Request for CEO endorsement/Approval

Project Type: Medium-sized Project

the GEF Trust Fund




Submission Date: 23 March 2007

Re-submission Date: 30 July 2008

Expected Calendar

Milestones

Dates

Work Program (for FSP)

N/A

GEF Agency Approval

Sept 2008

Implementation Start

Oct 2008

Mid-term Review (if planned)


Implementation Completion

Sept 2011


part i: project Information

GEFSEC Project ID:      

gef agency Project ID: PIMS 3362, ATLAS 00053807

Country(ies): Botswana

Project Title: Accruing Multiple global benefits through Integrated Water Resource Management/Water Use Efficiency Planning: A demonstration project for sub-Saharan Africa

GEF Agency(ies): UNDP

Other Executing partner(s): Government of Botswana

GEF Focal Area(s): Medium-sized ProjectInternational Waters

GEF-4 Strategic program(S): IW-SP3-Freshwater Basins

Name of parent program/umbrella project:      

  1. Project framework (Expand table as necessary)

Project Objective: To facilitate national processes and development of institutional mechanisms, supported by and contributing to regional knowledge management processes, for efficient and equitable IWRM planning

Project Components

Indicate whether Investment, TA, or STA**

Expected Outcomes

Expected Outputs

GEF Financing*


Co-financing*


Total ($)


($)

%

($)

%

1. IWRM Plan for Botswana

TA

OUTCOME 1: A dynamic IWRM Plan developed, adopted and implemented for Botswana, which addresses national and trans-boundary water management priorities, integrate global environmental management objectives, and balances multiple uses of water resources

1.1 An assessment of issues and the status of water resources management 1.2 Water resources management issues and actions identified, prioritized and strategized 1.3 National level institutions for IWRM established and cross-sectoral institutional coordination and stakeholder participation mechanisms for integrated water resources planning and transboundary water resources management developed and established 1.4 A dynamic IWRM Plan prepared

222,000

8%

2,500,000

92%

2,722,000

2. Regional Knowledge Management

TA

OUTCOME 2: Increased awareness and capacity of national and regional stakeholders (government, private sector and members of the public) to engage in the IWRM (planning and implementation) process

2.1 Consistent and practical guidance for IWRM developed and made available 2.2 Institutional changes to facilitate stakeholder participation implemented 2.3 Knowledge and awareness about IWRM created, and information disseminated, at national and regional level 2.4 Bi-directional mechanisms to incorporate national and trans-boundary concerns, agreements and processes into respective water resources planning and management arrangements established

309,000

12%

2,310,000

88%

2,619,000

3. IWRM and Water Use Efficiency Demonstration Project

TA

OUTCOME 3: Pilot Project: Water conservation through conjunctive Use of Grey-water Re-use and harvested rainwater in schools within Botswana: A Case for IWRM and WE Plan Implementation 3.1 Water conservation measures implemented and demonstrated at selected schools as part of IWRM and WE Plan in Botswana and lessons learned documented and disseminated across the region. 3.2 Increased awareness and capacity of national and regional stakeholders (Government, private sector and members of the public) to roll out water conservation and management programmes and actions at public/priate institutions throughout Botswana and beyond

3.1.1 Schools participating in the pilot identified through stakeholder consultation 3.1.2 An assessment of capacities of schools for water resources conservation and management conducted, including the identification of 1) technical capacity needs 2) infrastructure needs and 3) m3/month that can be potentially saved through water conservation measures at each participation school. 3.1.3 Water resources conservation and management programmes and actions identified, costed, prioritized and strategized at each school and the corresponding M&E framework developed 3.1.4 Water conservation and management programmes and actions implemented at each school to realize # m3/month saving of water by the end of year 3. (The appropriate quantitative conservation target for each school will be determined through 3.1.2 and 3.1.3.) 3.1.5 Cross-sectoral coordination (e.g. between DWA and schools) and stakeholder participation mechanisms established to monitor and evaluate the pilot project implementation at schools. 3.2.1 Practical (step-by-step) guidelines for formulation and implementation of the water conservation and management programme and action at a school/ institution developed and made available to wider national audience 3.2.2 Institutional capacities for adoption of IWRM enhanced. 3.2.3 Lessons learned on the cross-sectoral coordination and stakeholder participation for the effective M&E for water conservation and management programme and actions extracted and disseminated widely throughout Botswana and beyond.

350,000

5%

6,430,000

(This amount includes the direct cash contribution to the Demonstration project (USD980,000), estimated portion of in-kind contribution allocated to support the implementation of the demonstration project (i.e., seconded senior official, admin support, office space, and transport, etc.) and longer-term co-financing commitment made by the GoB in NDP 10, including infrastructure development. See footnote 4 in Annex F)

95%

6,780,000

4. Project management

94,000

14%

580,000

86%

674,000

Total Project Costs

975,000

7.6%

11,820,000

92.4%

12,795,000

* List the $ by project components. The percentage is the share of GEF and Co-financing respectively to the total amount for the component.

** TA = Technical Assistance; STA = Scientific & technical analysis.



B. Financing Plan Summary For The Project ($)


Project Preparation*

Project

Agency Fee

Total at CEO Endorsement

For the record:

Total at PIF

GEF

25,000

975,000

100,000

1,100,000

n/a

Co-financing

60,000

11,820,000


11,880,000

n/a

Total

85,000

12,795,000

100,000

12,980,000

n/a

* Project preparation done with PDF-A funding from GEF-3. See Annex D for more details about PDF-A implementation.

C. Sources of confirmed Co-financing, including co-financing for project preparation for both the PDFs and PPG.

(expand the table line items as necessary)

Name of co-financier (source)

Classification

Type

Amount ($)

%*

Government of Botswana

Nat'l Gov't

In kind/Parallel

10,660,000**

90%

Global Water Partnership - SA

NGO

Grant

300,000

2%

UNDP

Impl. Agency

In kind/Parallel

920,000

8%

Total Co-financing

11,880,000

100%

* Percentage of each co-financier’s contribution at CEO endorsement to total co-financing.

** The initial co-financing letter from the Government of Botswana that was submitted to GEFSEC in March 2007, accounted for only the co-financing (USD900,000) coming from the national budget allocated for the 9th National Development Plan (ending in 2009). During 2008, the 10th National Development Plan (NDP 10) and its budget was finalized, which enabled the government to commit the additional USD9.7 million as co-financing to the proposed GEF medium-sized project. The additional co-financing from NDP 10 is confirmed by the additional co-financing letter provided by the Government of Botswana.



D. GEF Resources Requested by Focal Area(s), Agency(ies) or Country(ies)

GEF Agency

Focal Area

Country Name/

Global

(in $)

Project Preparation


Project

Agency

Fee


Total

UNDP

IW

Botswana

25,000

975,000

100,000

1,100,000

Total GEF Resources

25,000

975,000

100,000

1,100,000

* No need to provide information for this table if it is a single focal area, single country and single GEF Agency project.

E. Project management Budget/cost

Cost Items

Total Estimated person weeks

GEF

($)

Other sources ($)

Project total ($)

Local consultants*

210

89,000

330,000

419,000

Office facilities, equipment, vehicles and communications**


0

220,000

220,000

Travel**


0

0

0

Miscellaneous


5,000

30,000

35,000

Total

     

94,000

580,000

674,000

* Provide detailed information regarding the consultants in Annex C.

** Provide detailed information and justification for these line items.

Including personnel seconded from the government. The Government of Botswana will second a senior staff member from the Department of Water Affairs to the Project Implementation unit and provide the same with support for office facilities, IT equipment and transportation by government vehicles.



f. Consultants working for technical assistance components:

Component

Estimated person weeks

GEF($)

Other sources ($)

Project total ($)

Local consultants*

220

40,000

400,000

440,000

International consultants*

9

27,000

0

27,000

Total

229

67,000

400,000

467,000

* Provide detailed information regarding the consultants in Annex C.

Including personnel seconded from the government. The Government of Botswana will second a senior staff member from the Department of Water Affairs to the Project Implementation unit and provide the same with support for office facilities, IT equipment and transportation by government vehicles.



G. describe the budgeted m&e plan:

    1 The Project will comply with monitoring, evaluation and reporting requirements, set by both UNDP and GEF. Quarterly progress reports will be submitted to UNDP by the executing agency, providing a brief summary of the status of activities and output delivery, explaining variances from the work plan, and presenting work plans for each successive quarter for review and endorsement. The Quarterly progress reports will also provide a basis for disbursements.

    2 The logical framework matrix, found in Annex A, provides indicators for Project implementation, along with their corresponding means of verification. These will form the basis upon which the Project's Monitoring and Evaluation system will be built and finalized during the inception phase.

    3 An Annual Project Report /Project Implementation Review (APR/PIR), including IW Results Template, will be prepared and submitted to GEF via UNDP annually, summarising and assessing work carried out in more detail, and will be reviewed by the Project Steering Committee, which shall make recommendations to the executing agency and the UNDP Country Office (UNDP CO) regarding the subsequent scheduling of Project activities.

    4 Independent end-of-project evaluations will be conducted in accord with UNDP and GEF M&E guidance to identify to what extent the project has delivered the expected outputs and outcomes within the resources allocated in a timely and effective manner.

