, instead of
the 6th RWG-I meeting, to summarise and present the results and findings of the
Project activities.

9.2 The
Meeting
agreed on the proposal to organise the 2nd Regional Science
Conference, recognising its importance for integrating and disseminating all the
Project outputs.


10
ADOPTION OF THE MEETING REPORT

10.1 The Chairperson led the discussion of the draft meeting report prepared by the
Secretariat. The report was reviewed, amended, and adopted by the Meeting.


11
CLOSURE OF THE MEETING

11.1 Chairperson thanked the participants for their hard work. Mr. Zhu thought the
meeting produced a number of important recommendations for the preparation of
Project's 2nd Phase. He thanked all the contributions that had been made by the
RWG-I members in the last five years.

11.2 Mr. Chang showed his gratitude toward the Chairperson for his strong leadership that
he had exercised since the Project started. Without Mr. Zhu's leadership, Mr. Chang
believed, the RWG-I would not have produced such significant results. Mr. Chang
also extended his gratitude to the participants, especially those from China, for their
commitment to discussing issues in a co-operative way.

11.3 Mr. Jiang joined Mr. Chang to thank the Chairperson for his excellent guidance to
lead the meeting to its successful outcomes. Mr. Jiang thought that the technical
inputs that were provided during this meeting would contribute to Project
implementation in the future, especially the preparation of the 2nd Phase. He thanked
the participants for their hard work and asked for continuous support to the Project.




UNDP/GEF/YS/RWG-I.5/3
Annex I
Page 1
Annex I

List of Participants

People's Republic of China


Mr. Mingyuan ZHU

Mr. Fengkui LIANG
Professor
Director
First Institute of Oceanography, SOA
Department of International Co-operation
6 Xianxialing Road Hi-Tech Industrial Park
State Oceanic Administration
Qingdao, Shandong 266001
1 Fuxingmenwai Avenue
Tel: 86-532-8896-7548
Beijing 100860
Fax: 86-532-8896-7447
Tel: 86-10-6801-9791
Mobile: 86-136-0898-3422
Fax: 86-10-6804-8051
Email: zhumingyuan@fio.org.cn
Email: fkliang@soa.gov.cn


Ms. Jingmei LI
Mr. Tianyun SU
College of Economics
First Institute of Oceanography, SOA
Ocean University of China
6 Xianxialing Road Hi-Tech Industrial Park
23 Hong Kong East Road
Qingdao, Shandong 266001
Qingdao, Shandong 266077
Tel: 86-532-8896-5565
Tel: 86-532-8590-1559(O)
Fax: 86-532-8896-4514
86-532-8581-2346 (H)
Email: sutiany@fio.org.cn
Mobile: 86-138-6395-0669

Fax: 86-532-8590-1560

Email: jingmeili66@yahoo.com

Republic of Korea



Mr. Hak-Bong CHANG

Mr. Sukjae KWON
Head
Director
Marine Environment Policy Research Team
Marine Policy Research Department
Marine Environment & Coastal Management
Korea Ocean Research and Development
Research Division
Institute
Korea Maritime Institute
1270 Sa-dong, Sangnok
1027-4, Bangbae 3-dong, Seocho-gu
Ansan City, Gyeonggi Province, 426-744
Seoul 137-851
Tel: 82-31-400-6502
Tel: 82-2-2105-2763
Fax: 82-31-400-6505
Fax: 82-2-2105-2779
Email: sjkwon@kordi.re.kr
Email: hbchang@kmi.re.kr; hbchang-

1@hanmail.net


Ms. Jeong-In CHANG

Senior Researcher
Marine Environment & Coastal Management
Research Department
Korea Maritime Institute
15F 1652 Sangam-dong, Mapo-gu
Seoul 121-270Tel: 82-2-2105-2945
Fax: 82-2-2105-2779
Email: jeongin@kmi.re.kr


