DANUBE DELTA NATIONAL INSTITUTE
FOR RESEARCH & DEVELOPMENT
TULCEA - ROMANIA
4
"Http://www.indd.tim.ro"
5
Danube River and Danube Basin
6
"Part of the"
  • Part of the  Man and Biosphere Programme of UNESCO since 1990
  • Included in Ramsar Convention List since 1990
  • Included in World Heritage List since 1990
7
 
8
DANUBE DELTA BIOSPHERE RESERVE
LOCATION AND PRESENT GENERAL LAND USE
9
HUMAN INDUCED CHANGES IN THE DANUBE DELTA
10
DAMMING FLOODPLAIN UPSTREAM THE DELTA
11
DAMMING AND CHANNEL EXCAVATIONS
12
HYDROLOGY AND
WATER CHEMISTRY CHANGES
13
THE REHABILITATION PROGRAMME
14
REHABILITATION MANAGEMENT OBJECTIVES
15
Ob.2. Carry out restoration works where natural or semi natural character has been lost
16
"Ob.3"
  • Ob.3. Manage water circulation in order to improve the ecological conditions



  • Ob.4. Assess the effectiveness of existing buffer zones and if necessary recommend modifications
17
THE REHABILITATION PROGRAMME HAS TWO MAIN CATEGORIES OF PROJECTS
  • WETLAND RESTORATION PROJECTS
  • - Research, design, monitoring: DDNI in cooperation with RIZA – the Netherlands and Institute for Floodplain Ecology, Rastatt, WWF Germany
  • - Civil works: DDBRA
  • HYDROLOGICAL SYSTEM REHABILITATION PROJECTS
  • -Research and design: DDNI &RIZA
  • -Civil works: DDBRA


18
ADDITIONAL COMPONENTS
  • Restoration of habitats and ecosystems


  • Restoration of the endangered species


  • Restoration of the affected landscape
19
The main actors
20


WETLAND RESTORATION PROJECTS
  • Objectives:
  • Restore the specific functions of the wetlands
  • Restore lateral connectivity and reintegration in the natural river pulse system
  • Restore the natural habitats that support biodiversity and natural resources
  • Recover traditional economic activities of the local communities
21
 
22

BABINA-CERNOVCA PILOT PROJECT
  • S = 2,100 ha Babina, 1,580 ha Cernovca, former agriculture polders (drained areas)
  • Research: 1991-1994, cooperation with Institute for Floodplain Ecology, Rastatt, WWF Germany
  • Monitoring: 1995-2002
  • Project status: fully implemented, Babina reverted to wetland since 1994, Cernovca since 1996
  • Present status: a mosaic of water types, clear to turbid water systems, depending on the connectivity to the river
23
BEFORE FLOODING
24
2 YEARS AFTER FLOODING
25
AGRICULTURAL POLDER IN DANUBE DELTA
26
 
27
 
28
Babina-Cernovca area
(satellite images)
29
REHABILITATION OF THE NATURAL FUNCTIONS
30
 
31
 
32
OTHER
WETLAND REHABILITATION PROJECTS
33

HOLBINA-DUNAVAT PROJECT
  • S = 5,630 ha, former fish farms
  • Research: 1993-1996
  • Result: Restoration strategy
  • Implementation status: investment funds available since 2003
  • Evolution:  water system reverted from turbid plankton-dominated to clear macrophytes –dominated state (!)
34
Secchi depth in 1995, 1996, 1997, 2002
(Drost et al, 2002)
35
POPINA PROJECT


S = 3,600 ha, fish ponds
-Research: 1996-1999
-Implemented since 2000
-Status: permanent wetland connected to the river pulse system
36


FORTUNA PROJECT
-S = 2,115 ha
-Former polder for forestry
-Research: 2000-2002
-Present status: under implementation
37
Hydraulic connectivity restoration
  • S = 687 ha
  • -Origin: Islets formed by cutting meanders
  • -Research: 2002
  • -Restoration to be implemented


38
MEANDERS PROJECT
39

HYDROLOGICAL SYSTEM
 REHABILITATION
  • Objectives:
  • -close or calibrate the artificial North-South oriented canals
  • -calibrate the (semi-)natural West-East channels
  • -calibrate the lake entrances


  • From 3,400 km  of channels 329.5 km have been dragged, 8 canals closed and 5 sections calibrated
40
 
41
 
42
 ENCOUNTERED CONSTRAINTS
43
FUTURE PROSPECTIVES
44
PILOT PROJECT OF ECOLOGICAL RESTORATION
CALARASI – RAUL ISLET S=3,875HA
45
Objectives
  • Restore and preserve the specific biodiversity of the Calarasi-Raul Islet
  • Benefits for population in the area by increasing of the employment and the development of traditional activities: fishing, reed harvesting, wood cutting and tourism
46
RESULTS
  • GENERAL STRATEGY FOR ECOLOGICAL      REHABILITATION OF CALARASI-RAUL ISLET
  • COMPLET PROJECT FOR REHABILITATION OF
  •      CALARASI-RAUL PILOT AREA
  • IMPLEMENTATION PLAN
  • INVESTMENTS COST-PLAN
  • BIOLOGICAL AND HYDROLOGICAL MONITORING
47
 
48
RESULTS
  • BASEMENT STUDY TO PROMOTE IEZER-CALARASI AREA AS NATURAL RESERVE
  • MANAGEMENT PLAN OF CONSERVATION
  • ECOLOGICAL REHABILITATION PROGRAM
  • STRATEGIES FOR PUBLIC AWARNESS AND RESEARCH
  • IMPLEMENTATION PLAN
49