    5 A Terminal Report will be prepared upon Project completion.

6 A tentative monitoring and evaluation plan is provided below:



Indicative M & E Work plan and corresponding Budget


Type of M&E activity

Responsible Parties

Budget US$

Excluding project team Staff time

Time frame

Inception Workshop

  • Project Coordinator

  • UNDP CO

  • UNDP GEF

7,000

Within first two months of project start up

Inception Report

  • Project Team

  • UNDP CO

500

Immediately following IW

Measurement of Means of Verification for Project Purpose Indicators

  • Project Coordinator will oversee the hiring of specific studies and institutions, and delegate responsibilities to relevant team members

10,000

Start, mid and end of project

Measurement of Means of Verification for Project Progress and Performance (measured on an annual basis)

  • Oversight by Project GEF Technical Advisor and Project Coordinator

  • Measurements by regional field officers and local IAs

20,000

Annually prior to APR/PIR and to the definition of annual work plans

APR/PIR

  • Project Team

  • UNDP-CO

  • UNDP-GEF

None

Annually

TPR and TPR report

  • Government Counterparts

  • UNDP CO

  • Project team

  • UNDP-GEF Regional Coordinating Unit

None

Every year, upon receipt of APR

Steering Committee Meetings

  • Project Coordinator

  • UNDP CO

2,500

Following Project IW and subsequently at least once a year

Periodic status reports

  • Project team

5,000

To be determined by Project team and UNDP CO

Technical reports

  • Project team

  • Hired consultants as needed

25,000

To be determined by Project Team and UNDP-CO

Mid-term External Evaluation (This may be substituted by an internal review exercise by PSC for an IW MSP project.)

  • Project team

  • UNDP- CO

  • UNDP-GEF Regional Coordinating Unit

  • External Consultants (i.e. evaluation team)

20,000

At the mid-point of project implementation.

Final External Evaluation

  • Project team,

  • UNDP-CO

  • UNDP-GEF Regional Coordinating Unit

  • External Consultants (i.e. evaluation team)

30,000

At the end of project implementation

Terminal Report

  • Project team

  • UNDP-CO

  • External Consultant

None

At least one month before the end of the project

Lessons learned

  • Project team

  • UNDP-GEF Regional Coordinating Unit (suggested formats for documenting best practices, etc)

25,000

Yearly

Audit

  • UNDP-CO

  • Project team

9,000

Yearly

Visits to field sites (UNDP staff travel costs to be charged to IA fees)

  • UNDP Country Office

  • UNDP-GEF Regional Coordinating Unit (as appropriate)

  • Government representatives

15,000 (average one visit per year)

Yearly


TOTAL indicative COST

Excluding project team staff time and UNDP staff and travel expenses


US$ 170,000




part ii: project justification


A. describe the project rationale and the expected measurable global environmental benefits:


Project Rational, Objectives, Outcomes/Outputs, and Activities


7 The World Summit on Sustainable Development Plan of Implementation calls for the development of integrated water resources management and water efficiency plans (IWRM plans) by developing countries as a way of reaching several of the Millennium Development Goals. IWRM Plans will assist countries not only in managing their limited water resources efficiently but also allow them to realize the maximum economic gains from the available resources while increasing the people’s access to clean potable water. Currently, water resources management in most countries, including those in the Southern Africa region, is generally fragmented along sectoral lines with little integration and limited stakeholder participation.


8 Although some countries have made commendable strides towards developing IWRM plans with the assistance of the Global Water Partnership (GWP), a global non-governmental organization that promotes IWRM, there is generally limited institutional capacity to develop such plans. This situation is also compounded by the absence of tried and tested methodologies for the development of national IWRM plans that could offer models for countries in the region to use in their national planning processes. Furthermore, consideration for incorporation of global environmental issues into IWRM plans, such as biodiversity, land degradation, climate variability and change, trans-boundary concerns and persistent organic pollutants, which impact water resources quality and quantity, is limited. It is against this background that the United Nations Development Programme (UNDP) is proposing to support the formulation of this Global Environment Facility (GEF) Medium-Sized Project (MSP) to assist with the development and implementation of a national IWRM plan and increase the awareness and capacity of a wide range of stakeholders in the sub-Saharan Africa region. For the development and implementation of a national IWRM plan, Botswana is selected as a demonstration site in the region.


9 Botswana’s climate is semi-arid with very low and highly variable rainfall. Because of the semi-arid climate, most of the rivers and streams are ephemeral. The only perennial rivers are the Okavango River and the Chobe River in the northern part of the country, both of which have their sources outside the country. Together with the Makgadikgadi Pans in the centre of the country they account for about 95% of the total surface water in Botswana. The majority of the population depends upon ground water which is also facing serious threats from pollution and over-exploitation.


10 The following features characterize the current situation regarding water management in Botswana:



11 The situations highlighted above have made it imperative for the country to adopt a holistic planning process for water development and planning with a view to meeting the needs of all sectors of its economy. Botswana has recently concluded a review of its National Water Master Plan (NWMP) which was initially produced in 1992. The objectives of the review were to assess and project water demands and potential sources over a thirty-year period, and to identify water resources development options that best meet the country’s economic efficiency, sustainability and poverty alleviation objectives. It has also included a review of institutional, policy and legal aspects of water resources management and effective implementation of IWRM. The review is a comprehensive effort aimed at addressing all sectoral needs.


12 The Government of Botswana (GoB) requires assistance to facilitate the development of processes, procedures, methods and options for full integration of water resources management and development options across all sectors. In particular, support is needed to identify and develop water efficiency and conservation options to respond to the problem of increasing water scarcity and the ensuing need to balance the allocation and use of water resources among different users and uses. Among other things, this will be achieved through the implementation of a pilot project aimed at putting in place water conservation measures in selected schools in Botswana. The pilot will directly result in increased awareness and capacity of the stakeholders to engage in IWRM and WE planning, while lessons learnt will be documented and disseminated across the region. (Expected Result/Achievement: All sectoral plans take into account their impact on water resources) In addition to balancing water needs, Botswana also needs assistance with incorporating specific environmental concerns such as the protection of the integrity of ecosystems and the increasing problem of groundwater pollution in water resources management, not only for the environmental purposes but also for the purpose of safeguarding the limited water resources available for potable water uses. (Expected Result/Achievement: Ecosystems management and pollution control incorporated into all water resources management plans to safeguard the limited water resources of potable water for the people of Botswana) These needs form the basis why Botswana is selected as a demonstration site for the proposed GEF/MSP project.


    13 In addition to the demonstration activities in Botswana, including the pilot on water conservation measures at selected schools, the project is designed to make significant contribution to the existing and ongoing regional efforts to develop IWRM Plans through the sharing of knowledge and lessons learned in particular on ways to ensure the global environmental benefits to be included into the IWRM and Water Efficiency planning. (Expected Result/Achievement: Botswana experiences packaged and used to influence the IWRM planning processes in the Sub-Saharan Africa region) Several countries in the Southern Africa region including Malawi, Mozambique, Namibia, Swaziland and Zambia are presently in the early stages of developing national IWRM plans, while numerous countries elsewhere in Africa are moving to develop such plans. Tested methodologies and processes for incorporating global environmental management objectives into these planning processes are lacking. The proposed Project will significantly contribute to and reinforce the existing regional knowledge management mechanisms to support exchange of experience and lessons learned, and eventually derive best practice and guidance on IWRM planning for use in other countries. Facilities such as the Southern Africa Water Information Network (SAWINET) and GWP country level water partnerships are already working to codify knowledge and best practice for regional replication in collaboration with other stakeholders such as WaterNet. This institutional architecture will be developed with support from this project and become the framework within which to distil and disseminate knowledge on accruing multiple global benefits through IWRM/ Water Efficiency Planning. The integration of global environmental objectives into such planning processes is expected to improve prospects for securing global environmental benefits in the water sector. The identification of benefits and actions needed to secure them will be critical to ensure that future investments in infrastructure balance the need to serve production interests on the one hand and broader environmental considerations.


  1. The project goal, objectives, outcomes and outputs are summarized in Table 1.


Table 1: Summary of Project Goal, Objectives, Outcomes and Outputs


Project Goal:

IWRM is operationalized across southern Africa, and contributes to environmentally, economically and socially sustainable development.


Project Objective

To facilitate national processes and development of institutional mechanisms, supported by and contributing to regional knowledge management processes, for efficient and equitable IWRM planning


Outcome 1

A dynamic IWRM Plan adopted and implemented for Botswana, which addresses national and trans-boundary water management priorities, integrate global environmental management objectives, and balances multiple uses of water resources

Outputs:

1.1 An assessment of issues and the status of water resources management (Situation Analysis Report produced)

1.2 Water resources management issues and actions identified, prioritized and strategized (IWRM Action Plan produced)

1.3 Cross-sectoral institutional coordination and stakeholder participation mechanisms for integrated water resources planning and management developed and established (Institutional audit and stakeholder participation framework developed)

1.4 A dynamic IWRM Plan prepared

Outcome 2

Increased awareness and capacity of national and regional stakeholders (government, private sector and members of the public) to engage in the IWRM (planning and implementation) process through regional knowledge management initiatives

Outputs:

2.1 Consistent and practical guidance for IWRM developed and made available (IWRM Guidelines)

2.2 Institutional changes to facilitate stakeholder participation implemented (Creation of Institutions recommended in the Water Sector Review)

2.3 Knowledge management products produced, knowledge and awareness about IWRM created, and information disseminated, at local, national and regional levels (Publications/Publicity documents, workshops, conferences held)

2.4 Bi-directional mechanisms to incorporate national and trans-boundary concerns, agreements and processes into respective water resources planning and management arrangements established (Platform for exchanges for information includes, among others, regional conferences organized and/or hosted by SADC related to the revised shared water protocol, etc.)

