PROJECT DESCRIPTION
MWSS received Technical Assiistance (TA) financing from the World Bank in
2005 to partially update their Water Supply Master Plan and to prepare a
comprehensive Master Plan for Sewerage and Sanitation for its service area to the year
2025. The 2005 Master Plan proposed a decentralized small-bore sewerage approach
and 16 new regional combined STP-SpTP's, utilizing anaerobic biological treatment.
Combination sewage-septage treatment plants are common in the US (25% of
the US population have septic tank) and Australia, with septage to sewage portions
usually less than 5%. One combined plant in Greece treats up to 40% sepatge with
sewage. The advantages of combined sewage-septage treatment plants include I)
Possible revenue for the treatment plant from independent haulers, ii) Use of excess
treatment plant capacity maximum utilization of vacuum trucks, iii) Availability of a
legitimate septage disposal site for independent haulers, and iv) Regional centralization
of waste treatment facilities to name a few.
The MWSI Project 7 Communal Septic Tank is conceived for a proposed
protoype Sewage-Septage Treatment Plant in 11 Road A, St Anthony Village, Quezon
City which drains 45.6 ha. Of sewerage reticulation. It was selected due to a number of
advantages, including a) site is in MWSI's area b) Project 7 currently has a poorly
operating treatment system the pollutes Culiat Creek c) The site area consists of about
1200 sq.m. d) There are no informal settlers on the site e) The site is government
owned f) there are significant numbers of septic tanks in adjacent areas to draw septage
g) access road is reasonable and trucks regularly come and go from the site h) the site
is close to MWSI offices in Balara for monitoring, and I) sewage flow is something less
than about 2 MLD.
The process design consist of a anaerobic (UASB) aerobic (SBR) biological
treatment plant. Other process components would include possible reuse of the imhoff
tanks for balancing, new sewage inlet works, a septage acceptance area, biosolids
dewatering building and equipment, new chlorination disinfection system and contact
tank, and odor control. The process will used 10% septage (240 m3/d), anaerobic-
aerobic biotreatment.
Project 7 would help MWSI better utilize their current fleet of 32 septic tank
pumpout trucks ( includes 7 Mobile Dewatering Units). MWSI estimated that the
current average for truck trips to Dagat-Dagatan STP-SpTP is about 1.2 or 257 m3
septage/day. At that frequency, the number of 5 m3 septic tanks desludged annually
(300days/year) is about 15,700.
Project 7 could potentially increase the number of trips per day per truck to a
treatment facility to 1.5 (estimate by MWSI). At that frequency, the number of 5 m3
septic tanks desludged annually (300 days/year) would be about 19,500 (24%
increase), with the septage delivered being about 321m3/day (25% increase). A more
detailed traffic/septic tank pumpout study would be required to fully verify the effect of
adding Project 7.
Another point worthy of note is that West Quezon City (QC) has a high
sanitation target for MWSI by the year 2021. A STP-SpTP in West Quezon City would
be well placed to help deliver on this target.
The Manila Third Sewerage Project (MTSP) Global Environmental Facility
(GEF) proposed prototype STP-SpTP will likely be the first of many similar
decentralized sewerage and treatment plants if the 2005 Master Plan is implemented.
Sixteen regional STP-SpTP's wer proposed to be operating by 2025 to address the
most serious of the pollution hot spots in the MWSS service area. The fact that the
proposed Project 7 site, one of about 1,200m2 , can support both 2.4 MLD of sewage,
plus up to 15% septage (or 360 m3/d) also contributes to the replication concept around
land-scarce Metro Manila
INITIAL ENVIRONMENTAL EXAMINATION (IEE)
REPORT
For
Collection, Transport, Treatment and Disposal of Sewage
Below is the IEE Report Checklist for Collection, Transport, Treatment and
Disposal of Sewage. Read the questions carefully before answering in the space
provided. Use additional sheets if necessary and indicate this in an appropriate
space.
Misleading or erroneous answer are the basis for legal actions and/or
denial of ECC
PROJECT LOCATION: 11A Road A,, Project 7, Quezon City
NAME OF PROPONENT: Maynilad Water Services, Inc.
