DEMONSTRATION SITE SUMMARY SHEET
1.
SITE NAME AND GEOGRAPHICAL COORDINATES:

Cape Bolinao is located at 16.36 ­ 16.46oN and 119.83 ­ 119.97oE in the northwestern

Philippines (Luzon Island)
2.
COUNTRY/IES IN WHICH THE SITE IS LOCATED:
The
Philippines
3.
PROVINCE [IN WHICH THE SITE IS LOCATED:

Province of Pangasinan

Local government approval [yes or no] yes if yes then date December 10, 2003

Local government involvement [yes or no]: yes
Local government co financing [yes or no]: yes if yes then in cash or in kind?
In cash and in kind
4.
LINKAGE TO NATIONAL PRIORITIES, ACTION PLANS AND PROGRAMMES:
·
Cape Bolinao is included in the Philippine Biodiversity Conservation Priorities, a national
biodiversity strategy and action plan, with high level in the marine category under the South
China Sea biogeographic region due to its most extensively developed reef systems and
associated habitats.
·
The Municipality of Bolinao is the first local government unit in the Philippines that formulated
a municipal fishery ordinance, the Coastal Development Plan (CDP). In this approved and
published municipal ordinance, some parts of Cape Bolinao are declared and assigned as: (1)
fishery management zone, (2) multiple use zone including aquaculture/mariculture, (3) trade
and navigational zone, and (4) eco-tourism zone.
·
Cape Bolinao is one of the sampling sites of the Fisheries Resource Management Project
(FRMP) in the Lingayen Gulf that addresses the two critical and interconnected issues of
fisheries: (1) resource depletion and (2) persistent poverty among municipal fisherfolk. The
Project is designed to foster municipal fisherfolk's participation in resource management and
enhance government capability, both at the national and local levels, to fulfil its mandate to
manage the resources with legal basis under the Republic Act 8550 (RA 8550). Philippine
Fisheries Code of 1998 (RA 8550) aimed to provide the development, management and
conservation of the fisheries and aquatic resources, integrating all laws pertinent thereto, and
for other purposes.
·
Bolinao is among the municipalities bordering the Lingayen Gulf. In March 25, 1993, the
Lingayen Gulf was declared an environmentally critical area under Proclamation 156 signed
by the President. The proclamation aimed to unify efforts in protecting and preserving the
coastal resources of the gulf.

Central government involvement [yes or no] yes

Central government co-financing [yes or no] yes if yes then in cash or in kind? Both
5.
DATE OF NATIONAL TECHNICAL WORKING GROUP MEETING, WHICH

CONSIDERED THE PROPOSAL AND RECOMMENDATION:
June
25th, 2003
6.
NATIONAL FOCAL POINT AND/OR NATIONAL TECHNICAL FOCAL POINT

ENDORSEMENT AND/OR COMMENTS:


Comments:

Signature:

Name and Designation:

Dr. Gil S. Jacinto, Director, Marine Science Institute, University of the Philippines

National Technical Focal Point for Philippines

Date: 20th December 2003


1

7.
SITE DESCRIPTION (FULL DESCRIPTION AS APPENDIX 1 )

AREA
Cape Bolinao, NW Pangasinan covers about 23,320 hectares of land area. It is an integral part of the
Lingayen Gulf due to its most extensively developed reef system and associated habitats (McManus
et al. 1992; Rivera 1997). The estimated reef flat area is about 50 km2 wherein half of the area (~25
km2) is seagrass meadows.
ENVIRONMENT
Cape Bolinao (see the map in Appendix 1) is found on the northwestern tip of Pangasinan and is
surrounded by the most extensive coral reef in the Lingayen Gulf (Mc Manus et al., 1992). It is on the
western edge of Lingayen Gulf facing the South China Sea on the north and west and the
Caquiputan Strait on the east. Cape Bolinao has one major island, Santiago Island and several small
islands and atolls. Within the coral reef, the seagrass beds are patchy with an approximate area of
25km2 (Fortes, 1995).
The geology of the mainland part of Bolinao is basically limestone with its topsoil producing only
limited crops, thus agriculture provides only a limited contribution to the town's economy. Most of its
livelihood has been heavily dependent on the harvest from the marine environment (McManus et al.
1992). Bolinao has a distinct dry and wet season. The rainy period starts about early May and ends in
mid-October (Rollon 1998). The marine water (physico-chemical) profiles are: a) water quality ­ light
attenuation coefficients varied from clear to relatively turbid water (0.1 to 2.0 m-1), salinity ranges from
30-35 o/o, sedimentation flux 1.5-10 g dry weight (DW) m-2 hr-1 (depending on the site), average water
flow velocity > 9 cm s-1, and b) sediment condition ­ grain size composed of very coarse sand (~60-75
% DW), fine sand (20-30 % DW), very fine sand (~5-20 % DW), and silt (from negligible to ~5 % DW)
and organic matter ~5 % DW (Rollon 1998). The air temperature ranges from 32 to 35oC during
summer (April-May) and 26 to 28oC in July to August and January to February (colder, wet months).
HABITATS
Cape Bolinao is a fringing coral reef system where a significant portion of the reef flat area is occupied
by seagrasses. There are seven seagrass species recorded: Enhalus acoroides, Thalassia
hemprichii
, Cymodocea rotundata, C. serrulata, Halodule uninervis, Halophila ovalis, and Syringodium
isoetifolium
. T. hemprichii and E. acoroides are the two species dominated the seagrass beds. The
seagrass areas are identified as a critical habitat for economically-important rabbitfish (Siganus
fuscescens
) and sea urchin (Tripneustes gratilla). S. fuscescens juveniles migrate from open sea to
the seagrass areas to seek refuge and forage on the leaf blades of the different species of
seagrasses while T. gratilla remains within the bed to graze for food. Giant clam (Tridacnids) ocean
nurseries are also located in the seagrass meadows.
BIODIVERSITY
Aside from its rich coral reef and diverse species of seagrasses, Cape Bolinao is also home to a wide
variety of other marine species. The preliminary surveys have recorded species richness of target
groups including: holothurians (10 species), crustaceans (11 species), starfish (1 species) and
gastropods (149 species). On the other hand, turtles and giant clams (Tridacna gigas) have become
endangered in Cape Bolinao. A giant clam nursery was put up in response to this problem.
PRESENT USE
Based on the present uses, the coastal areas of Cape Bolinao are divided into four zones as
embodied in the Coastal Development Plan (CDP). These are: (1) fishery management zone for
sustenance fisherfolks, e.g. gleaning, hook and line, fish corral, netting, and push net fishing, (2)
multiple use zone including aquaculture/mariculture and fishing, (3) trade and navigational zone, and
(4) eco-tourism zone.

Out of the 30 barangays of Bolinao, 20 are found on coastal areas whom 22% of the total population
is engaged in fishing (Philreefs, 2005). Milkfish aquaculture in Bolinao has now become the major
source of income for its inhabitants. Although this practice has made Bolinao the largest producer of
milkfish (Chanos chanos), studies showed that major fish kills that happened in the area resulted from
the overpopulation of fish in the cages. On the other hand, tourism is also fast becoming popular in
Bolinao. A few new resorts have been developed in the coastal areas servicing both tourists and
locals throughout the year.



2

MANAGEMENT REGIME:
The Coastal Development Plan (CDP) of Cape Bolinao also provides protection to sustainably
manage the marine resources in addition to the different stakeholders responsible to the preservation
and enforcement of laws. These are: national agencies ­ Bureau of Fisheries and Aquatic Resources
through its Bantay-Dagat Program; LGU's-attached agencies/offices - Municipal Agriculture Office
(MAO) and Coastal Resource Management (CRM) Office; the University of the Philippines Marine
Science Institute (UPMSI) through the Phase II of the Community-based Coastal Resource
Management (CB-CRM) Project "Sustaining Management of Coastal Resources in Selected
Municipalities of Lingayen Gulf (SAGIP Lingayen Gulf)"; and people's organizations (POs) and non-
governmental organization (NGO).

8.
STAKEHOLDERS (SEE APPENDIX 2 FOR STAKEHOLDER INVOLVEMENT PLAN)
Stakeholder groups in Bolinao include:

· Fishers, gleaners, women and youth organizations that have formed themselves into peoples'
organizations (POs),
· Non-government organizations who have taken on the commitment to assist sustainable use and
development efforts in the locality,
· Local government units which have the mandate to responsibly govern the area and
· Representative offices of national government offices, and
· The Marine Science Institute of the University of the Philippines which maintains a Marine
Laboratory in the area.

Bolinao Municipal or Local Government Unit (LGU). The LGU have the responsibility to manage
and maintain ecological balance within their territorial jurisdictions. They are authorized to enforce
and implement pollution control laws and other laws on the protection of the environment, pursuant to
national policies and subject to the control and review of the Department of Environment and Natural
Resources. They are also responsible in the supervision and management of Municipal waters within
fifteen kilometres of the shoreline under the Philippine Fisheries Code of 1998.