Outcome 3

Demonstration Project: Water conservation through conjunctive use of Grey-water Re-use and harvested rainwater in schools within Botswana: A Pilot Case for IWRM and WE Plan Implementation

Outputs:

3.1 Water conservation measures implemented and demonstrated at selected schools as part of IWRM and WE Plan in Botswana and lessons documented and disseminated across the region.

3.2 Increased awareness and capacity of national and regional stakeholders (Government, private sector and members of the public) to roll out water conservation and management programmes and actions at public/priate institutions throughout Botswana and beyond


  1. Outcome 1 of this project will demonstrate an approach to IWRM/Water Use Efficiency Planning in Botswana. The project will try to demonstrate how a government could go about preparing an IWRM/Water Use Efficiency Plan on the ground. Botswana is chosen as a demonstration country in Sub-Saharan Africa to replicate its practices and extract lessons learned in the region. The demonstration projects will include the formulation of a national IWRM plan, the establishment of institutions to implement the plan as well as to strengthen existing institutions set up to implement transboundary water resources management programmes such as OKACOM for the Okavango basin, ORASECOM for the Orange-Senqu basin and LIMCOM for the Limpopo basin. Outcome 2 of the project is targeted towards achieving regional impacts from the demonstration in Botswana. The experiences and lessons learned from activities under Outcome 1 will be documented and collated for dissemination across the region and beyond, and used to influence processes in countries which are initiating IWRM. The knowledge management efforts will be coordinated with those of existing regional and global networks, such as the Global Water Partnership. Outcome 3 of the project aims at presenting quantitative and measurable results through the implementation of a pilot-scale water conservation programmes and actions at selected schools in Botswana. Through the implementation of the pilot project, necessary capacity of various local stakeholders to implement water conservation measures is identified and strengthened. Further, the pilot project will assist stakeholders to establish a functional inter-sectoral coordination whose purpose is effectively monitor and evaluate the implementation of IRWM practices at a pilot scale. By capacitating and creating awareness about IWRM and WE amongst the stakeholders, the pilot project will inform and contribute to the attainment of Outcome 1, while at the same time the documentation of lessons learnt and knowledge sharing will support and contribute directly to Outcome 2.


    1. The three Project components are interlinked and mutually supportive. The specific activities under each component output will be further defined during the Project Inception Phase.


    1. Outcome 1 comprises support to the national IWRM planning process in Botswana. The outputs of this component are the actual IWRM plan, including the information on which it is based; and the institutional mechanisms necessary for producing, monitoring and updating the plan. The word ‘dynamic’ is a key word in this context, implying that the outcome should be the facilities and capacity for an iterative and strategic planning process, rather than the production of a static plan. All relevant stakeholders, including water users and civil society in addition to government agencies, will be involved in this process, which will be supported by financial and human resources from GoB, UNDP-GEF and the Country Water Partnership in Botswana.


    1. Outcome 2 encompasses the Project’s regional knowledge management component, which entails the creation and dissemination of knowledge, awareness raising, institutional changes in order to enhance meaningful stakeholder participation, and creation of mechanisms for addressing both national and regional concerns at appropriate levels. Notably, mechanisms will be put in place to promote incorporation of governance of shared water courses into the national IWRM planning processes. The creation and dissemination of knowledge will be bi-directional. The planning activities in Botswana will be supported by knowledge inputs generated and available regionally and will incorporate trans-boundary concerns into the national plan, while the lessons learned from experiences in Botswana will inform regional stakeholders via existing knowledge network. The regional knowledge management initiatives, such as the annual partners’ workshops organized GWP-SA, will be used to advance this component of the project. With regard to its actual content, the knowledge management component should focus on the production and dissemination of concrete knowledge management products that are useful in moving IWRM from an academic and intellectual level to practical implementation. Examples of such products are tool kits and guidance materials that can be used by IWRM practitioners in the region. Although the component will be managed by the Project Management Unit (PMU) located in Botswana, it will of necessity link up with and use the resources and capacity of existing regional networks and capacity building institutions such as WaterNet, GWP-SA and IWSD for the specific activities. It will also link up with Cap-Net, which recently relocated its headquarters in the region (Pretoria, South Africa), in order to benefit from the IWRM practitioners’ global network.


    1. Outcome 3 is represented by the implementation of the pilot project “Water conservation through conjunctive Use of Grey-water Re-use and harvested rainwater in schools within Botswana: A Case for IWRM and WE Plan Implementation”. It is expected that the results from this pilot project will contribute directly to the overall IWRM project through the practical on-the-ground implementation of IWRM and the enhancement of the capacities of the schools in Botswana involved in the process. The project is expected to influence water conservation awareness and will also have an impact on water allocation and pricing processes in the future thereby promoting the sustainable utilization of this scarce resource. The lessons learnt from the implementation of the pilot project will be packaged and disseminated to a wider audience in Botswana as well as the southern Africa region and beyond.


Replicability


    1. The Outcome 2 and Outcome 3 of the project are targeted to ensure project replicability by delivering on-the-ground experience with the implementation of IWRM and fostering knowledge transfer. Practical guidance on IWRM implementation and knowledge management products will be produced based on the experiences and lessons learned from the demonstration activities in Botswana to integrate global environmental concerns into a national IWRM planning process. The distilled information on “how to” accrue multiple global environmental benefits through IWRM/WE Planning will be widely disseminated in the sub-Saharan Africa region as well as globally through existing and well established knowledge networks. In addition to a web-based knowledge transfer and newsletters, the existing knowledge networks and capacity building institutions that promote IWRM, such as GWP-SA and WaterNet, offer workshops, training courses and training of trainers, where practitioners and decision makers from the regions come together and exchange information in person. The knowledge management products produced by the project will be disseminated using those networks.


Sustainability

    1. The sustainability of IWRM planning in Botswana is predicated upon recent developments in the sector. The broadening of the stakeholder base in IWRM planning that has been heralded by the NWMP review process will facilitate the participation of a larger number of stakeholder groups and relevant institutions. The inclusion of community groups in the process will enhance their participation in and contribution to decision making. This will improve sustainability as the processes will be operationalized also at local level. It is expected that the PMU will become an integral part of the water resources management framework in Botswana in the future, thereby supporting sustainability of Project activities and outputs.


    1. The financial sustainability is ensured largely by the significant level of co-financing commitment by the Government of Botswana for both IWRM Planning and water efficiency projects, including demand management projects. Department of Water Affairs has committed itself to supporting the project management structure, housed at the Kalahari Conservation Society, through the allocation of resources for IWRM planning in their budget for 2006. The Government of Botswana has committed more than US$ 1million to IWRM related water resources management programmes over the next fifteen years as indicated in the National Water Masterplan Review. This level of commitment is more than most countries in the region have committed to this sector without outside assistance. Furthermore, the Government has proposed to allocate additional USD9.7 million for water efficiency and water demand management projects in its 10th National Development Plan, the next Government programming cycle starting in April 2009. Additionally, financial sustainability will also be promoted by the commitment of financial resources made by the Global Water Partnership to regional knowledge management activities during and beyond the project implementation.



  1. Describe the consistency of the project with national priorities/plans:



    1. The proposed Project is consistent with the national vision, national development planning processes and policies, and strategies for development planning and water resources management of Botswana. Principal among these are the National Vision 2016 and the National Development Plan 9, which articulate the country’s priorities regarding water resources management, and the new Environment Act with associated regulations for environmental assessment.


    1. The recently concluded review of the National Water Master Plan, which governs the development of water resources in Botswana, places emphasis on integrating additional aspects of natural resource management such as biodiversity, conservation and institutional strengthening which thus addresses the focal areas of the GEF. The review was expected to produce “a revised institutional framework for the water sector in Botswana, which can respond and adequately deliver Vision 2016 goals and aspirations on water.” Government commitment to both policy and legislative review to provide for greater community participation in water resources management creates an enabling environment for IWRM.


    1. This revision of the NWMP lays a strong foundation for the introduction of integrated approaches to water resources management. Traditional sectoral approaches will be replaced by these new approaches, including the participation of a broader spectrum of stakeholders. The proposed establishment of a Water Resources Council will improve the involvement of community groups and civil society in water resources management decision making processes.


    1. Botswana already has a structure in place for implementing IWRM in that a functional Country Water Partnership is leading the process of developing the country’s IWRM planning process. However, despite these institutional developments, Botswana still needs support for strengthening IWRM institutional capacity, to improve identification and development of water efficiency and conservation options to respond to problems of water scarcity, and for balancing of water allocation and use.


    1. Another priority intervention that is of relevance to this project is the work of the International Waters Unit of Ministry of Minerals, Energy and Water Resources (MMEWR) through which the country cooperates with its neighbours in the management of shared water resources. This work will provide a vehicle for the dissemination of information and best practices in IWRM, thereby contributing to knowledge management across the region.