ADDRESS: MWSS Compound, Katipunan Road, Balara, Quezon City
A. GENERAL
INFORMATION
1. Project Ownership
Single Proprietorship _____ Partnership ______ Corporation __X___
2. Capitalization & Project Cost
a. Capitalization:
Authorized: Php__6B______
Paid
up:
Php
____5.24B_________
b. Estmated Project Cost: Php _230 Million___________
3. Project Components: Prototype Treatment Plant for Sewage and Septage
4. Project Site (Attach location and vicinity maps and photographs of front,
left, right and rear views for project site as Annex 1 for Treatment and
Disposal components only)
a. Land:
i. Total Land Area: 1,200 m2
ii. Proposed land area to be occupied: __309 m2_____
iii. Is the area owned or leased? __ MWSS owned_______
1. If leased, period covered
(Attach document, TCT as Annex 2)
iv. Access road construction
b. Classification
Industrial _________
Residential ___X______
Commercial _______
Other, pls. specify _____
5. Description of Project Phases
a. Collection
i. Manpower Requirement:
ii. Equipment to be used
Equipment Quantity
MDU 5
Service Cleaning Truck
2
Use additional sheet if necessary
iii. Completion time (from site to transport vehicle)
ii. Transport
i. Manpower
Requirement:
iii.
Equipment to be used
Equipment Quantity
Dump truck ( for sludge)
2
Use additional sheet if necessary
iii. Completion Time (truck to treatment/disposal site)
c. Treatment (Sewage/Septage Treatment Plant)
i. Pre-Operational Construction Phase
Activity Timeframe
Plans/Design 180
days
Permits/Clearances 60
days
Site Preparation and Clearing
30 days
Excavation
To be determined by final proj.
giving design and report
Civil Works
"
Finishing "
Installation of Equipment
".
Commissioning and Start-up
"
iv.
Manpower Requirement:
v.
Facilities Requirement:
· Water
Supply
Source Consumption/day
Local Water District
Deepwell
Surface Water
· Power
Supply
Source Consumption/day
Local Electric Utility
2,547 KWh
Generator Back-up
Others (pls specify)
vi. Operation
Phase
· Capacity of Plant/day: 2.4 MLD
· Process Flowchart: See Annex 1
· Manpower Requirement: 11
· Other Waste Generated
Type of Waste
Source of Waste
Volume of Waste
Mode of Disposal
Treated domestic
Employees of
2,605 cum/day
By gravitational flow
wastewater
treatment facility
to receiving body of
(effluent)
water after
treatment
Sludge Septage/Sewage
26
m3/day
Transported to lahar
area and used as
soil conditioner
vii.
Abandonment Phase ( None)
Facilities to be
Waste Generated
Restoration Plan
Abandoned
Local Electric Utility
Generator
b. Disposal
a. Pre-Operational Construction Phase
Activity Timeframe
Plans/Desighn
To be determined by final
project giving design and report
Permits/Clearances "
Site Preparation and Clearing
"
Excavation "
Civil Works
"
Finishing "
Installation of Equipment
"
Commissioning and Start-up
"
b. Manpower Requirement:
b.1 Facilities Requirement
i. Water Supply
Source Consumption/day
Local Water District
Deepwell
Surface Water
5 cum/day
ii. Power Supply
Source Consumption/day
Local Electric Utility
Generator
Others (pls specify)
iii. Operation Phase
iv. Capacity of Plant/day:
v. Process Flowchart
vi. Manpower Requirement
vii. Other Waste Generated
Type of Waste
Source of Waste
Volume of Waste
Mode of Disposal
Solid Wastes
Construction
to be determined by Landfill
waste/spoil
final project giving
materials
design and report
c. Abandonment Phase
Facilities to be
Waste Generated
Restoration Plan
Abandoned
Local Electric Utility
NA
NA
Generator
B.
DESCRIPTION OF ENVIRONMENTAL SETTING
(For Treatment and Disposal Components Only)
1.