The Municipal Government enforces all laws and ordinances relative to the governance of the
municipality, implement all approved policies, programs, projects, services and activities of the
municipality and issue such executive orders as are necessary for the proper enforcement and
execution of laws and ordinance. The Municipal Council as the Legislative Body of the municipality
enacts ordinances, approve resolutions and appropriate funds for the general welfare of the
municipality and its inhabitants. It is also responsible for the protection the environment and can
impose appropriate penalties for acts that endanger the environment.

Non-Governmental Organization (NGO). The NGO presently operating in the area is HARIBON
which is involved with community organisation, awareness rising, and livelihood development, and
has been involved with community-based coastal resource management in Bolinao in the past.


People's Organizations (POs). The PO membership comprises the group that is the most affected
by the methods and extent of local resource exploitation, to which activities of the project should be
directed. In Bolinao there are seven organizations under the federation of KAISA-KA (Kaisahan ng
mga Samahan Alay sa Kalikasan
or Federation of Organizations for the Environment) namely
SAMMABAL, SAPA, SAUDI, FEDELA in the mainland and SAMMAKA, SAMMABI and SMMV in the
island. The most active organizations up to this date are SAMMABAL and SAMMAKA who up to this
date are maintaining the management of a marine protected area and mangrove reforestation
projects, respectively.

Fisheries and Aquatic Resources Management Councils (FARMCs). To institutionalise the major
role of the fisherfolk and other resource users in the planning and formulation of policies and
programs for the management, conservation, protection and sustainable development of fisheries and
aquatic resources, FARMCs were established at the National level and in all municipalities/ cities
abutting municipal waters.





3

At the municipal level, the Municipal Fisheries and Aquatic Resources Management Council are
formed by fisher folk organizations/ cooperatives and NGOs in the locality assisted by the Local
Government Unit (LGU) and other government entities. MFARMC of Bolinao is therefore
composed of members of people's organization, local government officials and other concerned
stakeholders. It regularly coordinates with both the executive and the legislative departments of the
Municipal Government and is actively involved with the formulation of community development
programs and implementing rules and regulations.

Department of Environment and Natural Resources (DENR). DENR has mandates, authorities
and responsibilities for the environmental protection and conservation of protected areas. DENR's
mandate includes the conservation, management, development and proper use of the country's
environment and natural resources (specifically forest and grazing lands, mineral resources,
reservations and watershed areas, and lands of public domain), and for the licensing and regulation
of all natural resources (as provided for by law) to ensure equitable sharing of benefits derived for the
welfare of present and future generations of Filipinos. Mangrove forests and marine protected areas
are the only coastal habitats that fall within the jurisdiction of DENR. DENR has been instrumental in
providing financial support to various people's organizations in the Lingayen Gulf. An example is the
mangrove reforestation under the DENR program "Community-Based Mangrove Forest Stewardship
Agreement (CBMFSA)".


Bureau of Fisheries and Aquatic Resources (BFAR). The Bureau of Fisheries and Aquatic
Resources (BFAR) has been reconstituted as a line bureau under the Department of Agriculture (DA)
pursuant to Republic Act No. 8550 (also known as the Fisheries Code of 1998). The BFAR is tasked
to prepare and implement a Comprehensive National Fisheries Industry Plan to ensure the rational
and sustainable development, management and conservation of the fishery and aquatic resources in
the Philippines waters including the EEZ and adjacent high seas. As a policy making body, BFAR is
authorized to enforce laws and regulations (including the issuance of licenses for commercial fishing
vessels) and formulate development and management policies on fisheries, except in municipal
waters, in consultation with the national and local FARMC and LGUs. The Bureau also leads in the
generation and verification of various technologies on fisheries production and processing as well as
the transfer of these matured technologies to the clientele.

Department of Tourism. The Department of Tourism (DOT) is the primary government agency
charged with the responsibility to encourage, promote, and develop tourism as a major socio-
economic activity to generate foreign currency and employment and to spread the benefits of tourism
to both the private and public sector. Tourism in Bolinao remains a strong area for further
investments.


The University of the Philippines Marine Science Institute (UPMSI). Since the start of its
operation in the area in the 80's, the UPMSI has conducted research on the flora, fauna, and coastal
oceanography in the area. The results of these research studies have helped improve local and
national understanding of the marine biodiversity in the locality and in the country. Since then, the
laboratory has become a haven of research interests, which attracted local, national and international
funding. With its growing popularity in the scientific circles, its emphasis has expanded from basic
marine scientific research to fields dealing with environmental management and protection. With this
development came a strong commitment to address marine environmental issues. The UPMSI is now
the `environmental watchdog' especially in the northern part of the Philippines.

9. THREATS
(CAUSAL CHAIN ANALYSIS AS APPENDIX 3)

Pollution
At present, the coastal areas of Bolinao have no solid waste management plan. Solid waste is
commonly dumped along the coast for reclamation.
Aside from household trash the major pollutants in the sea off Bolinao come from aquaculture
production. The semi intensive fishponds development that peaked in the 1980's resulted in rampant
cutting of mangrove for fishpond conversion. Destruction of this mangrove buffer opens the bay to
runoff water and consequently siltation. Fish cages and pens also contribute much to the pollution
because of excessive use of artificial feeds. According to the studies siltation increased about 4
centimeters per year in the area. Other effects of fish farming are discussed below

4

Following a massive fish kill as a result of red tide, tons and tons of dead fish were dumped in the
sea, contributing greatly to the pollution of the water. It took several months of dredging and water
splashing to restore reasonable water quality.

Push Net Fishing
A very common gear used by fishermen in catching Siganid juveniles in seagrass beds is the push
net. This results in the dredging and cutting of seagrass and eventually fish depletion. Other species
caught in the nets are often discarded, as they have no commercial value.

Trampling
Human activities such as push nets, gleaning, fishing, boat scouring, and anchorage resulted to loss
and degradation of seagrass beds, as the seagrass shoots are trampled under foot, pulled out by
their roots, or otherwise damaged.

Fish Cage Culture
Aquaculture through semi-intensive milkfish fishponds started in the Lingayen Gulf in the early 1970s,
and then peaked in the 1980s following extensive conversion of mangrove areas into fishponds.
With the ban in mangrove cutting enforced in 1995, bangus (milkfish, Chanos chanos) culture
eventually expanded into the coastal waters and rivers using floating cages.
Although this intensive aquaculture has made Bolinao the biggest producer of C. chanos (milkfish) in
the province and the third in the country, it has corresponding negative impacts. Studies have
supported the findings that the fish kill episodes are mainly due to the overpopulation of fish
occupying the cages, causing excessive eutrophication, leading to a decrease in the water's oxygen
content, resulting in fish deaths. Scientific reports also show the occurrences of "algal blooms" which
coincided with such events. A Prorocentrum minimum bloom was discovered by Azanza et al. during
the January-February 2002 major fish kill in Bolinao. The most recent fish kill occurring between May
12-20 of this year coincided with an increased cell count of Chatonella marina algae. Villanueva
reported that dead fish varied from an average of 25,000 to 35,000 bangus for each cage aged 3
months old to harvestable stocks or more than 50% of the stocking density for each cage.
With the advent of higher demand for food due to increasing population, units of fish pens and cages
in Bolinao more than doubled the allowable limit of 554 units, which was determined to be the
maximum carrying capacity.
The Causal Chain Analysis indicated the interventions to address threats to Bolinao Seagrass as
follows:
-
Provide resource data and information for the development of Management Plan
-
Formulate and implement municipal ordinance on seagrasses as resource and habitat
-
Design and disseminate information and education campaign
-
Enhance stakeholders' capacity for resource management
-
Develop and implement supplemental/alternative livelihood programme
10.
GOALS AND PURPOSE:
The project recognizes the ecological and economic roles of seagrasses in Bolinao, and that the
maintenance of their ecology and integrity will, in both the long and short term contribute to uplifting
the lives of the citizens of this municipality. It also recognizes that sustained efforts in this direction
should involve local participation and initiatives. The project aims to establish functional linkages
between and among community groups, academic institutions, with local and national government
support, so that the seagrass ecosystems that form the resource base of local livelihoods will be
enhanced, protected and managed. In addition, it will preserve the biodiversity in the seagrass
meadows, marine fauna and flora alike, restore the degraded areas, and reduced threats and provide
preventive actions to these threats.

11. RATIONALE AND OBJECTIVES:

The seagrass beds of Cape Bolinao form the base of fishery resources for 35 barangays (a Philippine
political unit). As apparent in section 9, the seagrass beds of Bolinao are seriously threatened through
the direct and indirect effects of human settlement and coastal development leading to intense
pressure and anthropogenic disturbances to the said habitat.