    1. In the regional context, the southern Africa region has developed a regional water policy, protocol and strategy, all of which provide an overall framework for national water resources development. The regional water policy provides the context and intent of water resources management, while the Protocol on Shared Watercourses is the legal instrument for the implementation of the policy and strategy. The strategy on the other hand charts the road map for implementation of both the policy and strategy through prioritizing and promoting sustainable, integrated and coordinated development, as well as use and protection of the region’s water resources. This is done through the Regional Strategic Action Plan developed by SADC. National level policies are harmonized to conform to these regional instruments and thus contribute to trans-boundary water resources management.





  1. Describe the consistency of the project with gef strategies and strategic programs:


    1. The proposed project fits with the first Strategic Objective for International Waters: to foster international, multi-state cooperation on priority transboundary water concerns through more comprehensive, ecosystem-based approaches to management, and conforms squarely to one of four priorities set for GEF4, namely, addressing overuse and conflicting uses of water resources in transboundary surface and groundwater basins (Strategic Program III). It seeks to balance these water uses with competing environmental demands, within a situation characterized by high vulnerability to climate change. Use of Integrated Water Resources Management (IWRM) has been identified as the answer to balancing competing and conflicting uses of water resources to inform tradeoffs being made in socio-economic development and ecosystem protection, and targets related to IWRM were adopted at the Johannesburg Summit. This project constitutes innovative demonstrations to build an enabling environment for IWRM and to test innovative approaches for introducing IWRM, accruing possible multiple global benefits through the IWRM planning, as well as to protect/enhance groundwater supplies. In particular, the project will address the following aspects of the Strategic Program:










  1. Outline the Coordination with other related initiatives:



Linkages to the UNDAF and UNDP Country Programme










Linkages with other GEF Financed Projects






Linkages with Regional Projects









  1. Describe the incremental reasoning of the project:









Table 5 Matrix of Causes and Impacts


Direct Cause of Water Shortages

Overall Impacts

Root Causes

Potential Response Measures

Variability of Rainfall:

This is the most important direct cause of water shortages in Botswana.


Unsustainable Use and poor management of water resources:

High evaporation rates

Pollution of water sources

Limited data for assessment and monitoring of water resources


Limited suitable sites for surface water development


  • Ground water resources being depleted due to unsustainable abstraction and use

  • Increased competition for the resource

  • Uncoordinated water resources management practices













G


O


V


E


R


N


A


N


C


E

Centralized water resources planning processes and lack of inter-sectoral coordination

  • Water resources development and planning is the exclusive responsibility of government.

  • Sectoral approach to water resources planning

  • Lack of consideration of important cross-cutting and environmental concerns

  • Support participatory planning processes

  • Introduce IWRM planning systems, including facilities for consideration of cross-cutting and environmental concerns

  • Support implementation of NWMP recommendations, e.g. assist in the establishment of the Water Resources Council

No provision for community participation in water resources decision making

  • Communities not fully involved in planning process for water resources management

  • Over dominance of some interest groups in water allocation decision-making

  • Weak water resources planning institutions

  • Support programmes that improve community participation

  • Support improvement of water governance

  • Support institutional strengthening for IWRM

  • Implementation.

  • Support inclusion of trans-boundary considerations into water resources planning processes.

Shortage of financial resources and skilled personnel (planners with experience in IWRM)

  • Sectoral approach to water resources management perpetuated

  • Focus is on conventional approaches to water resources planning


  • Provide technical assistance for IWRM planning

  • Provide financial resources for IWRM planning

  • Provide assistance with best practices in managing issues of evaporation

  • Support improvement of data management on water resources

Inadequate information systems and knowledge management

  • Information on integrated water resources planning not packaged and disseminated

  • IWRM concept not understood


  • Support knowledge management at national and regional level for development of IWRM planning processes

  • Support development of a Monitoring and Evaluation system for IWRM.

No models for IWRM in Botswana and the region

  • No examples of IWRM planning to learn from

  • Provide examples from other parts of the world

  • Package Botswana experience for use in regional knowledge management

  • Provide resources (human and financial) for IWRM planning

  • Assist with incorporation of global environmental considerations into IWRM (GEF focus areas).



Baseline Analysis







GEF Alternative







Innovation







F. Indicate risks, including climate change risks, that might prevent the project objective(s) from being achieved and outline risk management measures:






Table 4: Project Risks

Risk

Rating of Risk

Risk Mitigation Measure

Goal Level Risks

1. Government does not support programmes that lead to achievement of MDGs

Low risk given GoB's social development focus.

Continued engagement of government planning system to target MDGs.

2. Lack of support to IWRM principles from important sectors of Botswana’s economy.

Low risk given mobilization by CWP and concern about sustainable development in the country.

Increased stakeholder involvement in planning processes, and intensive dissemination of information.

Arrangement of high-level political buy-in process to increase the understanding of IWRM so as to ensure support at all times.

3. Insufficient commitment to regional cooperation

Low risk given present commitment of countries in the region to SADC and other regional cooperation forums.

Continued successful regional cooperation leading to benefits for the countries in the region.

Risks at Objective Level

1. Regional Cooperation in resource management does not continue resulting in conflict.

Medium risk as resource scarcity increases.

Promotion of regional agreements and protocols. Improved information dissemination and knowledge management.

Risks at Outcome Level

Outcome 1



1. Lack of cross-sectoral planning including water resources planning.

Medium risk of continued sectoral planning if institutional mandates are not consolidated.

Introduction of IWRM planning to help with integrated planning across sectors, supported by NWMP recommendation.

2. Lack of capacity for IWRM implementation.

Medium risk.

Provision of technical assistance through regional and international linkages.

Outcome 2



1. Reduced cooperation among countries in managing shared resources.

Medium risk as countries might focus on meeting own needs

Use SADC Protocols to engage countries on commitments made to regional cooperation.

2. Information not shared among users and other stakeholders within the region.

Medium risk if current lack of awareness is not addressed.

Information dissemination promoted at national and regional level. Stakeholder participation in water resources planning promoted.

Outcome 3



1. Lack of awareness amongst local stakeholders

Medium risk

Continued engagement with all the stakeholders and ensuring broad participation

2. Lack of capacity for cross-sectoral cooperation and IWRM implementation.

Medium risk.

Provision of technical assistance through regional and international linkages.










G. explain how cost-effectiveness is reflected in the project design:





part iii: institutional coordination and support

A. Project Implementation Arrangement:





Project Steering Committee







Project Management Unit




Inputs


part iv: explain the alignment of project design with the original PIF: N/A


part v: Agency(ies) certification

This request has been prepared in accordance with GEF policies and procedures and meets the GEF criteria for CEO Endorsement.

Yannick Glemarec

Executive Coordinator

UNDP/GEF

Project Contact Person:

Akiko Yamamoto

Regional Portfolio Manager for International Waters

UNDP Regional Coordinating Unit, Pretoria

Date: 30 July 2008

Tel. and Email: +27 12 354 8125

akiko.yamamoto@undp.org


Annex A: Project Results Framework


Project Title

Accruing Multiple global benefits through Integrated Water Resource Management/Water Use Efficiency Planning: A demonstration project for sub-Saharan Africa

Goal
IWRM is operationalized across Southern Africa, and contributes to environmentally, economically and socially sustainable development
Objective

To facilitate national processes and development of institutional mechanisms, supported by and informing a regional knowledge management process, for efficient and equitable IWRM planning

Outcomes

  1. A dynamic IWRM Plan adopted and implemented for Botswana, which addresses national and trans-boundary water management priorities, integrate global environmental management objectives, and balances multiple uses of water resources

  2. Increased awareness and capacity of stakeholders (government, private sector and members of the public) to engage in the IWRM (planning and implementation) process through regional knowledge management initiatives

  3. Pilot Project: Water conservation through conjunctive Use of Grey-water Re-use and Harvested Rainwater in schools in Botswana

Outcome 1: A dynamic IWRM Plan adopted and implemented for Botswana, which addresses national and trans-boundary water management priorities, integrate global environmental management objectives, and balances multiple uses of water resources

Outputs

Inputs and Actors

Verifiable indicators

Means of verification

Assumptions

For Outcome 1:

Plan formally adopted by GoB

Plan effectively implemented through institutional mechanisms created

Trans-boundary priorities addressed

Global environmental objectives integrated and pursued

Multiple uses of water balanced

Assessment reports

IWRM plan

Trans-boundary management strategy and programme documents Documentation of cross-sectoral, participatory consultation and coordination processes

Records and outputs of inter-ministerial coordination mechanism

Planning documents and monitoring reports

Recommendations of NWMP Review are implemented

1.1 An assessment of issues and the status of water resources management

  • PMU

  • Financial and human resource inputs from GoB, UNDP-GEF and CWP

  • Stakeholders at all levels, including water users and civil society

  • Consultants

Workshops performed

Assessment report(s) published


Workshop proceedings

Assessment report(s)

Current GoB focus on IWRM is maintained

1.2 Water resources management issues and actions identified, prioritized and strategized

Workshops performed

Appropriate reports published that specifies agreed actions, priorities and strategies

Workshop proceedings

Reports

Multiple stakeholder participation in workshops maintained

1.3 National level institutions for IWRM established and cross-sectoral institutional coordination and stakeholder participation mechanisms for integrated water resources planning and transboundary water resources management developed and established

National institutions for IWRM established and coordination and stakeholder participation mechanisms in place