Physical
Environment
1.a
Description of Terrain (% slope)
Flat or Level (0-3) _flat___
Level to undulating (3-8) ____
Undulating
to
rolling
(8-18)
____
Rolling to Moderately steep (8-30) ____
Moderately steep to steeply mountainous (30-50) ____
Very Steeply mountainous (above 50) ____
1.b
Is
the
area erosion prone? __No___
If so, what is the status: slight ___ Moderate ___ Severe ___
1.c
Are there existing natural hazards in the area, e.g. landslides,
gullying, subsidence, etc? None___
If
yes,
please
enumerate them __________________________
1.d
Is the site situated along a flood prone/storm surge area? ____
1.e
Is the project beside or near the shoreline? _No___
If
yes,
how
far?
1.f
Are there water bodies found inside or near the project site? Yes
If yes, please enumerate them: _Culiat Creek__________
What is the quality of water?
Fresh
_X (but highly silted and polluted)
Brackish_____
Saline/Salty__
1.h
What is the quality of air?
Poor
____
Fair
_X___
Good _____
2. Biological
Environment
2.a
Is the project immediately adjacent to a natural ecosystem? _No__
If yes, Please check:
Forest ___
Coastal/Marine _____
Marshland _____
Grassland ____
Mangrove ____
Wetland _____
Others, Please specify _________
2.b
Are there any wildlife in the area? _None_
If yes, Please identify and enumerate: _______________________
_____________________________________________________
2.c
Are there trees within the project site? Yes
If yes, please identify and enumerate: Mango, Tamarind, Duhat,
and Santol__________________________
2.d
Is there other vegetation within the project site? No
If yes, please identify and enumerate:
3. Socio-Economic
Environment
3.a
Total household to be affected? _________________________
What will happen to them? These are adjacent areas which will be
affected by the noise, air pollution (particulates) during construction,
this is temporary, and traffic due to hauling of construction
materials. The adjacent area during operations will be benefited by
regular septage collection and the treatment of their wastewater.
3.b
Will you employ vulnerable groups? ____No_______
If yes, please enumerate: Elderly ___Children ___ Handicapped __
3.c Are there health facilities within the project site? _None_(once
operational, we will put satellite health facilities for employees)___
3.d Are there required benefits under the labor code and other
regulations to be enjoyed by the staff? _Yes___
If yes, please enumerate: Treatment plant operators, who are
regular employees of Maynilad, will receive and enjoy the company
benefits given to a regular employees and the corresponding
hazard pay relative to workers on sewage.
3e. Are the local inhabitants to be benefited by the project? Yes,
wastewater generated by each households will be properly treated
at the sewage treatment plant to be constructed. Hence, effluent
will meet the environmental standards set by the government and
will eliminate disease causing organisms, odor, water pollution
caused by untreated wastewater
3.f
Are the cultural norm/ morals and lifestyle of the local inhabitants to
be affected by the project? No
Please elaborate: The design of the STP-SpTP will abide
with the government environmental regulations.. However,
homeowners will be made aware of their social responsibility on
proper disposal of wastes to prevent clogging of sewer pipes to
help maintain an efficient sewerage network and treatment plant
3.g
Are there oppositions to the project? None. Endorsements from
the barangay and/or Homeowner's Association of the project site
are currently being processed. A Memorandum of Agreement
(MOA) will be executed between the company and the appropriate
party as needed.
4. Project
Impacts
4.a.1 For Collection and Transport of Sewage
Components
Answer
Describe Impacts
Describe your
/Parameters
Yes No
Mitigating/Enhancement
Measures
Will it affect
ambient air
X
quality in the
area?
Will the
· Sewage collection
collection/transpo
will be transported
rt process
X
from households to
distract on-going
the plant through
activities in the
sewage pipelines by
immediate
gravity
vicinity?
(existing, some
additional lines have
to be laid)
Will the collected
· Overflow due to Regular maintenance and
sewage
breakdown of
management of
immediately
X
equipment may also equipment
proceed to the
occur
treatment or
disposal area
Will the
· Use of degreasers Program of regular and
equipment used
and cleaning
preventive maintenance
be immediately X
solutions may leak will be implemented to
cleaned after the
to water
ensure efficient plant
respective
environment
operations
activities?
