Unit of measure
* Footnote
Source: Source


PCU, FFA
For consideration during the design of Phase III (late 2008 – 2009)
The proposed long-term capacity building project in OFM be based on systematic assessments of training
needs in OFM in each country, and appropriate Fisheries institutional models and arrangements.
Responsible
units
Time Frame
Key actions
Project Design