DWA Progress Reports

Monitoring reports

Water Resources Council established to coordinate IWRM Planning

1.4 A dynamic IWRM Plan prepared

IWRM plan published and processes for its up-dating in place

Plan document

DWA Progress Reports

GoB capacity enhanced to facilitate plan formulation

Outcome 2: Increased awareness and capacity of national and regional stakeholders (government, private sector and members of the public) to engage in the IWRM (planning and implementation) process through regional knowledge management initiatives

Outputs

Inputs and Actors

Verifiable indicators

Means of verification

Assumptions

For Outcome 2:

Knowledge management platforms in place and informing national and regional IWRM planning processes

Guidance material accessed by IWRM practitioners

Proceedings of dialogue and networking events

Requests for information

Project monitoring reports

GWP/CWP progress reports and documentation. Documentation from regional networks and Cap-Net

IWRM planning guidance material

Documentation of planning processes

Public outreach and participation plans

Effective linkages between national and regional knowledge management networks created and functional

2.1 Consistent and practical guidance for IWRM developed and made available

  • PMU

  • Financial and human resource inputs from GoB, UNDP-GEF and CWP

  • Institutional and human resource inputs from regional institutions such as GWP-SA, IWSD, WaterNet and SAWINET

  • Consultants

Guidelines and information material for IWRM published

Review of guidelines and information material

Progress and monitoring reports

PMU established and working with GoB

2.2 Institutional changes to facilitate stakeholder participation implemented

Extent and importance of institutional changes made

Progress and monitoring reports

WRC established and functional

2.3 Knowledge and awareness about IWRM created, and information disseminated, at national and regional level

Number of training events and persons trained

Number and quality of awareness and information programmes and materials produced

Course reports

Materials review

Progress and monitoring reports

IWRM Information networks fully functional at national and regional levels

2.4 Bi-directional mechanisms to incorporate national and trans-boundary concerns, agreements and processes into respective water resources planning and management arrangements established

Mechanisms visible in national and trans-boundary plans and arrangements

Progress and monitoring reports

National and trans-boundary plan documents and agreements

National water resources planning processes recognize the need to incorporate regional concerns.

Outcome 3: Pilot Project: Water conservation through conjunctive Use of Greywater Re-use and Harvested Rainwater in schools in Botswana

Outputs

Inputs and Actors

Verifiable indicators


Means of verification


Assumptions



Please refer to the detailed Logframe for this Demonstration project below




Pilot Project Logframe


Pilot Project Title

Water conservation through conjunctive Use of Grey-water Re-use and harvested rainwater in schools within Botswana: A Case for IWRM and WE Plan Implementation

Goal
IWRM and WE Plan is made operational in Botswana and contributes to environmentally, economically and socially sustainable development
Objective

To facilitate the development of national processes and institutional mechanisms for IWRM and Water Efficiency planning that will inform and support a regional knowledge management process,

Outcomes

  1. Water conservation measures implemented and demonstrated at selected schools as part of the IWRM and WE Plan in Botswana and lessons documented and disseminated across the region.

  2. Increased awareness and capacity of stakeholders (government, private sector and members of the public) to roll out water conservation and management programmes and actions at public/private institutions through out Botswana and beyond.


Outcome 1: Water conservation measures implemented and demonstrated at selected schools as part of the IWRM and WE Plan in Botswana and lessons documented and disseminated across the region.



Outputs

Inputs and Actors

Verifiable indicators

Means of verification

Assumptions

Pilot project adopted as a national initiative.

Project institutionalized and used as basis for setting water allocation and pricing processes.


Progress reports.

Documentation of cross-sectoral, participatory consultation and coordination processes

Records and outputs of inter-ministerial coordination meetings.

National planning documents and monitoring reports


Recommendations of NWMP Review are implemented

1.1 Schools participating in the pilot identified through stakeholder consultation

  • PIU

  • Financial and human resource inputs from schools and other institutions in Botswana

  • GWP/CWP

  • Stakeholders at all levels, including water users and civil society

  • Consultants

Number of schools participating in the pilot water conservation project


Inception Report


Current GoB focus on IWRM is maintained


Commitment and interests from schools in the water conservation practices

1.2 An assessment of capacities of schools for water resources conservation and management conducted, including the identification of 1) technical capacity needs, 2) infrastructure needs and 3) m3/month that can be potentially saved through water conservation measures at each participating school.

Assessment report(s) published that specifies the capacity and infrastructure needs as well as the amount of water that could be potentially saved through various water conservation measures at each participating school.


Assessment report(s)

1.3 Water resources conservation and management programmes and actions identified, costed, prioritized and strategized at each school and the corresponding M&E framework developed.

Technical Reports summarizing the agreed water resource conservation and management programmes and actions with priorities published.


A concrete action plan with financial information and timeline for each participating school.


M&E framework with indicators that will measure actual on the ground changes through the pilot project (e.g., # of participating schools, # of participating students, amount of water saved per school, per capita, etc.)

Technical Reports





An action plan for each participating school



M&E framework

Multiple stakeholder participation in workshops maintained


Reasonably costed, readily implementable water conservation measures available.


Indicators that can be monitored with non-significant additional financial and human resource inputs available. (e.g., water consumption at school measured periodically.)

1.4 Water conservation and management programmes and actions implemented at each school to realize # m3/month saving of water by the end of year 3. (The appropriate quantitative conservation target for each school will be determined through 3.1.2 and 3.1.3.)

Prioritized water conservation measures (e.g., water conservation and rain harvesting system) designed, adopted and put into practice.


Number of sites where the WE measures have been installed

Field visits

1.5 Cross-sectoral coordination (e.g. between DWA and schools) and stakeholder participation mechanisms established to monitor and evaluate the pilot project implementation at schools

Appropriate coordination committees established and functional

CWP and DWA Progress Reports

Monitoring reports

Committee meeting minutes

National level IWRM institutions established

Outcome 2: Increased awareness and capacity of national and regional stakeholders (Government ministries of Local Government, Education, private sector and members of the public) to roll out water conservation and management programmes and actions at public/private institutions throughout Botswana and beyond






Outputs

Inputs and Actors

Verifiable indicators

Means of verification

Assumptions

IWRM implementation guidelines and material accessed by IWRM practitioners

Project implementation reports by the various institutions

Project monitoring reports

GWP/CWP progress reports and documentation.

National institutions collaborate in implementation of IWRM and water efficiency programme

2.1 Practical (step-by-step) guidelines for formulation and implementation of the water conservation programme and actions at a school/institution institution developed and made available to wider national audience

  • PIU

  • Financial and human resource inputs from various GoB institutions, and the CWP

  • Consultants

Guidelines and information material published

Publications

Progress and monitoring reports

Water conservation programme and actions successfully formulated at selected schools

2.2 Institutional capacities for adoption of IWRM enhanced.

Training programme developed

Training Programme

Progress and monitoring reports

Effective conservation measures identified at selected schools

2.3 Lessons learned on the cross-sectoral coordination and stakeholder participation for the effective M&E for water conservation and management programme and actions extracted and disseminated widely throughout Botswana and beyond.

Lessons learned produced

Lessons learned disseminated using at least 3 national/regional fora

Lessons learned publication

Progress and monitoring reports

The cross-sectoral coordination committee established and functional.

Annex B: Responses to Project Reviews (from GEF Secretariat and GEF Agencies, and Responses to Comments from Council at work program inclusion and the Convention Secretariat and STAP at PIF)


Convention Secretariat comments and IA/ExA response

N/A


STAP expert review and IA/ExA response (if required)

N/A


GEF Secretariat and other Agencies’ comments and IA/ExA response


GEFSEC comments on the MSP Project Document submitted on 23 March 2007


GEFSEC Comments

Responses

1.

The Project Goal, Objective and Outcomes are included in the end of the project document (pp. 23). I would believe that the project document would be easier to read and understand if these were moved forward in the document. Maybe one should consider to cut a little of the initial 20 pages of background information out or place it in an appendix.


The Project Goal, Objective and Outcomes are summarized in Table 1 (para 14.) of this document.


The project rational, including the project goal, objective and outcomes, is summarized in Part II Section A (para. 7 to 19).

2.

Concerning the budget, the suggested amount of 250.000 US$ for project management services, equivalent to 25 % of the total MSP amount is too high, a figure around 75.000-100.000 US$ do seem more appropriate (7.5 % to 10%).

The budget for the project management services to be reduced to USD94,000.

3.

The amount budgeted for under output 2.3 - 325.000 US$ does cover close to

1/3 of the entire budget, Maybe a breakdown of the different components under this specific output could be a good way to illustrate what the funds are being proposed to be used for. I realize that this component is crucial to the success and impact of the IWRM for Botswana as well as for the possibility of having the riparian countries formulate their own IWRM plans, but using 1/3 of the budget is probably putting a little too much emphasis on this component.

The project budget has been significantly modified after a pilot project (Outcome 3) has been added to response to the request from GEFSEC that a pilot be added. In the revised budget, as shown in Table A, more than 1/3 of the total project budget is allocated for the implementation of the pilot project and the revised allocation for the Output 2.3 has been reduced to USD200,000. The breakdown of the budget allocated to Output 2.3 is shown in a table below.