Use of environmental
friendly cleaning solution
Use of oil separators
4.a.2 For Collection and Transport of Sludge
Components
Answer
Describe Impacts
Describe your
/Parameters
Yes No
Mitigating/Enhancement
Measures
Will it affect
· Trucks
may Trucks will be regularly
ambient air
generate odors from cleaned, maintained and
quality in the X
the composition and properly covered.
area?
concentrations of
Hydrogen Sulfide
and Ammonia from
sludges
· Particulates from Proper maintenance of
tires / engines
vehicles
Will the
·
Traffic may be
Assignment of workers to
collection/transpo
affected
direct traffic in the area
rt process
X
distract on-going
Program for traffic plan
activities in the
and management
immediate
vicinity?
· Vehicles parking Sufficient parking area for
outside the premises operational vehicles
Will the collected
sludge
X
immediately
proceed to the
treatment or
disposal area
Will the
· Use of cleaning Program of regular and
equipment used
solutions for trucks preventive maintenance
be immediately X
may leak to water will be implemented to
cleaned after the
environment
ensure efficient plant
respective
operations
activities?
Use of environmental
friendly cleaning solution
Use of oil separator
Treatment of warm water
4.b
For Treatment and Disposal
1. Pre-Construction Details
Components
Answer
Describe Impacts
Describe your
/Parameters
Yes No
Mitigating/Enhancement
Measures
Is there land X
· Water Quality
clearing
Demolition of
Timing of demolition
existingstructures and during dry season.
hauling debris
Proper orientation for the
(minimal)
demolition contractor on
Erosion which might the conditions of the ECC
result in frequent
by the proponent
flooding in the area
(minimal)
· Solid
Waste
Waste segregation,
Demolition of
recycling/re-use and
existingstructures and proper disposal of debris
hauling debris
Part of provision of
(minimal)
contract for construction
Disposal of
given to contractor
demolished debris and Will be sold as scrap
scrap materials
materials or as filing
(minimal)
materials for concrete
debris
Handling of Asbestos Materials for re-used
waste materials,
To be used as back fill
minimal (for
confirmation)
· Increase
in Provision of personal
accident/incidents for protective equipment
workers and
Fencing of the area to be
pedestrians
demolished
Implementation of safety
management plan
· Traffic
Congestion
Hauling of debris to be
Demolition of existing done during non-rush
structures and hauling hours
debris (minimal)
Proper orientation for the
demolition contractor on
the conditions of the ECC
by the proponent
Assignment of workers to
direct traffic in the area
Is there
·
Removal of fruit
Will secure permit to
vegetation
X
bearing trees
cut/relocation of trees
clearing?
Plant new trees
Is there tree X
·
Removal of fruit
Will secure permit to
cutting?
bearing trees
cut/relocation of trees
Plant new trees
Is there topsoil
·
Topsoil will be
Topsoil will be replaced
removal/replace
X
temporarily disturbed
ment?
during construction
Is there
X
.
excavation works
and cut & fill
activities?
Is there other X
· Air/Noise
earthmoving
Demolition of existing Use of well maintained
activities
structures and hauling hauling equipment
of debris (minimal)
Increased TSP and Regular watering of TSP
noise level in the area sources
(minimal)
Fencing of the area to be
demolished
Regular cleaning of the
vicinity of the project site
particularly the roadways
· Solid
Waste
Waste segregation,
Demolition of existing recycling/re-use and
structures and hauling proper disposal of debris
of debris (minimal)
Part of provision of
Disposal of
contract for construction
demolished debris and given to contractor
scrap materials
Will be sold as scrap
(minimal)
materials or as filling
materials for concrete
debris
Proper orientation for the
demolition contractor on
the conditions of the ECC
by the proponent
Handling of Asbestos Materials for re-used
waste materials (for To be used as back fill
confirmation)
· Traffic
Congestion
Hauling of debris to be
Demolition of existing done during non-rush
structures and hauling hours
debris
Assignment of workers to
direct traffic in the area
Proper orientation for the
demolition contractor on
the conditions of the ECC
by the proponent
Provision of personal
· Increase
in protective equipment
accident/incidents for Fencing of the area to be
workers and
demolished
pedestrians
Implementation of safety
management plan
Is there
· Stockpiling
of Stockpiling of
stockpiling of
construction materials construction materials will
sand gravel
X
will use the
be stockpiled just enough
material in the
vacant/unutilized
for the on-going activity. -
site?
spaces
Good construction
practices and orderly site
keeping will be effected
Is there drilling,
· Air/Noise
boring &
X
Demolition of existing Use of well maintained
hammering
structures and hauling hauling equipment
activities?