5

There is real need to take initiatives to protect, conserve and maintain the resources. Seagrass beds
play a very important role in the community since many of their livelihoods rely heavily on the
seagrass beds. At present, most people in the community understand that the existing resource
provides their livelihood. But the importance of linkage of seagrass beds with the other two major
components of the marine ecosystem, mangroves and coral reefs, is not seriously considered.
Experience from other community-based initiatives shows that self-management of local resources is
sustained and effective if user-communities take on ownership of management activities.
The objectives of the project are:
· To enhance resource management, particularly for seagrasses based on comprehensive data
and information;
· To intensify and increase public awareness through information, education and communication
campaign;
· To strengthen stakeholders' capacity in management of resources; and
· To design and implement alternative/supplemental livelihood program.

12. OUTCOMES

With the implementation of the seagrass demonstration site in Bolinao, the following management
outcomes are expected:
· A functional linkage among stakeholders;
· Increased public awareness;
· Strengthened capacity building among stakeholders;
· Improved legislation and enforcement practices from project recommendations
· Community establishment of protected sites;
· Sustained monitoring through the Seagrass Watch;
· Improved seagrass cover and maintenance of biodiversity;
· Developed and improved livelihood skills of coastal communities to protect and manage seagrass
and related reef resources.

13.
PROPOSED ACTIVITIES TO ACHIEVE OUTCOME (MONITORING AND EVALUATION
PLAN AS APPENDIX 4)

COMPONENT 1.
Development and Implementation of Management Plan Based on
Comprehensive Data and Information
In order to address the first objective, which is the development and implementation of management
plan based on comprehensive data and legislation, resource assessment, database establishment,
and municipal ordinance preparation must be conducted. Seagrass resources shall be assessed to
identify and map seagrass areas by the management board and the stakeholders. Software shall be
formulated and designed for the database establishment, wherein the collected data shall be collated
and analysed for management purposes. Municipal ordinance shall be prepared based on the
participatory processes: review of existing municipal fisheries laws, drafting of the ordinance,
consultation, presentation, and validation of the drafted ordinance to the stakeholders, and approval
and the publication of the said approved ordinance. After the resource assessment and consultation,
a detailed pilot plan shall be outlined and implemented with the different stakeholders. In addition,
three permanent areas shall be identified as the pilot plan implementation and SeagrassWatch
monitoring sites. Two evaluations on the resource and socio-economic impact of the management
plan shall be conducted throughout the duration of the project.

COMPONENT 2.
Information and Education Campaign
To minimize the lack of public involvement and absence of environmental education and information,
the demo site project shall provide data and materials on the management of seagrass resources. A
survey and assessment of the current seagrass knowledge shall be conducted through focus group
discussion prior to the determination of appropriate information dissemination strategies. Meeting with
the municipal council and other stakeholders shall be held to prepare the general IEC plan approach
and implement the said plan. This component of the project will provide information and education
campaign materials to the youth, people's organization, legislative bodies and other stakeholders
interested with it. Assessment of the influence of the IEC plan to the public awareness and
participation shall be conducted in the mid and end of the project.

6

COMPONENT 3. Capacity Building
Building the capacity of the locals such as people's organization in the area, students, environmental
managers, and other through trainings and workshops for the efficient and proper management
coastal resources shall be part of the demo site project to increase public participation, enhance
management capability, and ensure the continuity of this management approach after the completion
of the project via knowledge and skill transfer. Trainings on the seagrass taxonomy and associated
marine flora and fauna and measurement of biological parameters for the monitoring will cater to the
youth, POs, in- and out-of school youth, environmental managers, and other stakeholders. Legal and
paralegal training is for the police, bantay-dagat, fisherfolks, legislative bodies, and other interested
persons. Solid waste management and SeagrassWatch approach are for resource managers,
barangay councils and student. Experts on the different fields as mentioned above shall be invited as
consultant and/or resource speaker for these trainings. In addition, group study tour shall be carried
out to the newly-operated and successful marine protected areas (MPAs) where the major marine
habitats are seagrass areas. Upon completion of the project, the municipality of Bolinao will have
trained and well-informed people who will actively involved and participate to decision-making and
seagrass protection and conservation.

COMPONENT 4. Sustainable Alternative Livelihood Program
A survey of the extant skills and strategies shall be the pre-implementation activity in designing the
necessary livelihood assistance strategies. Consultation with the local people, meetings with the
concerned government agencies, and seeking the sustainable alternative livelihood using land- and
water-based approach such as seaweed culture, handicrafts and gardening shall be conducted.
Initially, the livelihood program will have pilot testing to the 20 families to the three identified sites. In
the case of success, this will be duplicated to other seagrass sites, depending on the availability of
funds and feasibility to other sites. A consultant and research assistant shall be hired to conduct
meeting, training, prepare the needed materials and implement the identified and developed
alternative livelihood approach to the pilot sites.

14.
SUSTAINABILITY ANALYSIS AND RISK ASSESSMENT

Sustainability

It is very important that prior to project implementation, the stakeholders are well informed of the
project's objectives and framework to get their full commitment and support to the project. The roles
of the stakeholders must be delineated but complementary for them to work as a team to ensure the
successful implementation of the project. The activities to be implemented must be well coordinated
and must cater to the needs of the local community. The resources in terms of manpower, facilities,
and funds are assumed available, sufficient and properly managed. To sustain the project,
complementation and counter-parting schemes must be developed among the various stakeholders in
Bolinao.

It is vital that fisher folk or the residents in Bolinao are well organized and involved in the project since
they will be given the primary role of protecting their own resources and habitat. The capability-
building component of the project is expected to upgrade the capability and knowledge of the
stakeholders, particularly the private sector. Continuous upgrading will help increase the private
sector's efficiency and effectiveness in performing their community responsibilities. The existing
seven people's organizations in Bolinao must take an active role in the project and must work
harmoniously to ensure the success of the project. The establishment of seagrass watch composed
of volunteers from the local community will be vital in the project since this really focuses on the
protection and management of seagrass in Bolinao.

Therefore, for continuity of the project, the operation and management of the project will be turned
over to the local government of Bolinao. It will also be responsible for establishing linkages and
networking of the various organizations/sectors involved in seagrass undertakings. However, UP-MSI
will continue to monitor the progress of the project while the national and local government agencies
continuously enforce appropriate laws and render technical assistance when needed

With funding from UNEP/GEF and additional financial support from the stakeholders, there is no
doubt that the project can be a successful one and will be financially sustainable.


7

Based on the memorandum of understanding, the funds of the project will be transferred and
managed by the UP MSI. UP MSI will undertake to execute the activities at the Cape Bolinao
seagrass demonstration site as approved in the business plan for the site, being developed by the
National Seagrass Committee in conjunction with the Project Coordinating Unit. Limited personnel will
be hired and trained for the project. Project management strategies will be designed and studied.
Implementing agencies will ensure that the activities and finances of the project will be managed
properly.

Risks

Political Risk
From previous experiences it's very clear that political will must be there to accomplish the project
activities successfully. It is a key condition in fact. Although substantial successes may be achieved at
the levels that POs and NGOs operate, at the end the biggest impact is obtained if the legally
mandated agency, i.e. the municipal government is supportive and involved.

The clearest signs of ability and commitment that an LGU can give are:
· Proof of past initiatives and pro-active attitude in coastal resource management;
· Allocation of resources (funds and manpower) for coastal resource management in the annual
budget.

Donor driven projects often suffer from government agencies "committing" for the sake of acquiring
the projects and its funds. All too often active participation during project implementation has been too
low to speak of ownership and actual commitment. But since the project include the active
participation of all the stakeholders including the community; the project is assured to be sustained as
indicated to the output of the project activities.

Social and economic risks
This project contributes to a shift in the paradigm of the fisher folk's view on seagrass habitat. Please
state the current view of fisherfolks on seagrass. The past has shown that this is not without risk. In
one barangay ten people were killed because of addressing illegal fishing practices. Changes always
face resistance, but when food security and basic income are touched, emotional tensions can
escalate into violence. This would greatly diminish project impact and the potentials of success.
Caution should be taken at all times. The legal aspects in this project are to secure safety and justice.

With respect to livelihood, initiatives will be aimed at financially and environmentally viable enterprises
that will need the leverage of buy-in from other investors to make a difference. If not, any new
initiative will only marginally contribute to livelihood. Due attention should be paid to marketing
products beyond municipal boundaries. The mid-term review should critically evaluate progress made
in this respect.

With emphasis given to the strengthening of information, education campaign on the importance of
seagrass ecology and its management scheme, the social and economic risks will be minimized due
to the conservation, wise utilization and proper disposition and enforcement of related laws and
regulations.