The revised budget allocation for Output 2.3 remains significant (1/5 of the total project budget). This emphasis on regional knowledge management reflects the fact that IWRM implementation in Botswana supported by this project is a demonstration case for the region. Without this regional component, ensuring the project cost effectiveness and justifying the GEF funding would be difficult. Knowledge generation and dissemination across the region will promote IWRM awareness and planning at a regional scale. National level initiatives would not be able to cover this aspect, hence the allocation of a sizeable portion of GE resources to this important output. GWP-SA will work with UNDP CO to manage this component.

4.

Please be aware of the fact that for MSPs there is a new template that needs to be used. The template features a more detailed overview of the budget for Project management services, among others.

UNDP Project Document is no longer required to be submitted to GEFSEC for MSPs for CEO approval. Therefore, all the necessary information is included in this CEO approval request template. Furthermore, additional detailed budget information is provided in Annex E.

5.

The Replication strategy envisioned in the Document mostly describes the activities already undertaken to facilitate replication of the IWRM plan in Botswana. Maybe one should consider strengthening the actual replication plan/strategy for the Botswana IWRM project. It is not really clear as it is in the written document….


The replicability section is revised to clearly state the project’s replication strategy and added under the Part II Section A (para 20) of this document.

6.

Future GEF projects, in all focal areas, include a paragraph assessing how project activities, outputs and objectives will be influenced by the anticipated effects of climate change. (from the recent communication from GEFSEC to GEF Agencies, dated 14 Feb 2007)


A paragraph is added (para. 61) under risk section regarding the potential risks imposed by the anticipated effects of climate change with proposed mitigation measures.

7

The project document mentions “National Demonstration Activities” e.g. on page 7, it may strengthen the document if the document actually explained what kind of demonstration activities that will be undertaken. Further, these demonstration activities should also be reflected upon in the project Logframe, with verifiable indicators, as the other activities in the proposed project.

The project was initially designed so that the Outcome 1 of this project, the development of the IWRM Plan in Botswana as a whole is the demonstration to test how a government in the Sub-Saharan Africa region could go about preparing an IWRM Plan. This approach remains still valid.


In addition, upon request from GEFSEC to include “on-the-ground” demonstration activities to implement the IWRM plan as part of the project activities, a pilot project has been developed and added as Outcome 3. The project budget as well as co-financing contribution have been revised to incorporate this change. The logframe for the pilot project is included in Annex A.


8

The financial sustainability of the project is foreseen to be carried out with the help of financial resources from the Global Water Partnership (pp34). The government contribution to the project might prove to be more important to the long term sustainability of the project. The project proposal should reflect this under the section on (financial) Sustainability.

Indeed, the government contribution to the project in both technical and financial terms is most critical for the long-term sustainability of the project. The sustainability section has been revised to more accurately describe the government (technical) contribution to IWRM through the National Water Masterplan Review as well as its significant financial commitments to the IWRM and water efficiency projects. The description is found in Part II Section A (para. 21&22).


Breakdown of the budget allocated to the Output 2.3.

Items

GEF funds (USD)

Production of knowledge management products for targeted audience including:*

  • Briefs for SADC Conference of Ministers

  • Best practice notes per sector

  • Advocacy notes for policy makers

  • Advocacy notes for Commissioners of the transboundary river commissions

  • Advocacy notes for communities

  • User Guide for different sectors

150,000

Set up and maintenance of a moderated project website

50,000

Dissemination of the knowledge management project**

50,000

Subtotal for the Output 2.3

200,000

Annex c: consultants to be hired for the project



Position Titles

$/

person week*

Estimated person weeks


Tasks to be performed

For Project Management




Local




Audit firm

$3,000

9

Annual External Audit

Independent evaluator

$3,000

5

Terminal Evaluation

Administrative Assistant

$1,000

29

General project administration, including financial reporting, etc.,

Project Coordinator

$1,800

10

Approximately 7% of PC’s time spent for the project administration, including progress and financial reporting, etc.

For Technical Assistance




Local




Local Consultant

$ 2,000

20

Conduct scoping studies for IWRM-related sectors such as biodiversity and climate change and make appropriate recommendation for incorporation in the national IWRM process. Facilitate national workshops and prepare knowledge management products. Support in the capacity building activities of all the stakeholders.

International




International Consultant

$ 3,000

9

Support to the development of the National IWRM making sure global environmental concerns are duly incorporated. Assist in the implementation of the Pilot Porject. Provide technical support in producing knowledge management products for regional dissemination.

*Estimated costs for international consultants include travels and other incidental costs




Consultant Rate applied by UNDP Botswana


Consultant's level

Complexity; Degree of Expertise; Availability

Candidate's Equivalent level, Qualifications and Experience

RANGE OF DAILY RATE IN US$

A

Junior Specialist

ICSC-8 to ICSC-9

P/L-1 to P/L-2

150-250

B

Specialist

ICSC-10 to ICSC-12

P/L-3 to P/L-5

250-400

C

Senior Specialist

ICSC-13 to ICSC-15

D-1/L-6 to ASG

400-600



Annex d: status of implementation of project preparation activities and the use of funds

explain if the ppg objective has been achieved through the ppg activities undertaken. The main Objective of the PDF-A was: “To prepare a Medium-size Project Document for funding by GEF and other cooperating partners, in addition to setting up preliminary frameworks for institutional strengthening and capacity building to facilitate a smooth transition to implementation of the Medium-size project”. All stages have been completed and the Objective has been achieved. A Project Document on “Accruing Multiple Global Benefits through Integrated Water Resource Management/Efficiency Planning: A Demonstration Project for Sub-Saharan Africa” has been prepared and is being submitted to the GEF Work Programme. Co-financing letters have been obtained from Government of Botswana and Global Water Partnership (Southern Africa).

  1. describe if any findings that might affect the project design or any concerns on project implementation. n/a


  1. provide detailed funding amount of the ppg activities and their implemtation status in the table below:


Project Preparation Activities Approved


Implementation Status

GEF Amount ($)


Co-financing

($)

Amount Approved

Amount Spent To-date

Amount Committed

Uncommitted Amount*

Prepare a framework for GEF support**

Completed

25,000

25,000

     

     

60,000

Total


25,000

25,000

     

     

60,000

* Uncommitted amount should be returned to the GEF Trust Fund. Please indicate expected date of refund transaction to Trustee.


** The following stages were identified and carried out successfully to complete the preparatory phase:

Stage 1 “Set up administration and implementation mechanisms”

Stage 2 “Analyses and preparation of Project Document”

Stage 3: “Donor Consultations on Project Document”

Stage 4: “Fine-tuning and detailing project proposal and submit to GEF”


Annex E: GEF Total Budget and Work Plan


Award ID:

00045537

Award Title:

PIMS 3362 IW MSP: Integrated Water Resources Management

Business Unit:

BWA10

Project Title:

Accruing multiple global benefits through Integrated Water Resources Management/Water Use Efficiency Planning: A demonstration project for sub-Saharan Africa (Botswana)

Implementing Partner (Executing Agency)

Government of Botswana (Ministry of Minerals, Energy and Water Resources – MMEWR)


GEF Outcome/Atlas Activity

Responsible Party/

Fund ID

Donor Name

Atlas Budgetary Account Code

ATLAS Budget Description

Amount Year 1 (USD)

Amount Year 2 (USD)

Amount Year 3 (USD)

Total (USD)

See Budget Note:

Impl. Agent

OUTCOME 1: A dynamic IWRM Plan adopted and implemented for Botswana, which addresses national and trans-boundary water management priorities, integrate global environmental management objectives, and balances multiple uses of water resources

MMEWR

62000

GEF

71200

International Consultants

9,000

9,000

9,000

27,000

1

71300

Local Consultants

5,000

5,000

5,000

15,000

2

72100

Contractual Services – companies

40,000

40,000

40,000

120,000

3

71400

Contractual Services – Individuals

16,000

16,000

16,000

48,000

4

71600

Travel

3,000

3,000

3,000

9,000

5

74500

Miscellaneous

1,000

1,000

1,000

3,000

 

 

 

 

 

Total Outcome 1

 

 

 

222,000

 

OUTCOME 2: Increased awareness and capacity of national and regional stakeholders (government, private sector and members of the public) to engage in the IWRM (planning and implementation) process

MMEWR

62000

GEF

71200

International Consultants

6,000

7,000

7,000

20,000

6

71300

Local Consultants

5,000

5,000

5,000

15,000

7

72100

Contractual services – companies

45,000

45,000

45,000

135,000

8

71400

Contractual Services – Individuals

22,000

22,000

22,000

66,000

9

74200

Audio Visual & Print Prod Cost

10,000

20,000

19,000

49,000

10

71600

Travel

5,000

8,000

8,000

21,000

11

74500

Miscellaneous

1,000

1,000

1,000

3,000

 

 

 

 

 

Total Outcome 2

 

 

 

309,000

 

OUTCOME 3: Implementation of IWRM and WE Pilot

MMEWR

 

 

 

62000

 

 

 

GEF

 

 

 

71200

International Consultants

6,000

6,000

6,000

18,000

12

71300

Local Consultants

4,000

4,000

4,000

12,000

13

71600

Travel

7,000

7,000

7,000

21,000

14 

72100

Contractual services – companies

48,000

48,000

48,000

144,000

15

71400

Contractual services – individuals

20,000

20,000

20,000

60,000

16

72300

Materials and Goods

20,000

20,000

20,000

60,000

17 

74200

Audio Visual & Print Prod Cost

10,000

10,000

10,000

30,000

18 

74500

Miscellaneous

1,000

2,000

2,000

5,000

 