UNDP/GEF/YS/RWG-I.5/3
Annex I
Page 2

Consultant


Ms. Goueun LEE

Ms. Ming YU
Graduate School of International Studies,
Law School of Ocean University of China
Korea University
No. 23 Hong Kong Dong Road,
5-1 Anam-dong Seonbuk-gu
Qingdao, Shandong Province, 266071,
Seoul 136-701
China
Republic of Korea
Tel. 86-532-8598-1335
Tel: 82-2-3290-2424
Fax: 86-532-8598-1335
Fax: 82-2-303-7838
Mobile: 86- 13964259972
Mobile: 82-10-2471-7431
Email: yumingnancy@hotmail.com
Email: goxsparkles@gmail.com

Ms. Wei ZHENG


Marine Ecology Research Center
First Institute of Oceanography, State
Oceanic Administration
6 Xianxialing Road, Qingdao, Shandong,
266061,
China
Tel: 86-532-8896-7435
Email: susan0537@163.com

Observer


Mr. Hyung-Tack HUH


Sr. Scientist Emeritus,
Korea Ocean Research Development
Institute
253, Yonghyun-Dong, Nam-Gu
Incheon 402-751
Republic of Korea
Tel: 82-31-400-6201
Fax: 82-31-408-5934
Email: hthuh@kordi.re.kr

Project Management Office (PMO)


Mr. Yihang JIANG

Mr. Isao ENDO
Project Manager
Environmental Economics Officer
UNDP/GEF Yellow Sea Project
UNDP/GEF Yellow Sea Project
Korea Ocean Research and Development
Korea Ocean Research and Development
Institute
Institute
1270 Sa-dong, Sangnok
1270 Sa-dong, Sangnok
Ansan City, Gyeonggi Province 426-744
Ansan City, Gyeonggi Province 426-744
Republic of Korea
Republic of Korea
Tel: 82-31-400-7825
Tel: 82-31-400-7793
Fax: 82-31-400-7826
Fax: 82-31-400-7826
Email: yihang@yslme.org
Email: isao@yslme.org



UNDP/GEF/YS/RWG-I.3/3
Annex I
Page 3

Mr. Junghwa KIM

Secretary
UNDP/GEF Yellow Sea Project
Korea Ocean Research and Development
Institute
1270 Sa-dong, Sangnok
Ansan City, Gyeonggi Province 426-744
Republic of Korea
Tel: 82-31-400-7829
Fax: 82-31-400-7826
Email: junghwa@yslme.org

Secretariat



Ms. WANG Wenqi


Vice Director of Foreign Affairs Office
First Institute of Oceanography, SOA
6 Xianxialing Road Hi-Tech Industrial Park
Qingdao, Shandong 266001 China
Tel: 86-532-8896-3909
Fax: 86-532-8896-7548
Email: wangwq@fio.org.cn





UNDP/GEF/YS/RWG-I.5/3
Annex II
Page 1
Annex II

List of Documents

Working Documents


UNDP/GEF/YS/RWG-I.5/1 Provisional
Agenda

UNDP/GEF/YS/RWG-I.5/2
Provisional Annotated Agenda

UNDP/GEF/YS/RWG-I.5/3
Report of the Meeting (to be prepared at the meeting)

UNDP/GEF/YS/RWG-I.5/4
Expected Outputs From the 5th RWG-I Meeting

UNDP/GEF/YS/RWG-I.5/5
Completed and On-going Investment Component Activities


UNDP/GEF/YS/RWG-I.5/6
Scientific and Technical Inputs for the 2nd Phase Project
Document

UNDP/GEF/YS/RWG-I.5/7
Investment Component Activities for 2009

UNDP/GEF/YS/RWG-I.5/8
Investment Component's Workplan for 2009



Information Documents

UNDP/GEF/YS/RWG-I.5/inf.1 Provisional List of Documents

UNDP/GEF/YS/RWG-I.5/inf.2
Provisional List of Participants

UNDP/GEF/YS/RWG-I.5/inf.3
Provisional Working Programme for the Meeting

UNDP/GEF/YS/RWG-I.4/3
Report of the "Fourth Meeting of the Regional Working
Group for the Investment Component"

UNDP/GEF/YS/RSP.4/3
Report of the "Fourth Meeting of the Regional Scientific and
Technical Panel"

UNDP/GEF/YS/PSC.4/3
Report of the "Fourth Meeting of the Project Steering
Committee"

UNDP/GEF/YS/AWG.3/3
Report of the "Third Meeting of the Strategic Action

Programme Ad-hoc Working Group"

