nNumber
of farms Ctl 1450 and Pig 49
nManure
pads need Ctl 446.5 thou m2
nSlurry
reservoirs need Ctl 472.7 thou m3 and Pig 39.8 thou m3
nManure
pads construction cost Ctl 22.5 M EUR
nSlurry
reservoirs cost Ctl 50.8 M EUR and Pig 4.6 M EUR
nTotal
cost 78.0 M EUR