Natural risks
Natural risks are maybe the most acceptable ones, as they can't be helped, but can nevertheless be
very destructive. Over the years, the following natural threats have been faced:

El Niņo has caused great damage, through warm sea currents that passed the Philippines, bleaching
the coral reefs. While this is only an intermittent phenomenon, global climate change is probably more
worrisome. If sea temperatures continue to rise, many reefs, being extremely sensitive to temperature
changes, will die. This would imply the loss of habitat for many marine species that would also die.
This risk cannot be avoided, except through global interventions. Philippines can of course do its
share.



8

Another natural calamity, which the Lingayen Gulf region is subject to, is typhoons. They frequently
occur and super typhoons can be especially damaging. Fish pens and cages are affected, causing
great economic losses. Even young mangroves planted were lost after typhoons struck. Although this
can never be fully prevented, great care should be taken that the trees are planted in the right season.
It has happened more than once, even during the predecessor of this project, that seedlings were
planted late and too close to the typhoon season.

Project management risks
This project is politically loaded. UPMSI, as a research institute, definitely does not have politics as its
main interest, although it continuously moves in political waters. It has the capability to address
political concerns, precisely because it is known to be an objective and knowledgeable institute. Yet,
project staff will have to be well equipped to face and deal with politics in appropriate manners and
pay sufficient attention to issues that are politics-based. The risk for MSI is that it might get too
politically involved. It will have to find its balance in accomplishing its (project) mission.

Another risk factor is the qualifications of the project staff. Since the existing manpower at MSI is
already overextended, additional staffs to occupy the full-time positions are required. Qualified staff is
hard to find but is a crucial factor for success. Due to the long gap between the previous project and
this project, most of the previous staff has left for other organizations. Critical functions are the senior
project manager and mid-level technical specialists. At least 3 months must be allowed between
project approval and field deployment for staff recruitment, selection, orientation and training.

15.
ESTIMATED BUDGET:

Total estimated budget of the demonstration site project including

GEF
funding:
$US
134,770.00

Government co-funding in kind:
$US 163,350.00

Government co-funding in cash:
$US 4,050.00
Total
estimated
budget
$US
302,170.00



15.1 Summary Budget by Activities (
Details described in Appendix 5.1).

Sub-component or activities
Co-funding
Budget in US$)
Total
GEF
in kind
in cash
1 Development and Implementation of Management




Plan Based on Comprehensive Data and Information
1.1 Resource assessment
2,340.00 - - 2,340.00
1.2 Database Establishment
3,200.00 - - 3,200.00
1.3 Preparation of Municipal Ordinances
2,300.00 2,300.00 1,200.00 5,800.00
1.4 Survey for Pilot Site Planning
1,640.00 - - 1,640.00
1.5 Consultation meeting for designing of pilot site
1,600.00 400.00 - 2,000.00
1.6 Implementation of Pilot Site
2,400.00 72,000.00 - 74,400.00
1.7 Assessment of socio-economic impact of Municipal
3,400.00 - - 3,400.00
Ordinance
1.8 Implementation of SeagrassWatch
8,340.00 - - 8,340.00
2 Information Education Campaign




2.1 Information campaign for seagrasses
9,100.00 1,000.00 1,000.00 11,100.00
3 Capacity
Building




3.1 Training on seagrass taxonomy and resource assessment 4,500.00 6,000.00 - 10,500.00
3.2 Legal and Paralegal Training
1,000.00 200.00 - 1,200.00
3.3 Training for Seagrass Watch
3,100.00 600.00 - 3,700.00
3.4 Group training
2,500.00 200.00 - 2,700.00
4 Livelihood
Skills




4.1 Piloting of one (1) livelihood approach
12,600.00 900.00 500.00 14,000.00

9

Sub-component or activities
Co-funding
Budget in US$)
Total
GEF
in kind
in cash
5 Project Management




5.1 Operation of Management Board
48,800.00 22,650.00 150.00 71,600.00
5.2 Establishment of project office
11,300.00 24,000.00 1,200.00 36,500.00
5.3 Periodic meetings and reporting
9,550.00 17,900.00 - 27,450.00
5.4 Annual audit
600.00 15,000.00 - 15,600.00
5.5 Evaluation at mid term and end of GEF funded phase of 5,000.00 - - 5,000.00
project by independent regional expert
5.6 Exit strategy through workshop
1,500.00 200.00 - 1,700.00
Grand Total
134,770.00 163,350.00 4,050.00 302,170.00

15.1 Summary Budget by Objects of Expenditure (Details described in Appendix 5.2).

Co-funding
Object of Expenditure
GEF
Total
In cash
In kind
1000 Project Personnel Component
59,750.00 114,600.00
174,350.00
1100 Project Personnel
49,250.00 93,000.00
142,250.00
1200 Consultants
9,500.00
21,600.00
31,100.00
1600 Travel on official business
1,000.00

1,000.00
2000 Sub-contract Component
18,820.00
18,820.00
2200 Sub-contract component
18,820.00

18,820.00
3000 Training Component
32,000.00
2,150.00
24,750.00
58,900.00
3200 Group Trainings/ Workshops 15,100.00 1,400.00
16,500.00
3300 Meetings/ Conferences
16,900.00
2,150.00
23,350.00
42,400.00
4000 Equipment Component
8,900.00
1,200.00
24,000.00
34,100.00
4100 Expendable Equipment
2,000.00

2,000.00
4200 Non-expendable equipment
6,100.00
400.00
6,500.00
4300 Premises
800.00
800.00
24,000.00
25,600.00
5000 Miscellaneous Component
15,300.00
700.00
0.00
16,000.00
5100 Operation and maintenance of equipment
800.00

800.00
5200 Reporting cost
7,100.00
700.00
7,800.00
5300 Sundry
1,600.00

1,600.00
5500 Evaluation
5,800.00

5,800.00
Grand Total
134,770.00
4,050.00
163,350.00
302,170.00


16.
IMPLEMENTATION PLAN

2005
2006 2007
Components / Activities
Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
1
Development and Implementation of Management Plan Based
on Comprehensive Data and Information











1.1
Resource assessment










1.1.1 Subcontract to do survey of species and density (5
persons*7days*50)










1.1.2 Boat Rental (7days*20)










1.1.3 Diving equipment rental (7days*5sets*10)










1.1.4 Field materials










1.1.5 Transportation Expenses (5persons*20)










1.1.6 Meeting to identify seagrass areas (20 persons*1 day*10)










1.1.7 Mapping of seagrass areas (validation from existing references
and field surveys) (1 consultant*500)











10

2005
2006 2007
Components / Activities
Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
1.2 Database
Establishment










1.2.1 Database formulation design (1 consultant 5wm at 500/mo)










1.2.2 Data gathering










1.2.3 Database establishment










1.2.4 Training on database application (10 persons*1 day*20)










1.2.5 Printing and distribution of compiled seagrass data (in CDs, papers
published, area summaries) 200 copies*10










1.3
Preparation of Municipal Ordinances










1.3.1 Meeting for drafting of Municipal Ordinance (10 persons*70)










1.3.2 Meeting for review and consultation (2 days*100 persons*20) half
will be shouldered by LGU










1.3.3 Rental of meeting venue (1 day* 200)










1.3.4 Prioritisation/ identification of areas for particular uses (fish
enhancement, research, conservation, multiple use)










1.3.5 Meeting to generate stakeholder interest and partnership (1day*50
persons*30)










1.3.6 Transportation expenses for meeting participants(50 persons*10)









1.3.7 Rental of meeting venue (1 day* 200)










1.3.8 Meeting for approval of Municipal Ordinances (1 day*10
persons*70)










1.3.9 Publication of approved Municipal Ordinances (7days publication
in local newspaper*100/day)










1.4
Survey for Pilot Site Planning










1.4.1 Detailed survey of the pilot sites (5 persons*7days*50)










1.4.2 Boat Rental (7 days*20/day)










1.4.3 Diving equipment rental (7days*5sets*10)










1.4.4 Field materials










1.4.5 Transportation Expenses (5persons*20)










1.5
Consultation meeting for designing of pilot site










1.5.1 Consultation meeting for zoning, mapping and associated activities
agreed upon (30 persons*1 day*20/day)










1.5.2 Rental of meeting venue (1 day* 200)










1.5.3 Development of regulation for 3 pilot sites (1 consultant
1wm*500/mo)










1.5.4 Meeting for consultation and approval of regulations (1 day*50
persons*10/day)










1.5.5 Rental of meeting venue (1 day* 200)










1.6
Implementation of Pilot Site










1.6.1 Training and mobilization of local police and Bantay Dagat on
enforcement of regulation in pilot sites (30 persons*30/day*1 day)









1.6.2 Co-funding for Bantay Dagat membership (24wm/30
persons/100/mo)










1.6.3 One environmental lawyer as consultant (3wm at 500/mo)










1.7
Assessment of socio-economic impact of Municipal
Ordinance











1.7.1 One consultant 2wm at 500/mo










1.7.2 Meeting for assessment of socio-economic impact (1 day* 50
persons*30/day* 2 assessments)











11


2005
2006 2007
Components / Activities
Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
1.8
Implementation of Seagrass Watch