UNDP/GEF/YS/SPSC.2/3
Executive Summary of the "Second Special Meeting of the

Project Steering Committee"

UNDP/GEF/YS/SAP
Draft Regional SAP




UNDP/GEF/YS/RWG-I.5/3
Annex III
Page 1
Annex III

Agenda

1.
OPENING OF THE MEETING

1.1
Welcome Addresses
1.2
Introduction of Members

2.
ORGANISATION OF THE MEETING

2.1
Documents Available to the Meeting
2.2
Organisation of Work

3.
ADOPTION OF THE MEETING AGENDA

4.
EXPECTED OUTPUTS FROM THE 5TH RWG-I MEETING

5.

REVIEW OF COMPLETED AND ON-GOING INVESTMENT COMPONENT
ACTIVITIES

5.1
Contribution to the preparation of the Strategic Action Programme
(SAP)

5.2
Data and Information Management ­ Regional GIS Databases &
Technical Workshop

5.3
Stakeholder Involvement, Public Awareness and Participation
5.4
National Co-ordination and Implementation
5.5
Small grant projects

6.
SCIENTIFIC AND TECHNICAL INPUTS FOR THE 2ND PHASE PROJECT
DOCUMENT


6.1
Review Governance Actions
6.2
Activities required under each governance action
6.3
Inputs for 2nd Phase Project Document - details of how each
governance action should be implemented


7.

OTHER ACTIVITIES TO BE IMPLEMENTED IN 2009

7.1
Information on the operational changes at UNOPS
7.2
Other activities needed

8.

WORKPLAN FOR 2009

9.
PROPOSED CANCELLATION OF 6TH RWG-INVESTMENT MEETING FOR
THE 2ND REGIONAL SCIENCE CONFERENCE


10.
ADOPTION OF THE MEETING REPORT

11.
CLOSURE OF THE MEETING




UNDP/GEF/YS/RWG-I.5/3
Annex IV
Page 1


















Annex IV

Agreed Activities and Budget Table for Governance



activity table for P2WG after rwg befpi_15oct08
Required
Activities
Implementation
GEF
China
ROK
DPRK
nat'l total
Others
Total
National
in cash
in kind
in cash
in kind
in cash
in kind
2 co-ordinating meetings/year *
20,000
24,000
2,000
5000
48000
51,000
51,000
4 yrs=8 meetings *3000 * 2
Continue inter-ministry
countries (nat'l)
Committee
Exchange experiences
15000
1000
2000
30000
18,000
18,000
among the participating
countries
2 visits
2 co-ordinating meetings/year *
14,000
5,000
2,000
10,000
10,000
17,000
31,000
strengthen the National
4 yrs=8 meetings *3000
Commission for
Environment Protection as
inter-ministry mechanism
Improve communication
6,000
1500
3000
3,000
3,000
7,500
13,500
and co-ordination of nat'l
2 training * 3000, operation:
agencies
3000
2 persons *600*48
46,600
15000
5000
30,000
30,000
50,000
96,600
Establish nat'l co-ordinating months+forniture 4,000+office
office (incl. Dalian office)
rent 15000
obtain necessary data &
25,000
10000
2000
15,000
15,000
27,000
52,000
info for preparing national institutional contracts to collect
management plan
data & info.
Preparing the national
4,000
1000
2000
2,000
2,000
5,000
9,000
management plan (Nat'l
Two nat'l experts consultatiom
SAP)
*3000
Providing necessary
Investigation of requirements;
400,000
400000
10000
20000
430,000
830,000
equipment for marine
preparing a list of required
environment research and equipment; providing the
monitoring
equipments
Exchange experts to gain
5,400
100000
1000
5000
106,000
111,400
updated knowledge on
exchange6 scientists.
marine environment
*80/day*30 + 6 travel *500
0
351,403
project staff
351,403

