Unit of measure
* Footnote
Source: Source
3
PCU, FFA
For consideration during the design of Phase III (late 2008 – 2009)‏
The proposed long-term capacity building project in OFM be based on systematic assessments of training needs in OFM in each country, and appropriate Fisheries institutional models and arrangements.
Responsible units
Time Frame
Key actions
Project Design