Lake Manzala Engineered Wetland Project




2005
•Monitoring
and evaluation phase started. Water was distributed according to the following
schedule:
•21,500 m3/day for five high speed free
surface cells
•3,000 m3/day for five low speed free
surface cells
•500 m3/day for two reciprocating
subsurface cells
•Measuring the concentration of the main pollutants: Total Nitrogen (TN), Total Phosphorous
(TP), Biological Oxygen Demand (BOD), Total Suspended Solids (TSS), Heavy Metals (HM), Total, and Fecal
Coliform (TC & FC), at the inlet and outlet of each cell to evaluate
the performance
of each.