 

 

 

 

Total Outcome 3

 

 

 

350,000

 

PROJECT MANAGEMENT

MMEWR

62000

GEF

71300

Local Consultants

0

0

15,000

15,000

19

71400

Contractual services – individuals

15,000

16,000

16,000

47,000

20

74100

Professional Services

9,000

9,000

9,000

27,000

21

74500

Miscellaneous

1,000

2,000

2,000

5,000

 

 

 

 

 

Total Management

 

 

 

94,000

 

 

 

 

 

PROJECT TOTAL

 

 

 

975,000

 




Budget notes:


  1. To minimize the transaction cost and maximize the cost effectiveness of the interventions provided by an international consultant in order to attain the project objective, one international consultant will be hired to provide technical support throughout the project lifetime. The international consultant will be selected on competitive basis and will make contribution towards achieving all the three outcomes. Details of the expected inputs provided by the international consultant are shown in the TORs for International Consultant, included in the Annex G. The international consultant will work closely with a national consultant and a locally based organization which will enter into the partnership with the Government of Botswana to implement project activities. Budget for an international consultant includes international consultant travel (two trips per year) to travel to Gaborone in order to ensure the effective coordination with the national consultant as well as the quality control of the outputs for the all the three outcomes, but does not include in-country travels to attend key workshops when it is held outside of Gaborone. Each trip to Botswana will be strategically scheduled so that the international consultant will be able to attend key workshops held in Botswana and be able to contribute to all the Outcomes while he/she is Botswana. It is estimated that approximately 40 % of the international consultant time will be spent towards achieving Outcome 1.


  1. To minimize the transaction cost and maximize the cost effectiveness of the interventions provided by a national consultant in order to attain the project objective, one national consultant will be hired to provide technical support throughout the project lifetime. The national consultant will be selected on competitive basis and will make contribution towards achieving all the three outcomes. Details of the expected inputs provided by the national consultant are shown in the TORs for National Consultant, included in the Annex G. The national consultant will work closely with an international consultant and a locally based organization which will enter into the partnership with the Government of Botswana to implement project activities. Budget for a national consultant does not include in-country travels to attend key workshops held in Botswana or regional travels required to ensure the regional component (Outcome 2) of the project. It is estimated that approximately 35 % of the national consultant time will be spent towards achieving Outcome 1.


  1. A locally based organization will enter into the cooperation agreement with Government of Botswana to share the responsibility of project activity implementation throughout the project lifetime. An organization will be selected according to its technical and administrative capacities and will conduct or lead bulk of the project activities. For Outcome 1, activities include conducting two national workshops: Expected key outputs from the workshops include: a) findings and recommendations of scoping exercise validated, b) recommendations on how to incorporate scoping study findings into IWRM Plans, c) a roadmap towards national IWRM plans defined, and d) a stakeholder participation strategy for Botswana defined. It is estimated approximately 30% of the organization’s contribution will be allocated to attain Outcome 1.


  1. Approximately 22% of the staff time of the Project Management Unit, i.e., Project Coordinator and Administrative Assistant, will be spent towards achieving Outcome 1. The TORs for the PMU staff are found in the Annex G.


  1. Travel budget is allocated for the national consultant, and Project Manager when necessary, to travel in-country to consult with stakeholders.


  1. See the Budget Note 1 above. It is estimated that approximately 30 % of the international consultant time will be spent towards achieving Outcome 2.


  1. See the Budget Note 2 above. It is estimated that approximately 35 % of the national consultant time will be spent towards achieving Outcome 2.


  1. See the Budget Note 3 above. For Outcome 2, GWP-SA (working with the Kalahari Conservation Society, the host organization for the Botswana Country Water Partnership) will be contracted to implement this component through the use of its network of partnerships in the region. GWP-SA will produce the IWRM Guidelines, conduct institutional and stakeholder participation audits, produce information notes for various stakeholder categories including decision makers, formulate strategies for knowledge and information dissemination across the region. The proposed knowledge management products listed in the MSP proposal is a preliminary list and it will be finalized during the inception workshop based on the needs determined by both national and regional stakeholders. Knowledge management products will be produced based on the experience and lessons learned from the demonstration activities in Botswana (activities under Outcome 1) and disseminated widely across the region. It is expected that GWP, through KCS, will engage individual service providers for certain specified tasks. These will be determined on a case by case and needs basis. The level of efforts put by the KCS towards achieving Outcome 2 is estimated approximately 35% of their total contribution.


  1. Approximately 30% of the staff time of the Project Management Unit, i.e., Project Coordinator and Administrative Assistant, will be spent towards achieving Outcome 2.


  1. Budget allocated for the actual production of the knowledge management products.


  1. The minimum travel budget is allocated for the national consultant, Project Manager and a representative from the locally based organization to attend regional knowledge sharing meetings to share the experiences learned from the IWRM planning in Botswana and to disseminate the knowledge management products. In order to facilitate bi-directional sharing of information and experiences and ensure the achievement of the Outcome 2, this minimum level of the budget allocation is necessary.


  1. See the Budget Note 1 above. It is estimated that approximately 30 % of the international consultant time will be spent towards achieving Outcome 3.


  1. See the Budget Note 2 above. It is estimated that approximately 30 % of the national consultant time will be spent towards achieving Outcome 3.


  1. The minimum travel budget is allocated for the national consultant, Project Manager and a representative from the locally based organization to travel to the district for field visit, attendance to workshops and monitoring of IWRM and WE pilot sites.


  1. See the Budget Note 3 above. For Outcome 3, the locally based organization will work closely with the national and the international consultants as well as the responsible national institution for the implementation of a WE demonstration project involving selected schools in Botswana. More in details, the aforementioned organization, through the use of its local network of partnership in the country will contribute to the awareness and capacity building activities for all the stakeholders. Lessons learnt will be documented and disseminated across the region thanks to its regional network. The level of efforts put by the locally based organization towards achieving Outcome 3 is estimated approximately 35% of their total contribution.


  1. Approximately 27% of the staff time of the Project Management Unit, i.e., Project Coordinator and Administrative Assistant, will be spent towards achieving Outcome 3.


  1. Budget allocated for the actual introduction of the Water Conservation and Efficiency activities.


  1. Budget allocated for the publication of the IWRM/WE guidelines and other promotional materials.


  1. Budget allocated for the terminal evaluation conducted by a local consultant.


  1. Approximately 21% of the staff time of the Project Management Unit, i.e., Project Coordinator and Administrative Assistant, will be spent for project management.


  1. Budget allocated for an annual audit conducted by a locally based certified firm according to the UNDP NEX guidelines.


Summary of Funds: 3






Year 1

Year 2

Year 3

Total





GEF


308,000

324,000

343,000

975,000





UNDP


420,000

250,000

250,000

920,000





Government of Botswana


900,000

4,000,000

5,700,000

10,600,000





Global Water Partnership


100,000

100,000

100,000

300,000





TOTAL


1,728,000

4,674,000

6,393,000

12,795,000


Annex F: Project Total Budget and Work Plan (including co-financing)


Award ID:

00045537

Award Title:

PIMS 3362 IW MSP: Integrated Water Resources Management

Business Unit:

BWA10

Project Title:

Accruing multiple global benefits through Integrated Water Resources Management/Water Use Efficiency Planning: A demonstration project for sub-Saharan Africa (Botswana)

Implementing Partner (Executing Agency)

Government of Botswana (Ministry of Minerals, Energy and Water Resources – MMEWR)



Expected Outputs

Key Activities

 

Planned Budget

Responsible Partner

Budget Description

Amount (US$)

GEF

Co-Finance

Total



OUTCOME 1: A dynamic IWRM Plan adopted and implemented for Botswana, which addresses national and trans-boundary water management priorities, integrate global environmental management objectives, and balances multiple uses of water resources

Situation Assessment of Status of Water

MMEWR

International Consultants - 71200

27,000.00

200,000.00

227,000.00


Local Consultants - 71300

15,000.00

700,000.00

715,000.00


Identify, prioritise and strategise water resources management issues and actions

Contractual Services (Companies) – 72100

120,000.00

500,000.00

620,000.00


Contractual Services (Individuals) – 71400

48,000.00

350,000.00

398,000.00


Travel – 71600

9,000.00

200,000.00

209,000.00


Establish cross-sectoral institutional coordination mechanism for IWRM

Audiovisual & Print Prod. Costs - 74200

0.00

10,000.00

10,000.00

Rental and Maintenance of Premises - 73100

0.00

70,000.00

70,000.00

IT Equipment - 72800

0.00

200,000.00

200,000.00

Prepare an IWRM Plan

Miscellaneous Expenses - 74500

3,000.00

 

10,000.00

 

13,000.00

 

Sub-Total

222,000.00

2,500,000.00

2,722,000.00

OUTCOME 2: Increased awareness and capacity of national and regional stakeholders (government, private sector and members of the public) to engage in the IWRM (planning and implementation) process

Develop and make available consistent and practical guidance for IWRM

MMEWR

International Consultants - 71200

20,000.00

480,000.00

500,000.00


Local Consultants –

71300

15,000.00

250,000.00

265,000.00


Contractual Services (Companies) – 72100

135,000.00

150,000.00

285,000.00


Contractual Services (Individuals) – 71400

66,000.00

150,000.00

216,000.00


Equipment and Furniture - 72200

0.00

200,000.00

200,000.00

Implement institutional changes to facilitate stakeholder participation

Materials & Goods - 72300

0.00

200,000.00

200,000.00

Rental & Maintenance Premises - 73100

0.00

60,000.00

60,000.00

Create awareness and disseminate information about IWRM (Knowledge management)

