Lake Manzala Engineered Wetland Project
Estimated Effluent Concentrations (mg/L)
1.2
3.9
10.3
12
Total N
2
1.4
3.4
4
Total P
8
4.8
8.4
32
TSS
2.4
6.8
19.3
24
BOD
Cells
Wetland
Wetland
Basin
Reciprocating
Low Flow
High Flow
Sediment
Parameter