of debris (minimal)
Increased TSP and Regular watering of TSP
noise level in the area sources
(minimal)
Fencing of the area to be
demolished
Regular cleaning of the
vicinity of the project site
particularly the roadways
· Solid
Waste
Waste segregation,
Demolition of existing recycling/re-use and
structures and hauling proper disposal of debris
of debris (minimal)
Part of provision of
Disposal of
contract for construction
demolished debris and given to contractor
scrap materials
Will be sold as scrap
(minimal)
materials or as filling
materials for concrete
debris
Proper orientation for the
demolition contractor on
the conditions of the ECC
Handling of Asbestos Materials for re-used
waste materials (for To be used as back fill
confirmation)
· Traffic
Congestion
Hauling of debris to be
Demolition of existing done during non-rush
structures and hauling hours
debris
Assignment of workers to
direct traffic in the area
Proper orientation for the
demolition contractor on
the conditions of the ECC
by the proponent
· Increase
in Provision of personal
accident/incidents for protective equipment
workers and
Fencing of the area to be
pedestrians
demolished
Implementation of safety
management plan
Is there any
slope
X
modification or
ground leveling?
Is there
X
· Traffic
Congestion
increased traffic
Demolition of existing Hauling of debris to be
movement in the
structures and hauling done during non-rush
area?
debris
hours
Assignment of workers to
direct traffic in the area
Proper orientation for the
demolition contractor on
the conditions of the ECC
by the proponent
Is the
X
· Traffic
Congestion
Hauling of debris to be
public/community
Demolition of existing
done during non-rush
access
structures and hauling hours
to/through the
debris
Assignment of workers to
area affected?
direct traffic in the area
Proper orientation for the
demolition contractor on
the conditions of the ECC
by the proponent
Is there an
· Increase in number of
increased
X
employees may
economic activity
generate economic
in the area?
activities in the area.
Is there an
· Increase employment Recruitment (preference
increase in the X
for construction
on local hires)
availability of
workers
employment?
Is there
displacement of
X
people in the
area?
Does the
displacement
involve relocation
NA
NA
of affected
parties?
2. Construction Details
Components
Answer
Describe Impacts
Describe your
/Parameters
Yes No
Mitigating/Enhancement
Measures
Is there land X
clearing
Is there
vegetation
X
clearing?
Is there tree X
cutting?
Is there topsoil
·
Topsoil will be
Topsoil will be replaced
removal/replace
X
temporarily disturbed
ment?
during construction
· Water
Quality
Excavation works for Proper spoils
building foundation
management
Erosion/siltation which Timing of construction
might result in frequent activity during dry season
flooding in the area
Proper orientation for yhe
contractor/s on the
conditions of the ECC by
the proponent
Is there
· Air/Noise
excavation works
X
Construction of the Use of new and well
and cut & fill
buildings/superstructur
maintained earthmoving
activities?
e, operation of heavy equipment
equipment, movement Regular watering of TSP
of vehicles to and from sources
the site
Fencing of the
construction area
Regular cleaning of the
vicinity of the project site
particularly the roadways
· Untreated
sewage
Discharge of untreated Provision of temporary
sewage from
facility/portalets for
construction
construction workers
employees
· Solid
Waste
Improper disposal of Waste segregation,
solid waste
recycling/re-use and
proper disposal of
garbage
Waste minimization such
as use of steel form
works
· Traffic
Congestion
Delivery of construction
materials to be done
during non-rush hours
(9PM to 3AM) for large
haulers
Assignment of workers to
direct traffic in the area
As much as possible
avoid the use of sidewalk
as depository of
construction materials
Is there other X
· Water
quality
earthmoving
Excavation works for Proper spoils
activities
building foundation
management
Erosion/siltation which Provision of erosion
might result in frequent control measures
flooding in the area
Timing of construction
activity during dry season
Proper orientation for the
contractor/s on the
conditions of the ECC by
the proponent
· Air/Noise
Construction of the Use of new and well
building/superstructure, maintained earthmoving
operation of heavy equipment
equipment, movement Regular watering of TSP
of vehicles to and from sources
the site
Fencing of the
Increased TSP and construction area
noise level in the area
Regular cleaning of the
vicinity of the project site
particularly the roadways
· Untreated
Sewage
Discharge of untreated Provision of temporary
sewage from
facility/portalets for
construction workers
construction workers
· Solid
Waste
Improper disposal of Waste segregation,
solid waste
recycling/re-use and
proper disposal of debris
Waste minimization such
as use of steel form
works
· Traffic
Congestion
Demolition of existing
Delivery of construction
structures and hauling materials to be done
debris
during non-rush hours
(9PM-3AM) for large
haulers
Assignment of workers to
direct traffic in the area
As much as possible
avoid the use of sidewalk
as depository of
construction materials
· Increased incidents on Provision of adequate
localized flooding
drainage lines/system
around the project site
Coordination with the
local government for its
maintenance after
construction
Support the Social
Development Program of
the Barangay particularly
the flood control
programs
Is there
· Stockpiling
of Stockpiling of
stockpiling of
construction materials construction materials will
sand gravel
X
will use the
be stockpiled just enough
material in the
vacant/unutilized
for the on-going activity.