Travel
37,991

37,991
UNOPS 6%
53,424

53,424
943,817
20,000
0
71,500
500,000
28,000
92,000
711,500
1,655,317
Acitivity without salary, travel,
unops
501,000
Ratio=Activity / Activity total
12.69%
Capacity

activity table for P2WG after rwg befpi_15oct08
Budget
Required
Activities
implementation2
GEF
China
ROK
DPRK
National
TOTAL Nat'l Others
Total
Institutional building
in cash
in kind
in cash
in kind
in cash
in kind
-
-
Establish YSLME
Commission:
-
-
Organise steering
1 meeting x 15,000 x 4
committee meetings
years
60,000 20,000
-
20,000
80,000
Organise sub-
commission meetings
5 sub-commissions x 1
meeting x 7500 x 4 years
(combine with above
meeting)
150,000 50,000
-
50,000
200,000
Evaluation of SAP and 3 consultants x 1mth x
NSAP implementation
8000
24,000
250,000
5,000
255,000
279,000
Strengthening the
secondment of
participation of the
government officials
member countries:
develop exchange
program to send
government officials to the
secretariat; nat'l govt
sources
250,000
-
500,000 250,000
250,000
Cost & effecitve operation
of the Commssion
strengthening
partnerships and develop
joint programme(s) to
share available resources
with existing regional
institutions such as
NOWPAP, PEMSEA,
WESPAC, and etc.; 2 joint
programmes
20,000
-

5,000
5,000
25,000
IMCC & NWGs
develop the gudelines to
manage the IMCC &
NWGs - NPC's
responsibility(PMO)
24,000
3,000

3,000
27,000
NPC
NPC needs to become a
member of YSLME
Commission, nat'l -
$3000x48mthx3ctrs
100,000 100,000
166,000
332,000 266,000
366,000
Project Management
project staff
265,130

-
265,130
Travel
29,267

-
29,267
UNOPS 6%
40,344

-
40,344
712,741
420,000
0
166,000
250,000
0
13,000
832,000
849,000
0
1,561,741
Acitivity without salary,
travel, unops
378,000
Ratio=Activity / Activity
total
9.57%
Commission

activity table for P2WG after rwg befpi_15oct08
Budget
Required
Activities
implementation2
GEF
China
ROK
DPRK
TOTAL Nat'l Others
National
in cash
in kind
in cash
in kind
in cash
in kind
Legislation
-
Improve the effectiveness
of legal instruments:
-
Develop regional
guidelines for Code of
Conduct for
Responsible Fisheries in consultant 3 person
YSLME context
month x 8,000
24,000
-

5,000

5,000
29,000
identify and develop the
guidelines to deal with
Develop guidelines for
the matters not covered
matters not covered by
by UNCLOS, CBD &
UNCLOS, CBD, &
Ramsar, consultant 6
Ramsar.
person months x 8,000
48,000
-

5,000

5,000
53,000
identify the gaps
between the domestic
and regional standards;
consultant 3 person
harmonize domestic
month x 8,000 x 3
legislation
countries
24,000
24,000

24,000

6,000

48,000

54,000
78,000
information exchange on develop a YSLME
implementation on treaties Clearing House, operation
and domestic legistlation cost 5,000x4yrs
20,000
20,000

-

6,000

26,000
46,000
Project Management
project staff
81,363

-
81,363
Travel
10,685

-
10,685
UNOPS 6%
12,483

-
12,483
220,531
44,000
0
24,000
0
0
22,000
90,000
0
310,531
Acitivity without salary,
travel, unops
116,000
Ratio=Activity / Activity
total
2.94%
Legal

activity table for P2WG after rwg befpi_15oct08
Budget
Required
Activities
implementation2
GEF
China
ROK
DPRK
National
TOTAL Nat'l Others
in
in cash
in kind
in cash
in kind
in cash
kind
Partnership
-
0
delevop partnership
mechanism with the
Agreement on
Environmental
Cooperation between
China and ROK; joint
activity with the Joint
Strenghening
Committee on
Partnerships with exisitng Environmental
bilateral mechanisms
Cooperation
25,000 25,000

-
100,000

125,000
150,000
develop partnership
mechanisms with
PEAMSEA, NOWPAP,
WESPAC, etc. to avoid
duplication , including
developing a guideline to
strengthen partnership; in
Strenghening partnerships conjunction with "Cost &
with exisitng regional
effecitve operation" under
mechanisms
"Commission" sub-table
50,000
-
100,000

