•After the Governorate of Port Said handed over the site to the project management, the following activities had taken place:
•Widening and leveling of the access rough road
•Evacuated the existing fish ponds from its polluted water
•Constructed an earth ring road around the site
•Conducted a geotechnical study and ground survey
•Implemented the conceptual design by TVA
•Finalized the detailed design by AAW