1.8.1 Meeting for establishment permanent sampling/ monitoring sites
(1day*15 persons*20/day)










1.8.2 Monitoring of seagrass demo site using SG watch method (4
days*10 persons*30* 8 samplings)










1.8.3 Boat Rental (4 days*20/day*8 samplings*2 boats)










1.8.4 Diving equipment rental (4 days*5sets*10*8 samplings)










1.8.5 Field materials (600/ kit* 3 sites*2)










2
Information Education Campaign

2.1
Information campaign for seagrasses










2.1.1 Pre-implementation survey and assessment of current seagrass
knowledge and determination of appropriate strategies through
focus group discussion (5 days*60 persons*10)










2.1.2 One IEC consultant to prepare all information campaign materials
(3wm at 500/mo)










2.1.3 One Research Assistant to work with IEC Consultant (3wm at
300/mo)










2.1.4 Development of IEC materials ( brochures 200 copies*4/copy;
posters 200 copies*2/copy; booklet-type materials 200
copies*7/copy; digital materials 200 copies*2/copy)










2.1.5 Media delivery (local radio and newspaper)










2.1.6 Transportation expenses for distribution of IEC materials










2.1.7 Consultation on impact evaluation of IEC (1 day* 50
persons*20/day* 2 assessments)










3
Capacity Building

3.1
Training on seagrass taxonomy and resource assessment










3.1.1 Workshop on seagrass taxonomy, bio-parameter measurement
and associated marine plants and fauna (3 days*50
persons*25/day)









3.1.2 Workshop materials










3.1.3 Rental of workshop venue (3 days*200/day)










3.1.4 Transportation expenses for fieldwork (5 boats*1 day*20/day)










3.1.5 Experts to develop training strategies and to train the participants
(3 persons*4days*150)










3.2
Legal and Paralegal Training










3.2.1 Training on Proper Implementation of Municipal Ordinances (30
persons*1 day*20/day)










3.2.2 Lecturers to develop training strategies on legal and paralegal and
to train the participants (2 days*1person*300)










3.2.3 Rental of meeting venue (1 day* 200)










3.3
Training for Seagrass Watch










3.3.1 Preparation of materials to introduce seagrass watch concept










3.3.2 Membership campaign through ads and radio (7 days
announcement)










3.3.3 Co-funding for community coordinators to spearhead seagrass
watch (5 coordinators*100/person*12wm)










3.3.4 Training on seagrass watch methods for volunteers (30 persons*2
days*20/day)










3.3.5 Lecturer to train the participants (1 consultant*600)











12


2005
2006 2007
Components / Activities
Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
3.4
Group training










3.4.1 Training on solid waste management (1 day*30 persons*20/day)









3.4.2 Lecturer to train the participants (1 consultant*600)










3.4.3 Rental of training venue (1 day*200/day)










3.4.4 Study tours to MPAs with seagrass meadows as major component
(15 participants*20/day*2days)










4
Livelihood Skills

4.1
Piloting of one (1) livelihood approach










4.1.1 One research assistant to do survey of extant skills and strategies
(4wm*200/mo)










4.1.2 Consultant to develop livelihood strategies and train the
participants (4wm*500/mo)










4.1.3 Printing of manuals on sustainable resource-based livelihoods
(200copies*4/copy)










4.1.4 Training on alternative and resource-based livelihood (60
persons*2 days*15/day)










4.1.5 Rental of training venue (2days*200/day)










4.1.6 Implementation of alternative livelihood
(60
households*200)





4.1.7 Livelihood
participatory
assessment

5
Project Management

5.1
Operation of Management Board










5.1.1 Meeting for the establishment of management board (1 day
accommodation*15 persons*20/day; half of the expenses to be
shouldered by LGU)










5.1.2 Co-funding for meeting participation (15persons*70)










5.1.3 Co-funding for experts from MSI to act as consultant to the
management board (3 consultants*12 mos*600/mo)










5.1.4 Transportation expenses for participants coming from Manila (5
persons*20/person)










5.1.5 Demonstration Site Manager (825/mo*30 mos)










5.1.6 Travel expenses of Demo Manager (10 trips*100)










5.1.7 Technical Assistant (380/mo*30 mos)










5.1.8 Community Coordinator (380/mo*30 mos)










5.2
Establishment of project office










5.2.1 Co-funding for rental of office space (30 mos*400/mo)










5.2.2 Co-funding for rental of laboratory space (30 mos*400/mo)










5.2.3 Repair and maintenance of office and laboratory premises (half will
be shouldered by MSI)










5.2.4 Office furnitures (half will be shouldered by MSI)










5.2.5 One unit desktop computer with printer and scanner










5.2.6 One unit LCD projector and projection screen










5.2.7 One unit digital camera with underwater casing










5.2.8 One unit GPS










5.2.9 Repair and maintenance of office equipment and computer










5.2.10 Communication expenses for day to day office management










5.2.11 Postage and freight










5.2.12 Office supplies











13


2005
2006 2007
Components / Activities
Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
5.3
Periodic meetings and reporting










5.3.1 Quarterly meetings of the Management Board (1 day
accommodation*15 persons*10 meetings*20/day/person)










5.3.2 Co-funding for meeting participation of members of the board
(70/meeting*15 persons*10 meetings)










5.3.3 Rental of meeting venue (200/day*10 meetings)










5.3.4 Transportation expenses of members from Manila (5
persons*20/person*10 meetings)










5.3.5 Half year meeting of the National Committee (1 day
accommodation*12 persons*5 meetings*40/person)










5.3.6 Co-funding from meeting of committee members (12
persons*70/meeting/5 meetings)










5.3.7 Rental of meeting venue (200/day*5 meetings)










5.3.8 Transportation expenses for members from outside Manila (3
persons*150/ person*5)










5.3.9 End of GEF funding period stakeholder consultation (30 persons*1
day*20/day)










5.3.10 Transportation expenses for participants from Manila (5
persons*20/ person)










5.3.11 Rental
of
meeting
venue
(200/day*1day)

5.3.12 Print and submit final project summary report to PCU, including
financial statements (50 copies*4/copy)










5.4
Annual audit










5.4.1 Auditor's fee (200/year*3 years)










5.4.2 Finance officer to manage the project funds (30wm*500/mo)










5.5
Evaluation at mid term and end of GEF funded phase of
project by independent regional expert











5.6
Exit strategy through workshop










5.6.1 Consultant to prepare document for the workshop
(1consultant*500)










5.6.2 Meeting workshop on turning over of responsibility/ resource
management to stakeholders (30 persons*2 days*30/day)










5.6.3 Transportation expenses for participants from Manila (5
persons*20/
person)

5.6.4 Rental
of
meeting
venue
(200/day*1day)



17.

PROPOSED MANAGEMENT OF THE ACTIVITIES (ARRANGEMENT FOR MANAGEMENT
AND COORDINATION AS APPENDIX 6)


A Demonstration Site Manager will be hired to manage day to day activities of the project. A
Management Board will be formed to supervise the Demonstration Site Manager together with
the National Seagrass Committee. The National Technical Working Group will continue to
supervise the over-all implementation of the demonstration site and coordinate among
components.


14

Figure 1
Diagram of Proposed Management of Demonstration Site Activities.


PSC



RSTC




RWG-S
PCU




SEA-S

LGU Bolinao


Management Board
People's Organization




Site Manager



Sub-contract
Sub-contract
Sub-contract




18.

INFORMATION ON PROPOSED EXECUTING AGENCY/IES

MARINE SCIENCE INSTITUTE, UNIVERSITY OF THE PHILIPPINES

Mandate
The Marine Science Institute seeks to achieve the following objectives:
· To generate basic information necessary for optimal and sustained utilization, management, and
conservation of the marine environment and its resources.
· To provide graduate-level training and extension services to develop human resource
requirements in the marine sciences.
· To develop appropriate and environmentally-sound marine-based technologies for industrial and
economic development.

History
The University of the Philippines Marine Science Institute (UPMSI) was originally established as the
Marine Sciences Center (MSC) with the approval of its charter by the Board of Regents on 28 March
1974. MSC served as the University's coordinating base for marine research. In June of the same
year, the first Advisory Executive Council of the Center was formed with the appointment of Dr.
Edgardo D. Gomez as acting Director.

The Center commenced its operations in February 1975 at the building of the U.P. Natural Sciences
Research Institute. With its transformation into an institute on 23 April 1985, MSI began offering
graduate programs.

It is now tasked to pursue research, teaching, and extension work in marine biology, marine
chemistry, physical oceanography, marine geology, and related disciplines.