100,000
150,000
Project Management
project staff
52,605

-
52,605
Travel
7,778

-
7,778
UNOPS 6%
8,123

-
8,123
143,506
25,000
0
0
200,000
0
0
225,000
0
368,506
Acitivity without salary,
travel, unops
75,000
Ratio=Activity / Activity
total
1.90%
Partners

activity table for P2WG after rwg befpi_15oct08
Budget
Required
Activities
implementation2
GEF
TOTAL Nat'l Others
China
ROK
DPRK
National
in
in cash
in kind
in cash
in kind
in cash
kind
Economic incentives
-
0
Integrate econ analysis
into national workplan
2 training workshops
30,000 20,000

-
20,000
50,000
microfinance 2 sectors or
Establish microfinance
industries x20 cases
schemes
(3,000 per case)
120,000
-
-
120,000
2 sectors/alternative
livelihoods, income tax
Introduce preferential tax exemption, $5000x60
system
cases
150,000
75,000

150,000

75,000
225,000
Project Management
project staff
210,421

-
210,421
Travel
23,735

-
23,735
UNOPS 6%
32,049
-
32,049
566,205
20,000
0
75,000
0
0
0
95,000
0
661,205
Acitivity without salary,
travel, unops
300,000
Ratio=Activity / Activity
total
7.60%
Finance