site?
spaces
Good
construction
practices and orderly site
keeping will be effected
Is there drilling,
· Air/Noise
boring &
X
Construction of the Use of new and well
hammering
buildings/superstructur
maintained earthmoving
activities?
e, operation of heavy equipment
equipment, movement Regular watering of TSP
of vehicles to and from sources
the site
Fencing of the
construction area
Regular cleaning of the
vicinity of the project site
particularly the roadways
· Water
Quality
Excavation works for Proper spoils
building foundation
management
Erosion/siltation which Provision of erosion
might result in frequent control measures
flooding in the area
Timing of construction
activity during dry season
Proper orientation for the
contractor/s on the
conditions of the ECC by
the proponent
· Incident of accidents Provision of PPE's
on workers/pedestrians Provision of erosion
control measures
Fencing of the
construction site
Implementation of safety
management plan
Is there any
slope
X
modification or
ground leveling?
Is there
X
· Traffic
congestion Assignment of workers to
increased traffic
during hauling of
direct traffic in the area
movement in the
sludge and delivery to Hauling of sludge during
area?
site of septage
non-rush hours
Is the
X
· Increase incidents on Provision of adequate
public/community
localized flooding
drainage lines/system
access
around the project site
to/through the
Coordination with the
area affected?
local government for its
maintenance after
construction
Support the Social
Development Program of
the Barangay particularly
the flood control
programs
· Traffic
Congestion
Delivery of construction
materials to be done
during non-rush hours
(9PM to 3AM) for large
haulers
Assignment of workers to
direct traffic in the area
As much as possible
avoid the use of sidewalk
as depository of
construction materials
· Incidents of accidents Provision of PPE's
on workers/pedestrians Provision of safety nets,
overhead canopies, etc.
to prevent and contain
falling debris
Implementation of safety
management plan
Is there an
· Increase in number of
increased
X
employees may
economic activity
generate economic
in the area?
activities in the area.
Is there an
· Increase employment Recruitment (preference
increase in the X
for construction
on local hires)
availability of
workers
employment?
Is there
displacement of
X
people in the
area?
Does the
displacement
involve relocation
NA
NA
of affected
parties?
3. Operation and Maintenance Phase
Components
Answer
Describe Impacts
Describe your
/Parameters
Yes No
Mitigating/Enhancement
Measures
Will the project
·
This is already
Meeting treatment
generate
X
treated effluent and efficiency and compliance
wastewater?
will be discharged to with effluent standards
a river near the plant
Is there an effect
· Improved
water Effluent sampling will be
on the quality of
X
quality in the
conducted at the
the receiving
receiving water
treatment plant weekly
body of water?
bodies through
while water sampling will
treatment of the be conducted at Culiat
sewage. Previous River monthly
plant only has
physical removal
Is there an
· Minimal increase but Monitoring of flow and
increase in
X
will improve flow in water quality
surface run-off to
the stream (positive) Provide good drainage for
other areas?
septage in the area for
run-off
Is there increase
· Increase in water To be sent to treatment
in water
X
demand from
plant for proper treatment
demand?
vehicles/plant
maintenance
Is there dust
· From the generator Regular maintenance and
emission into the
X
which will be used check up of generator
environment?