Performance
in the last 26 years, UPMSI has grown from a complement of less than 10 to about 150 personnel, the
majority of whom are professional staffs. Through the years, UPMSI has made a significant
contribution to tropical marine science. In 1995, MSI had 1.0 international refereed publication per
PhD per year, the highest among academic institutions in the country. At the national level, these

15

contributions form the bases of policies that guide the research and development programs of the
country. In recognition of its achievements in research and instruction, the Institute has received
numerous awards from both government and private organizations. On 15 December 1994, UPMSI
was designated the "National Center of Excellence in the Marine Sciences" by Presidential
Proclamation No.518.
Linkages
UPMSI undertakes collaborative research with local, national, and international agencies. UPMSI, for
example, has served as a major implementing agency in various ASEAN marine science programs.
UPMSI is also represented in a number of national and international committees and organizations
concerned with marine resources and the marine environment. Many of the staffs are members of
professional organizations and editorial boards of local and international journal.


19.
EXECUTING AGENCY CONTACT PERSON/S:

MS. TUTU B. ALMONTE
Demonstration Site Manager
Seagrass Laboratory, Marine Science Institute
University of the Philippines
Diliman 1101, Quezon City
PHILIPPINES
Tel. No. 632 9205301 local 7414
Fax: 632 9247678

MARCO NEMESIO E. MONTAŅO, Ph.D
National Focal Point
Seagrass Laboratory, Marine Science Institute
University of the Philippines
Diliman 1101, Quezon City
PHILIPPINES
Tel. No. 632 9205301 local 7414
Fax: 632 9247678


16

APPENDIX 1 FULL SITE CHARACTERIZATION

1.1

Site description

AREA:
Bolinao has 23,320 hectares of land area. It is subdivided into the following:
47.13% agricultural, built-up area 2.02%, infrastructure/institutional 10.84%, pasture land 11.07%,
forest area 8.09%, fishpond 2.74%, brushland and open range 16.25%, and rivers and creeks 1.85%.

ENVIRONMENT
: Cape Bolinao, Pangasinan is located in the northwestern Philippines and is an
integral part of the Lingayen Gulf (McManus et al. 1992; Rivera 1997). The geology of the mainland
part of Bolinao is basically limestone with its topsoil producing only limited crops, thus agriculture
provides only a limited contribution to the town's economy. Most of its livelihood has been heavily
dependent on the harvest from the marine environment (McManus et al. 1992). Bolinao has a distinct
dry and wet season. The rainy period starts about early May and ends in mid-October (Rollon 1998).
Furthermore, the marine water (physico-chemical) profiles are: water quality ­ light attenuation
coefficients varied from clear to relatively turbid water (0.1 to 2.0 m-1), temperature range is 32-35 oC
during summer months (April-May) while falling to 26-28 oC in July to August and January to
February, salinity ranges from 30-35 o/o, sedimentation flux 1.5-10 g dry weight (DW) m-2 hr-1
(depending on the site), average water flow velocity > 9 cm s-1, and b) sediment condition ­ grain size
composed of very coarse sand (~60-75 % DW), fine sand (20-30 % DW), very fine sand (~5-20 %
DW), and silt (from negligible to ~5 % DW) and organic matter ~5 % DW (Rollon 1998).

HABITAT(S): The Bolinao area is a fringing coral reef system, also containing mangrove areas and
extensive seagrass beds. About 37 km2 of the 50 km2 of the total reef flat area are covered by
seagrasses, usually mixed beds (Fortes 1989, 1995). There are seven seagrass species recorded in
the area: Enhalus acoroides, Thalassia hemprichii, Cymodocea rotundata, C. serrulata, Halodule
uninervis
, Halophila ovalis, and Syringodium isoetifolium (Fortes 1989, 1995). The reef area,
particularly the seagrass meadows, is identified as a critical habitat for the spawning and nursery of
juvenile stocks of the Gulf such as rabbitfish and sea urchins. Rabbitfish Siganus fuscescens juveniles
migrate from open sea to the seagrass areas to seek refuge and food habitat while sea urchins
(Tripneustes gratilla) remain within the bed to forage.

PRESENT USE: Bolinao has a population of approximately 80,000 with about 15,000 households. In
Bolinao alone, there are about 3,000 fishers, most of whom are totally dependent on fishing for
income. The pressure on the reefs is bound to increase, and the need for effective resource
management is critical. Mariculture has been increasing and could partially solve the problem,
although present unsustainable practices have caused environmental deterioration and socio-
economic injustice.

Generally, the fishing area in Bolinao is located in the Caquiputan Channel and South China Sea.
There are ten (10) barangays who are engaged in the fishing industry, namely; Germinal, Concordia,
Luciente I, Pilar, Victory, Salud, Goyoden, Binabalian, Dewey, and Lucero. About one-third of
Bolinao's population depend on fishing to make a living, and the Bolinao-Anda coral reef complex
serves as the spawning ground for 90% of Bolinao's fish catch. More than 350 species of vertebrates,
invertebrates, and plants are harvested from the reef and appear in Bolinao markets each year.
Excess supplies are transported to other places like Urdaneta, Dagupan City and Manila.

In 1998, the Fisheries Code gave fishers and their organizations the sole authority to operate fish
pens and fish cages. By 2002, there were about 1,170 units of fish pens and cages in Bolinao alone.

The reef fishery in Bolinao is characterized by a multiplicity and seasonality of gear use. Along the
central and southern shoreline, coastal aquaculture has flourished in estuarine habitats (McManus et
al. 1992). Milkfish (Chanos chanos) is the major culture product in the area. The reef flat also provides
year-round fishing areas for the sustenance of fishers because of their close proximity to shore and
shallow depths. Major gear includes hook and line, drive-in nets, spears, fish traps, fish corrals,
gillnets and illegal implements such as explosives and cyanide poison (McManus et al. 1992). The
estimated fish catches are 12 and 3-tonnage km-2 yr-1 from the reef flat and slope areas, respectively.
Despite heavy exploitation, the reefs have maintained moderate levels of productivity, but with evident
signs of degradation and resource depletion. Decreasing species diversity, abundance, mean size
and size at sexual maturity has been documented for major fish species in Bolinao.

17

Out of the 30 barangays of Bolinao, 20 are found on coastal areas whom 22% of the total population
is engaged in fishing (Philreefs, 2005). Milkfish aquaculture in Bolinao has now become the major
source of income for its inhabitants. Although this practice has made Bolinao the largest producer of
milkfish (Chanos chanos), studies showed that major fish kills that happened in the area resulted from
the overpopulation of fish in the cages.
On the other hand, tourism is also fast becoming popular in Bolinao. A few new resorts have been
developed in the coastal areas servicing both tourists and locals throughout the year.
1.2
Species List
Seagrass Species
Gastropod Species (cont.)
Gastropod Species (cont.)
Cymodocea rotundata
Nassarius albescens albescens
Astralium calcar
Cymodocea serrulata
Nassarius coronatus
Turbo chrysostomus
Enhalus acoroides
Nassarius limaeniformis
Turbo reevi
Halodule pinifolia
Nassarius margaritiferus
Vassum turbinellum
Halodule uninervis
Natica gualtieriana
Turridrupa cerethina
Halophila minor
Polinices melanostromus
Serpulorbis sp
Halophila ovalis
Polinices tumidum
Dolobella auricularia
Syringodium isoetifolium
Nerita planospira
Anadara maculosa
Thalassia hemprichii
Neritina (Vittoida) variegata
Trachycardium flavum
Gastropod Species
Clithon oaulaniensis
Cardita variegata
Angaria delphinus
Cerithedia cingulata
Mercenaria sp
Cantharus fumosus
Terebralia sulcata
Hormomya mutabilis
Engina alveolata
Pyramidella ventricosa
Modiolus philippinarium
Bulla ampulla
Otopleura auriscati
Crassostrea palmipes
Bursa granularis
Pyrene varians
Chlamys lentiginosa
Conus boeticus
Pyrene punctata
Atrina pectinata
Conus coronatus
Strombus aratum
Atrina sp
Conus eburneus
Strombus canarium
Pinctada margaritifera
Conus miles
Strombus gibberulus gibbosus
Pinctada martensi
Conus marmorius
Strombus labiatus labiatus
Malleus malleus
Conus parvulus
Cronia (Morula) margariticola
Pteria sp
Conus guercinus
Cronia funiculus
Spondylus candidus
Conus striatus
Druppa grossularia
Spondylus sinensis
Conus virgo
Druppa rubusidaeus
Spondylus squamosus
Cerithium alveolus
Drupella ochrostoma
Anomalocardia squamosa
Cerithium citrinum
Favartia sp
Gafrium spp
Cerithium columna
Morula granulata
Lioconcha sp
Cerithium nodolosum
Thais echinuata
Periglypta chemnitzii
Cerithium tenellum
Thais savignyi
Placamen tiara
Clypeomorus batillariaformis
Nassarius albescens albescens
Meretrix sp
Clypeomorus brevis
Nassarius coronatus
Crustacean Species
Clypeomorus coralium
Nassarius limaeniformis
Pagurus sp
Rhinoclavis vertagus
Nassarius margaritiferus
Hemigrapsus sp
Coralliophila costularis
Natica gualtieriana
Potunus sp
Coralliophila erosa
Polinices melanostromus
Calappa sp
Vexillum (Costellaria) plicarium
Polinices tumidum
Unidentified spider crabs
Vexillum subdivisum
Nerita planospira
Squilla sp
Vexillum virgo
Neritina (Vittoida) variegata
Balanus sp
Cymatium pileare
Clithon oaulaniensis
S corallinus
Cymatium vespaceum
Cerithedia cingulata
S javus
Gyrineum gyrinum
Terebralia sulcata
S vulpinus
Cypraea annulus
Pyramidella ventricosa
Siganus spp
Cypraea arabica
Otopleura auriscati
Sea Urchin Species
Cypraea (Erosaria) erosa
Pyrene varians
Diadema setosum
Cypraea (Erronea) errones
Pyrene punctata
Echinometra mathaei
Cypraea helvola
Strombus aratum
Echinothrix calamaris
Cypraea (Luria) isabella
Strombus canarium
Echinothrix diadema
Cypraea lynx
Strombus gibberulus gibbosus
Eucidaris metularia
Gastropod Species (cont.)
Gastropod Species (cont.)
Sea Urchin Species (cont.)
Cypraea moneta
Strombus labiatus labiatus
Echinocardium sp
Cypraea talpa
Stombus lentiginosus
Laganum laganum