UNDP/GEF/YS/RWG-I.5/3
Annex V
Page 1


















Annex V

Investment Component Workplan for 2009



ID
Task Name
Duration
Start
Finish
2005 Qtr 2005 Qtr 2005 Qtr 2005 Qtr 2006 Qtr 2006 Qtr 2006 Qtr 2006 Qtr 2007 Qtr 2007 Qtr 2007 Qtr 2007 Qtr 2008 Qtr 2008 Qtr 2008 Qtr 2008 Qtr 2009 Qtr 2009 Qtr 2009 Qtr 2009 Qtr
Jan e
a Apr a Jun Jul u e Oct o e Jan e
a Apr a Jun Jul u e Oct o e Jan e
a Apr a Jun Jul u e Oct o e Jan e
a Apr a Jun Jul u e Oct o e Jan e
a Apr a Jun Jul u e Oct o e
1
OBJECTIVE V: DEVELOPMENT OF REGIONAL INSITUTIONS AND
1320 days?
Fri 04-12-31
Thu 09-12-31
CAPACITIES
2
VA. Stakeholders
1305 days?
Mon 05-01-03
Fri 09-12-11
3
ACT 1: Identify stakeholders and assess their capacities
137 days?
Wed 06-03-01
Thu 06-09-07
for contributing to environmental management and
decision-making
4
Contract to institutions(experts)(Contract)--Governance Analy
132 days?
Wed 06-03-01
Thu 06-08-31
5
Produce a regional list (PMO)
5 days?
Fri 06-09-01
Thu 06-09-07
6
ACT 2: Strengthen stakeholder capacities
1009 days?
Mon 06-02-20
Fri 09-12-11
7
Prepare training materials for all stakeholders (contract)
761 days?
Mon 06-02-20
Wed 08-12-31
8
Training for decision makers (Training 1)--Local Government
3 days?
Tue 07-07-10
Thu 07-07-12
9
Training for community trainers (Training 2)--Small grants
2 days?
Mon 07-09-03
Tue 07-09-04
10
Training for local governmental officers (Training 3)--Local Go
3 days?
Mon 06-09-25
Wed 06-09-27
11
Intern programme--Full time & voluntary
1002 days?
Wed 06-03-01
Fri 09-12-11
12
Site visits by government officials--Local Government Training
1 day
Wed 06-09-27
Wed 06-09-27
13
"The Yellow Sea and Youth"--Youth Programme
15 days
Thu 06-09-14
Wed 09-08-19
14
ACT 3: Encourage routine and effective involvement of
1305 days?
Mon 05-01-03
Fri 09-12-11
stakeholders in environmental and resource
management and decision-making
15
Publish newsletters of the project
1305 days?
Mon 05-01-03
Fri 09-12-11
16
Printing newsletters
1305 days?
Mon 05-01-03
Fri 09-12-11
17
Regular stakeholders conference (1/yr)--YSP regular meeting
5 days?
Wed 06-03-15
Tue 09-09-29
18
VB. Regional Coordination
1319 days?
Mon 05-01-03
Thu 09-12-31
19
ACT 1: Create a functioning regional coordination
65 days?
Mon 05-01-03
Fri 05-04-01
mechanism to carry out the YSLME Project
20
Programme Coordinator
65 days?
Mon 05-01-03
Fri 05-04-01
21
Economist
65 days?
Mon 05-01-03
Fri 05-04-01
22
Scientific Officer
65 days?
Mon 05-01-03
Fri 05-04-01
23
Public Advisor
65 days?
Mon 05-01-03
Fri 05-04-01
24
Local Staff at PMO:
65 days?
Mon 05-01-03
Fri 05-04-01
25
Secretary
65 days?
Mon 05-01-03
Fri 05-04-01
26
Driver
65 days?
Mon 05-01-03
Fri 05-04-01
27
Administrative Assistant
65 days?
Mon 05-01-03
Fri 05-04-01
28
Administrative Officer
65 days?
Mon 05-01-03
Fri 05-04-01
29
IT Supporting staff
65 days?
Mon 05-01-03
Fri 05-04-01
30
ACT 2: Prepare TDA
136 days?
Tue 06-08-01 Wed 07-01-31
31
Review preliminary TDA, and suggest improvements (consulta
4 days?
Tue 06-08-01
Fri 06-08-04
32
Discuss draft, and decide new format (WG meeting 3)
3 days?
Sat 06-09-09
Tue 06-09-12
33
Gathering data & info from national review report on the
13 days?
Thu 06-09-14
Sat 06-09-30
project components (PMO)
34
Second draft of TDA (consultant)
21 days?
Tue 06-10-03
Tue 06-10-31
35
2nd discussion on the draft (RSTP, PSC)
4 days?
Thu 06-11-16
Tue 06-11-21
36
Revise the TDA
16 days?
Fri 06-11-24
Fri 06-12-15
37
Finalise TDA
16 days?
Mon 06-12-18
Thu 07-01-04
38
Printing the final TDA
19 days?
Fri 07-01-05
Wed 07-01-31
39
Act 3: Prepare Regional SAP
487 days?
Mon 07-03-05 Wed 08-12-31
40
Guideline for cost-benefit analysis
200 days
Mon 07-03-05
Fri 07-11-30
41
Prepare a draft regional SAP (consultant)
26 days
Mon 07-12-03
Sat 08-01-05
42
Discuss the draft at the WG meeting-Drafting group 1st
25 days
Mon 08-01-07
Fri 08-02-08
43
Revise the draft SAP & prepare version #2
45 days?
Mon 08-01-21
Fri 08-03-21
44
Discuss version #2-Drafting group 2nd, special PSC
40 days
Mon 08-03-24
Fri 08-05-30
45
Revise the draft SAP, & prepare version #3
41 days?
Sat 08-05-31
Fri 08-07-25
46
Discuss version #3, & finalise the regional SAP (RSTP, PSC )-
87 days
Mon 08-07-28
Fri 08-11-21
47
Printing regional SAP
25 days?
Thu 08-11-27
Wed 08-12-31
48
Act 4: Prepare nat'l SAP
397 days?
Mon 07-12-31
Tue 09-06-30
49
Assess all national information & prepare for a framework of
109 days?
Wed 08-01-02
Fri 08-05-30
50
National meetings-1 on NYSAP
54 days?
Mon 07-12-31
Wed 08-03-12
51
Revise NYSAP
123 days?
Mon 08-05-12
Fri 08-10-24
52
Finalise NYSAP
228 days?
Mon 08-04-14
Fri 09-02-20
53
Print NYSAP
71 days?
Tue 09-03-24
Tue 09-06-30
54
Act 5: Partners of the Yellow Sea
1305 days?
Fri 05-01-21
Thu 09-12-31
55
Create partnerships with other organisations and projects--YS
1305 days?
Fri 05-01-21
Thu 09-12-31
56
VC: NATIONAL INSTITUTIONS
1305 days?
Mon 05-01-03
Fri 09-12-11
57
ACT 1: Review and assess national institutions to support
127 days?
Fri 05-07-01
Fri 05-12-23
58
Contract to nat'l focal points (Contract)
87 days?
Fri 05-07-01
Mon 05-10-31
59
Finalise the review report (WG meeting)
39 days
Wed 05-11-02
Fri 05-12-23
60
ACT 2: Facilitate national institutions to be effective
1305 days?
Mon 05-01-03
Fri 09-12-11
stewards of the YSLME