as back up during Use of right fuel
power failures
Will it affect the
· Air
Pollution
ambient air
X
Additional pollution Proper operation and
quality of the
load resulting from maintenance of generator
area?
the operation of
set
generator set
Odor from treatment Use of odor control
operation and failure system
of odor control
Regular maintenance of
facility
odor control system
Proper housekeeping
Regular maintenance of
vehicles
· Noise
Pollution
Good foundation design
and proper enclosures
Proper orientation for the
homeowners Use of
baffles
Is there air
· From the generator Regular maintenance and
pollution sources
X
which will be used check up of generator
equipment to be
as back up during Use of right fuel
installed?
power failures
Proper design of
equipment
Are hazardous
· Waste
lubricants/oils Proper maintenance of
wastes to be
X
from
equipment
discharged to the
equipment/vehicle
Proper design of
environment?
equipment
Use of degradable
lubricant/oil
Is there any
(we do not anticipate)
pollution
X
complaint from
the nearby
residents?
Is there an
increased in
X
crime / security
concern in the
area?
Others, please
· Sanitation problem Waste segregation
specify
caused by improper adoption /following the
disposal of solid MMDA guideline
waste (from
Regular collection and
employees)
disposal of solid waste in
coordination with the local
government
Provision of central
garbage collection and
storage area
· Flooding
incidents Proper drainage
Instability of the soil considered in the design
or geology of the site of the building
which could damage Designing the building
/affect the integrity of strictly in conformance
the building
with the building code
The building shall be
· Incidents
of designed to meet the
accidents fire/safety building, fire and safety
of residents, visitors requirement of the
and clients
Building and Fire Code
Conduct of annual fire
drill in coordination with
Quezon City Fire
Department
· Generation
of To be sent to lahar and
sludges from
used as soil conditioner
treatment plant
Monitoring of volume and
quality
4. Abandonment & Rehabilitation Phase
Components
Answer
Describe Impacts
Describe your
/Parameters
Yes No
Mitigating/Enhancement
Measures
Will any of the
facilities be
abandoned or
X
demolished after the
project life?
Will any of the
· Some equipment Regular monitoring of
facilities need to be
need to be
asset condition will be
rehabilitated after a
X
replaced due
implemented to avoid
certain period of
their wear and facility deterioration
time?
tear warranty
Is there a generation
X
· Piled
sludges
Immediate removal
of solid waste?
Is there an increase
· Slight increase in Traffic plan will be
traffic movement in
X
vehicular traffic instituted
the area?
during
construction
Is there an effect on
the road system of
X
the community?
Is there an increase
· Employment rate Hiring of local residents
in the availability of
X
for construction will be prioritized during
employment?
workers will
construction phase
increase during
construction
Is there an increase
in population from
X
migration?
Is there an increase
· Removal
of
in land value?
X
facility will
increase land
value later on
Will the project
· The structure Proper architectural
structure affect or
may cause
design to balance
obstruct the view X
aesthetic
structure with the
from adjacent
imbalance in a residential community
areas?
residential area
Is there an increase
X
in crime / security
concern in the area?
Is there an increase
X
· Noise
from Proper operation and
in noise level in the
vehicles and
maintenance of vehicles
area?
from operating of and operating machine
machine
ATTACHMENTS
1.
Government Permits and Clearance (attach photocopies of documents)
PERMITS / CLEARANCES
ATTACHED
Location Clearance / Certificate of Locational Viability
- To follow -
DTI / SEC Registration
"
Safety (Fire) Permit
"
Municipal / Business Permit
"
Other(s) "
PERMITS / CLEARANCES
ATTACHED
Transfer Certificate of the Title
- To follow -
Map / Delineation of Primary & Secondary Impact Areas
"
Colored Photo of the Site (Different Perspective)
"
Construction Schedule in Chart Form
"
Endorsement from the LGU ( Barangay Certificate)
"
Environmental Management Plan / Program
"
Document Outline
- þÿ
- þÿ
- þÿ
- þÿ
- þÿ
- þÿ
- þÿ
- þÿ
- þÿ
- þÿ
- þÿ
- þÿ
- þÿ
- þÿ
- þÿ
- þÿ
- þÿ