18

Cypraea tigris
Strombus luhuanus
Toxopneustes pileolus
Fasciolaria trapezium
Strombus mutabilis
Tripneustes gratilla
Latirus (Latirulus) craticulatus
Strombus urceus urceus
Salmacis sphaeroides
Peristernia ustulatus
Lambis lambis
Holothurian Species
Modulus tectum
Lambis millepeda
Actinopya echinites
Chicoreus brunneus
Terebra areolata
Bohadschia argus
Cronia (Morula) margariticola
Euchelus atratus
Bohadschia marmorata
Cronia funiculus
Monodonta canalifera
Holothuria atra
Druppa grossularia
Stomatia phymotis
Holothuria fuscocinerea
Druppa rubusidaeus
Tectus fenestratus
Holothuria leucospilota
Drupella ochrostoma
Tectus pyramis
Holothuria pulla
Favartia sp
Trochus maculatus
Holothuria scabra
Morula granulata
Trochus niloticus
Stichopus sp
Thais echinuata
Trochus stellatus
Synapta spp
Thais savignyi
Umbonium costatum
Starfish species


Archaster typicus


1.3
Map of Bolinao Demonstration Site














19

APPENDIX 2. STAKEHOLDER PARTICIPATION PLAN FOR THE DEMO SITE PROJECT

STAKEHOLDERS
ROLE/ PARTICIPATION
Government Units
Local Government Unit of
Shall provide necessary counterpart funds amounting to at least
Bolinao
10% of the total project investment in terms of manpower, funds,
equipment, and facilities to support the implementation of the
project; shall designate a fishery technician and municipal
agriculturist to assist in the formulation and implementation of the
management plan, assist in the drafting and enactment of the
municipal ordinances and other current and future activities as may
be identified under the project in the municipality; and shall
participate in meetings, planning, implementation, monitoring and
evaluation of activities, and lastly, ensure overall sustainability of
project initiatives through the institutionalisation of the activities
sponsored under UNEP/GEF

Municipal Environment and
Shall initiate and formulate plans by guiding and supervising the
Natural Resources Office
community in the activities set forth for the management and
(MENRO)
protection of natural resources; collect information and analyse
reports pertaining to the environment and resources and
recommends measures to address environmental issues and
concerns; and shall design and recommend protective measures to
assure sustainability of natural resources, to promote equitable
access to natural resources and conserve the environment for the
future generations

Municipal Agriculture's Office
shall develop plans and strategies on agricultural and fishery
programs and implement them upon approval thereof by the
Municipal Mayor; shall enforce rules and regulations relating to
agriculture and fisheries and exercise such other powers and
perform other duties and function as may be prescribed by law or
ordinance

Municipal Coastal Resources
shall deliver basic services and facilities to its constituents, and is
Management Office
responsible for the protection, wise utilization, sustainable use and

management of its natural marine resources

Bureau of Fisheries and
shall contribute to the development and management of the fishery
Aquatic Resources
resources and in providing fisheries livelihood projects; shall
expand and strengthen existing extension services to promote
various farming technologies on fisheries that are highly productive,
cost effective and within the ecological limits of Bolinao; and shall
disseminate information through intensified IEC to create public
awareness and help empower the private sector to assume primary
responsibility for food security and management of its own
resources

Fisheries and Aquatic
shall assist in the preparation and recommendation of the
Resources Management
management plan to be submitted to the Municipal Council for
Council
enactment of ordinances and resolutions; shall assist in the
enforcement of fishery laws, rules and regulations in the municipal
waters; and shall perform other functions necessary fro the success
of the project
Bantay Dagat (Sea Watchers
shall monitor and control illegal fishing activities to reduce damage
Program)
to fish stock and fish habitats, like coral reefs and seagrass:
manage effective monitoring and evaluation system using patrol
boats and communications; and shall enforce law and municipal
fisheries ordinance


20

Department of Tourism
shall encourage, promote, and develop tourism as a major socio-
economic activity to generate foreign currency and employment and
to spread the benefits of tourism to both the private and public
sector.

People's Organizations

KAISA-KA (Kaisahan ng mga
membership: SAMMABAL, SAPA, SAUDI, FEDELA, SAMMAKA,
Samahan Alay sa Kalikasan or SAMMABI and SMMV maintaining the management of a marine
Federation of Organizations for protected area and mangrove reforestation projects
the Environment)

Local Fishers
shall be the subject of researches and surveys and have gained
benefit through learning through collaborative management
approaches, trainings and information dissemination

Local tourism industry
shall provide local eco-tourism information and promote
ecologically-sound tourism practices

Academe

The Marine Science Institute
shall conduct research on the flora, fauna, and coastal
oceanography in the area; shall implement and provide laboratory
and office space and expertise to the demo site project; and shall
act as the 'environmental watchdog' especially in the northern part
of the Philippines based on their scientific results




21

APPENDIX 3 CAUSAL CHAIN ANALYSIS


INTERVENTION
I
S/

COM
CO PON
O ENTS
EN
UNDER
DE LYI
Y NG
I
T
NG HREA
H
T
REA S


Provide resource

da
d t
a a a
a nd inf
a
or
o mat
m ion
Lack of
IM
I MED
E IAT
I
E THREATS
COR
O E

for t
o he dev
h
elopme
elopm n
e t
n
com
co p
m re
p he
h n
e si
n v
si e
e
PROB
PRO LEM
LE

of mana
ma g
na eme
m n
e t
n pla
pl n
a
resource dat
resource da a
a

and info

Weak
Solid wast
o
e
S

Design
Desig and
n

and
ma
m na
a gement
m

dispo
p s
o al
Siltat
a ion
E

dissem
e inat
in e
Lac
La k of pu
p b
u l
b ic
c
pla
pl n
a
A

inform
o
at
rm ion and
on an
involv
o ement
em

G

educat
e
ion ca
io
mpaign
m
and
a
R

mat
ma er
e irals
pa
p r
a ti
r c
ti i
c pa
p ti
a o
ti n
o
Aquac
qua ult
u ure
Pol
Po u
l ti
u o
ti n
o &
n
A

(pe
(p n
e s
n &
s
ca
& g
ca e
g s)
e
eutrophication
o
S

Formulate and
S

Formulate and
No
Lack of public
pu


impl
im eme
m n
e t
n municip
m
a
unicip l
a
environment
ironm
al
awarenes
awarene s

ordinance on
Releas
Relea e of
ordinance on
D
education
dead bangus
Harmf
Harm ul a
u lgal

seagrasses as
dead bangus

E
mat
ma er
e irals
from fishkil s
bloom

resource and habit
resource and
at
from fishkil s
at
G

R

A

Enhanc
Enhan e
e
Lack of
Boat
o anchoring
Seagrass
D


stakeho
eh l
o der
de s
s
legisla
le
t
gisla ion
and sc
a
ou
o ring
u
tram
r
pli
am ng
A
ng