ID
Task Name
Duration
Start
Finish
2005 Qtr 2005 Qtr 2005 Qtr 2005 Qtr 2006 Qtr 2006 Qtr 2006 Qtr 2006 Qtr 2007 Qtr 2007 Qtr 2007 Qtr 2007 Qtr 2008 Qtr 2008 Qtr 2008 Qtr 2008 Qtr 2009 Qtr 2009 Qtr 2009 Qtr 2009 Qtr
Jan e
a Apr a Jun Jul u e Oct o e Jan e
a Apr a Jun Jul u e Oct o e Jan e
a Apr a Jun Jul u e Oct o e Jan e
a Apr a Jun Jul u e Oct o e Jan e
a Apr a Jun Jul u e Oct o e
61
Local project office, Provision of necessary equipment
520 days?
Mon 05-01-03
Tue 06-12-26
62
Enhance communications
1305 days?
Mon 05-01-03
Fri 09-12-11
63
Provide technical trainings
125 days?
Mon 06-07-03
Mon 09-07-27
64
Seminars for research community
1305 days?
Mon 05-01-03
Fri 09-12-11
65
Study tours for govt officials 1/yr (local govt)--Local Governm
3 days?
Mon 06-09-25
Wed 06-09-27
66
Act 3: Establish National Coordination Unit within
495 days?
Mon 05-02-14
Sun 06-12-31
existing framework to assure intersectoral coordination
67
Establish IMCC (meeting to decide)
65 days?
Wed 06-10-04
Sun 06-12-31
68
Appoint NPC
65 days?
Mon 05-02-14
Fri 05-05-13
69
Establish NCU (need equipment, staff)
65 days?
Mon 05-10-03
Thu 05-12-29
70
Establish NWGs
65 days?
Mon 05-10-03
Thu 05-12-29
71
Act 4: Develop proposals to strengthen national
548 days?
Mon 05-01-03 Wed 07-01-31
institutions to enhance their ability to contribute to
environmental management and decision-making
72
Together with Activity 2, Strengthen national institutions to
548 days?
Mon 05-01-03
Wed 07-01-31
be part of TDA development
73
VD: FINANCIAL INSTRUMENTS
992 days?
Mon 06-01-02 Wed 09-09-30
74
ACT 1: Review status and potential for financial
141 days?
Wed 06-03-01
Tue 06-09-12
sustainability of YSLME regional institutional framework
75
Contract to institution (contract to national focal point)--Gove
132 days?
Wed 06-03-01
Thu 06-08-31
76
Discuss & finalise the review report (WG meeting 3)
3 days?
Sat 06-09-09
Tue 06-09-12
77
ACT 2: Provide training in environmental project
746 days?
Sat 06-09-09
Tue 09-06-30
identification and preparation
78
Identify the training needs (WG meeting 3)
3 days
Sat 06-09-09
Tue 06-09-12
79
Training #1 Project document preparation
2 days?
Mon 07-10-22
Tue 07-10-23
80
Training #2 Fund raising
22 days
Mon 09-06-01
Tue 09-06-30
81
ACT 3: Assist and encourage the continuation of project
203 days?
Mon 08-02-04
Fri 08-11-07
preparation and feasibility studies for long-term
environmental investment to implement the SAP and
82
Prepare draft proposal (consultant)--Financial Sustainability,
86 days?
Mon 08-02-04
Sat 08-05-31
83
PSC to discuss
5 days
Mon 08-11-03
Fri 08-11-07
84
ACT 4: Provide matched fund for small grant project
794 days?
Mon 06-01-02 Mon 08-12-29
85
Identify the topics of small grant project (PMO)
66 days?
Mon 06-01-02
Wed 08-01-30
86
Provide matched funds for the approved projects (contracts )
725 days?
Wed 06-02-01
Mon 08-12-29
87
Matched grants
725 days?
Wed 06-02-01
Mon 08-12-29
88
ACT 5: Provide funding for pre-feasibility studies of
549 days?
Mon 07-09-03 Wed 09-09-30
promising technologies and industries to help achieve
the goals of the YSLME, to create an investment portfolio
89