Supplies

0.00

150,000.00

150,000.00

IT Equipment - 72800

0.00

200,000.00

200,000.00

Audiovisual & Print Prod. Costs - 74200

46,000.00

250,000.00

296,000.00


Establish bi-directional mechanisms to incorporate national and transboundary concerns and agreements into respective IWRM

Travel – 71600

21,000.00

200,000.00

221,000.00


Miscellaneous Expenses - 74500

6,000.00

10,000.00

16,000.00

Sub-total

309,000.00

2,310,000.00

2,619,000.00

OUTCOME 3: Implementation of IWRM and WE Pilot

Implement & Demonstrate Water Conservation Measures

MMEWR

International Consultants - 71200

18,000.00

200,000.00

218,000.00


Local Consultants –

71300

12,000.00

450,000.00

462,000.00


Travel – 71600

21,000.00

250,000.00

271,000.00


Contractual Services (Companies) – 72100

144,000.00

1,000,000.00

1,144,000.00


Contractual Services (Individuals) – 71400

60,000.00

250,000.00

310,000.00


Rental & Maintenance Premises - 73100

0.00

250,000.00

250,000.00

Awareness and Capacity Building and national & regional Stakeholders

Equipment and Furniture - 72200

0.00

1,200,000.00

1,200,000.00

Materials & Goods - 72300

60,000.00

2,000,000.00

2,060,000.00


IT Equipment - 72800

0.00

500,000.00

500,000.00

Audiovisual & Print Prod. Costs - 74200

30,000.00

300,000.00

330,000.00


Miscellaneous Expenses - 74500

5,000.00

30,000.00

35,000.00

Sub-Total

350,000.00

6,430,000.004

6,780,000.00

Project Management



MMEWR

Local Consultants - 71300

15,000.00

150,000.00

165,000.00


Contractual Services (Individuals) – 71400

47,000.00

150,000.00

197,000.00


IT Equipment - 72800

0.00

100,000.00

100,000.00

Rental & Maintenance Premises - 73100

0.00

120,000.00

120,000.00

Professional services - 74100

27,000.00

30,000.00

57,000.00


Miscellaneous Expenses - 74500

5,000.00

30,000.00

35,000.00

 

 

 

 

Sub-Total

94,000.00

580,000.00

674,000.00

 

Total

 

 

975,000.00

11,820,000.00

12,795,000.00

Annex G: ToRs for the key project personnel


The following positions will be recruited for the Project: Project Coordinator and Administrative Assistant. These positions will comprise the core of the Project Management Unit to which GoB will second a senior water resources management staff member.



1. Project Coordinator (PC)


Overall Purpose:


To ensure the overall coordination and smooth implementation of the UNDP-GEF Project: Accruing Multiple Global Benefits through Integrated Water Resource Management/Water Use Efficiency Planning: A Demonstration Project for sub-Saharan Africa (Botswana)


Generic Skills Required:


The PC will be a leader who will bring to the position status and credibility that is recognized by partner institutions/implementers. S(He) will have the ability to think strategically and be able to work effectively under pressure and manage work and resources within tight deadlines.


The PC will possess excellent communication skills including the ability to write lucidly and succinctly. S(He) will also possess above average interpersonal skills and the ability to work in a multicultural environment.


Specific Responsibility


    The PC will be responsible for the day-to-day management and implementation of the Project to achieve all the stated outcomes and ensure their incorporation into national water resource development and management initiatives.


Technical, managerial and financial tasks:


The technical, managerial and financial tasks of the Project Coordinator are to:


  1. Work closely with relevant Government agencies and partner NGOs to ensure that Project implementation contributes to IWRM planning at the national level;

  2. Prepare annual work plans and budgets for the Project;

  3. Prepare quarterly, annual, mid-term and terminal Project progress reports that cover technical and financial matters for the consideration of the national PSC, UNDP-GEF, and the UNDP CO;

  4. Manage both staff performance and Project evaluations;

  5. Identify IWRM training needs for national stakeholders and arrange for training;

  6. Represent the Project in meetings and conferences to which the Project is invited;

  7. Supervise the activities or inputs of short/long-term consultants and ensure proper delivery of all outputs under implementation; and

  8. Guide the Project’s M&E procedure and make recommendations to national authorities and donors.



2. Administrative Assistant (AA)


Objective:


The AA will provide administrative and management backstopping to the PMU. This will include managing procurement processes, arranging meetings and workshops and maintaining linkages with related projects and programmes in Botswana and in the region.


Specific Administrative tasks:


The specific administrative tasks of the AA are to:



3. National Consultant


Duties:


Under the overall supervision and guidance of the Global Water Partnership and the UNDP Country Office, the consultant will, in close collaboration with the relevant national staff, be responsible for producing information notes on IWRM for use at national level. Specifically s/he will undertake the following tasks:



The consultant will spend 35 % of his/her time towards the achievement of Outcome 1, 35% towards Outcome 2, and 30% towards Outcome 3.


Experience and Qualifications:



Duration:


The task to be performed by the national consultant is expected to take 40 weeks over the three year period.


Budget:


The table below contains the draft budget for the national consultant.


Item

Unit cost (USD)

Total cost (USD)

Fees for 40 weeks

1000/wk

40,000

Miscellaneous (communications, taxis,

flight adjustment, etc.)


2,000

Grand Total


42,000





4. International Consultant


Duties:


Under the overall supervision and guidance of the Global Water Partnership and the UNDP Country Office, the consultant will, in close collaboration with the relevant national staff and consultant, be responsible for producing information notes with a regional component. Specifically s/he will undertake the following tasks:



The consultant will spend 40 % of his/her time towards the achievement of Outcome 1, 30% towards Outcome 2, and 30% towards Outcome 3.


Experience and Qualifications:



Duration:


The task to be performed by the international consultant is expected to take 45 working days over the life of the project (3 years).


Budget:


The table below contains the draft budget for the ToRs.


Item

Unit cost (USD)

Total cost (USD)

Fees for 45 working days

600

27,000

DSA for 30 days in Gaborone

200

6,000

Travel to the region*

5,000

30,000

Miscellaneous (communications, taxis, flight adjustment, etc.)


2,000

Grand Total


65,000

* The international consultant is expected to travel to Botswana twice a year during the duration of the project to ensure the effective coordination of his/her work with the national consultant and the quality of the outputs under all the outcomes. To reduce this cost, the preference will be given to a consultant based in the sub-Saharan Africa region.




5. Contractual Services (Company)


Background:


The Regional Knowledge component of the Botswana IWRM Plan project will be managed by the Global Water Partnership-Southern Africa Chapter in collaboration with the Botswana Country Water Partnership (BCWP). BCWP comprises a variety of institutions including the Botswana Department of Water Affairs. The Partnership is chaired by the University of Botswana and hosted by the Kalahari Conservation Society (KCS) which provides the Secretariat services to the partnership.


It is envisaged that GWP-SA will carry the responsibility for the bulk of the work across all the three outcomes, including the generation of regional knowledge management products for dissemination to stakeholders at local level and decision makers both in-country and across the region. GWP will contract with KCS to compile, generate and disseminate this information. KCS will also enter into the partnership with the Government of Botswana to share the project execution responsibilities for this project. The details of the cooperation will be specified in the cooperation agreement between the Government of Botswana and the KCS to be attached to the UNDP Project Document.


This Terms of Reference details the technical tasks that KCS will be expected to perform towards the achievement of the project outcomes. The KSC is expected to spend 30 % of its effort towards the achievement of Outcome 1, 35% towards Outcome 2, and 35 % towards Outcome 3.


Duties:



Experience and Qualifications:






1 Under the championship of the National Committee on Climate Change, Botswana has submitted its Initial National Communication to UN Framework Convention on Climate Change and is now in the process of developing its Second National Communication, both supported by UNDP/GEF funds.

2 In Tanzania, for example, the management of Pangani River basin is trying to integrate climate change adaptation concerns into its IWRM Planning with the UNDP/GEF funding. Exchange of information with the Pangani River Adaptation project would be particularly useful to mitigate the potential climate change risk for this project.

3 Summary table should include all other co-financing (cash and in-kind) that is not passing through UNDP.

4 Direct co-financing committed by the Government of Botswana for the implementation of the Demonstration Project “Water conservation through conjunctive Use of Grey-water Re-use and harvested rainwater in schools within Botswana: A Case for IWRM and WE Plan Implementation” is estimated at US$ 980,000. USD6.43 mil includes the additional investment by the GoB for the implementation and piloting of other IWRM and WE initiatives (i.e. installation of technology to realize night/day switches in institutions; installation of technology to reduce evaporation in Botswana dams; storm water harvesting etc.), as stated in the letter of co-financing from the Department of Water Affairs, the Government of Botswana. These will build on and contribute to the achievements of the outcomes of the demonstration project and ensure the sustainability of outcomes realized by the demonstration project. The additional co-financing has been committed as part of the upcoming 10th National Development Plan.


CEO Endorsement Template-Aug 29, 2007.doc

43