Prepare pre-feasibility studies (consultant)-Technical F/S
66 days?
Mon 07-09-03
Fri 07-11-30
90
Discuss & finalise pre-feasibility study(WG meeting, RSTP)
54 days?
Mon 07-09-17
Wed 07-11-28
91
Submit to PSC for approval
2 days?
Thu 07-11-29
Fri 07-11-30
92
Demonstration projects (contracts)--CBA of Demo projects
410 days
Wed 08-03-12
Wed 09-09-30
93
VE: DATA AND INFORMATION MANAGEMENT
1320 days?
Fri 04-12-31
Thu 09-12-31
94
ACT 1: Determine regional data and information
216 days?
Mon 05-01-03 Mon 05-10-31
management capabilities
95
Review regional data & info systems, i.e. regional data
129 days?
Mon 05-01-03
Thu 05-06-30
centre, NEAR-GOOS, NOWPAP DINRAC, (consultant)
96
Prepare a proposal for DIM (consultant)
87 days?
Fri 05-07-01
Mon 05-10-31
97
ACT 2: Develop an effective regional DIM strategy to
1320 days?
Fri 04-12-31
Thu 09-12-31
help achieve the goals of the YSLME
98
Decide where database should be hosted
130 days?
Fri 04-12-31
Thu 05-06-30
99
Discuss and approve DIM proposal, including guidelines (WG
25 days
Tue 05-11-15
Sat 05-12-17
100
Equipment (GIS software, hardware)
109 days?
Mon 06-04-03
Thu 06-08-31
101
Training on DIM--Technical workshop
1 day?
Sun 08-08-24
Sun 08-08-24
102
Operation of DIM
875 days
Wed 06-09-13
Thu 09-12-31
103
ACT 3: Implement the regional DIM strategy, including
79 days?
Fri 06-09-15
Sun 06-12-31
equipment, facilities, and communications
104
To identify sustainable means for the DIM
79 days?
Fri 06-09-15
Sun 06-12-31
105
VF: Public Awareness and Participation
1319 days?
Mon 05-01-03
Thu 09-12-31
106
ACT 1: Develop a public awareness campaign
444 days?
Mon 05-01-03
Tue 06-09-12
107
Preparation of public awareness campaign (PMO)--Public Awa
326 days?
Mon 05-01-03
Fri 06-03-31
108
Agree on the campaign (WG meeting 3)
3 days
Sat 06-09-09
Tue 06-09-12
109
ACT 2: Demonstrate regional public awareness/participati
517 days?
Wed 05-11-02
Sat 07-10-13
110
Organise public awareness conferences (contracts)--Parliame
5 days
Tue 06-03-28
Sat 07-10-13
111
Prepare public awareness materials (Contracts)
174 days?
Wed 05-11-02
Fri 06-06-30
112
Produce multi-media, e.g. project pins, mouse pads, posters,
174 days
Wed 05-11-02
Fri 06-06-30
113
Public awareness training-twice
1 day
Mon 07-01-01
Mon 07-01-01
114
ACT 3: Encourage ongoing public awareness and
1305 days?
Fri 05-01-21
Thu 09-12-31
participation activities to help achieve the goals of the
115
1305 days?
Fri 05-01-21
Thu 09-12-31

Agreed Investment Component Workplan for 2009 (Condensed)

Activity Timeline
Public awareness activities:


4th Yellow Sea Partnership Workshop
Sep/Oct 2009

4th Youth Programme
Aug 2009

Voluntary Internship Programme
Year-round

Associate Expert Programme
Year-round

Co-operation with other Organisations and Year-round
Projects

SAP/NSAP

preparation/implementation:

CBA of demonstration activities (ongoing)
Second half of 2008 ­ first half of 2009

National co-ordination:


Training on fund raising
First half of 2009

Data and information management:


Operation and maintenance of the
Year-round
regional GIS and meta databases

Cross component:


2nd Regional Science conference
Autumn 2009