capacit
a
y f
y or
Weak la
l w
a
or
w
T

reso
re u
so r
u ce
c
enfor
o cement
e
e
I

mana
m
geme
m nt
e
Wea
e k
a capacity
y
O

for resource
o

Pu
P s
u h
s n
h e
n t fi
e sh
t fi i
sh ng
r resource
n
N/

Over
e fi
r s
fi h
s i
h ng
n /
ma
m na
a gement
m
L

Develop an
e
d
overexpl
p oi
o tat
a ion
lop and
on
O

impl
im ement
m

of resources

S

supple
supp ment
m
al/alt
a ern
No alter
e nat
n ive
S

ative liv
e li eliho
e
od
liho
liv
li elih
e ood
lih
program

22

APPENDIX 4. EVALUATION AND MONITORING PLAN

1. Collecting and reporting data on performance indicators
Environmental Indicators. Resource assessment shall be done at the start and at the end of the
project to know the (1) floral and faunal biodiversity and (2) to evaluate the impact of the project on
the ecological health of the seagrass meadows. Database shall be established after the resource
assessment for the management and easy analysis of the data. Three pilot sites shall be chosen and
the drafted management plan will be implemented to these areas. Seagrass parameters shall be
monitored using the SeagrassWatch methods by the trained community volunteers every after three
month. The collected data shall be encoded in the database for easy access, retrieval and analysis.
Socio-economic Indicators. A survey with the local communities shall be conducted at the
beginning and at the end of the project using a mixture of participatory methods and questionnaires.
Pre-implementation survey and assessment of current seagrass knowledge shall also be done to
determine appropriate information and educational strategies. Aside from these, several trainings and
workshop shall be conducted during the entire duration of the project depending on the needs of the
community especially on the resource assessment and monitoring for effective resource
management.
Process Indicators. The impacts of the different activities of the project such as the resource
assessment, information and education campaign, livelihood, and others shall be evaluated through
participatory approaches during the mid-term and end of the project. This is to assess the community
satisfaction and involvement and to which degree the project meets the local needs in terms of
managing coastal resources through IEC and sustainable alternative livelihood program. Each
participant attending the trainings and workshops shall be obliged to evaluate the output of such
activities for future revision and development.
Quarterly financial report shall be prepared by the demo site project manager and sent as report to
the donor as required under the terms of agreement. This is needed for the processing and releasing
of the next quarter budget request. Progress of the project through the project manager shall also be
assessed quarterly as required under the signed terms of agreement.

2. Schedule of mid-term review, self evaluation and end-of-project evaluation


2005
2006
2007


Monito
Monit ring/Evaluatio
t n
3
4
1
2
3
4
1
2
3
4


Ecological assessment

Mid-term review
Internal eva
ev luation of pr
of
ogress

End of project
proj
eva
v luatiton


Mid-term review of the project shall be conducted eighteen months after the start of the project and
three months prior to the termination of the project. An external evaluator shall be hired or sent by the
donor to conduct such review. An internal evaluation of activities will also be done. The reviews that
focused on the IEC, socio-economic and resource impacts of Municipal Ordinances, and sustainable
alternative livelihood shall be scheduled on the third quarter of second year and fourth quarter of third
year of the project implementation and these reviews shall involved local communities. Over-all, these
project evaluations aim to determine the effectiveness of the strategies and approaches that are
utilized for a particular activity to ultimately reverse the degradation trends of seagrasses in the
demonstration site.

23

3. Description of how monitoring and evaluation activities will involve participants and
stakeholders

Monitoring and evaluation through participatory approach in the local level shall be the integral part of
the project. Stakeholders' interest and support shall be gained in the community-based quarterly
monitoring of seagrass parameters using the SeagrassWatch method. Prior to the implementation of
the said activity, the volunteers from the local communities or the three pilot sites shall be trained to
conduct the monitoring. The trainings involved taxonomy seagrasses and related fauna and flora for
resource assessment, and the bio-parameters measurement. Questionnaires and evaluation criteria
shall also be developed and answered for each activity to have a feedbacking, which involves
consultants and the local communities (stakeholders) as interviewees.

4. Resources that will be allocated to monitoring and evaluation

Five thousand (US$) shall be allocated for the mid-term and end-of-project evaluation to cover
consultancy fees and expenses for external evaluator. For the internal evaluation of the project, US$
7,000.00 (US$ 3,000.00 from UNEP and US$ 4,000.00 worth of cash and in kind contribution from co-
funding) shall be allocated to cover the expenses for the said activity.

5. How will monitoring and evaluation results be used in management?

Key issues shall be highlighted in the progress report for discussion at the project management level.
This will help in identifying problems and possible solutions at the project management team prior to
the mid-term project evaluation. The issues and problems will be addressed and solutions will be
implemented in the succeeding quarters of the project. Final evaluation and final report will be
published to help the donor, participants, resource managers, and other interested parties, e.g. World
Seagrass Association and SeagrassNet, learn the lessons from the project. Cape Bolinao demo site
also plans to evaluate the different components of the project such as IEC, livelihood and resource
assessment two times during the entire duration of the project to address particular issues for
effective management.
























24

APPENDIX 5.1
Budget by activities


Objectives/Components
GEF CO-FINANCING
Co-funding
GEF
TOTAL


1000 2000 3000 4000
5000 1000 2000
3000 4000 5000
in kind in cash
Development and Implementation of Management Plan Based on
1














Comprehensive Data and Information
1.1 Resource
assessment














Subcontract to do survey of species and density (5
1.1.1
0
750
0
0
0




750

750
persons*5days*30)
1.1.2 Boat Rental (7days*20)
0
140
0
0
0




140

140
1.1.3 Diving equipment rental (7days*5sets*10)
0
350
0
0
0




350

350
1.1.4 Field materials
0
300
0
0
0





300

300
1.1.5 Transportation Expenses (5persons*20)
0
100
0
0
0




100

100
1.1.6 Meeting to identify seagrass areas (20 persons*1 day*10)
0
200
0
0




200

200
Mapping of seagrass areas (validation from existing references and
1.1.7
500

0
0




500

500
field surveys) (1 consultant*500)
1.2 Database
Establishment










0

0
1.2.1 Database formulation design (1 consultant 4wm at 500/mo)
2,000

0
0




2,000

2,000
1.2.2
Data
gathering

0
0

0
0
1.2.3
Database
establishment

0
0

0
0
1.2.4 Training on database application (10 persons*1 day*20)


200
0
0




200

200
Printing and distribution of compiled seagrass data (in CDs, papers
1.2.5

0
1,000


1,000
1,000
published, area summaries) 200 copies*5
1.3
Preparation of Municipal Ordinances










0

0
1.3.1 Meeting for drafting of Municipal Ordinance (10 persons*70)
0
700
0
700

700
Meeting for review and consultation (2 days*50 persons*20) half will
1.3.2

1,000

1,000
1,000
500
500
2,000
be shouldered by LGU
1.3.3 Rental of meeting venue (1 day* 200)







200

0
200
200
Prioritisation/ identification of areas for particular uses (fish
1.3.4










0

0
enhancement, research, conservation, multiple use)
Meeting to generate stakeholder interest and partnership (1day*40
1.3.5

800


800
800
persons*20)
1.3.6 Transportation expenses for meeting participants(50 persons*10)


500






500

500
1.3.7 Rental of meeting venue (1 day* 200)







200

0
200
200
1.3.8 Meeting for approval of Municipal Ordinances (1 day*10 persons*70)






700

0
700
700
Publication of approved Municipal Ordinances (7days publication in
1.3.9



700
0
700
700
local newspaper*100/day)

25



Objectives/Components
GEF CO-FINANCING
Co-funding
GEF
TOTAL


1000 2000 3000 4000
5000 1000 2000
3000 4000 5000
in kind in cash
1.4
Survey for Pilot Site Planning










0

0
1.4.1 Detailed survey of the pilot sites (5 persons*5days*30)

750







750

750
1.4.2 Boat Rental (7 days*20/day)

140







140

140
1.4.3 Diving equipment rental (7days*5sets*10)

350







350

350
1.4.4
Field
materials

300


300
300
1.4.5 Transportation Expenses (5persons*20)

100







100

100
1.5
Consultation meeting for designing of pilot site










0

0
Consultation meeting for zoning, mapping and associated activities
1.5.1

600


600
600
agreed upon (30 persons*1 day*20/day)
1.5.2 Rental of meeting venue (1 day* 200)







200

0
200
200
1.5.3 Development of regulation for 3 pilot sites (1 consultant 1wm*500/mo)
500








500

500
Meeting for consultation and approval of regulations (1 day*50
1.5.4

500


500
500
persons*10/day)
1.5.5 Rental of meeting venue (1 day* 200)







200

0
200
200
1.6
Implementation of Pilot Site










0

0
Training and mobilization of local police and Bantay Dagat on
1.6.1

900


900
900
enforcement of regulation in pilot sites (30 persons*30/day*1 day)
1.6.2 Co-funding for Bantay Dagat membership (24wm/30 persons/100/mo)




72,000



0
72,000
72,000
1.6.3 One environmental lawyer as consultant (3wm at 500/mo)
1,500








1,500

1,500
1.7
Assessment of socio-economic impact of Municipal Ordinance









0

0
1.7.1 One consultant 2wm at 500/mo
1,000








1,000

1,000
Meeting for assessment of socio-economic impact (1 day* 40
1.7.2

2,400


2,400
2,400
persons*30/day* 2 assessments)
1.8 Implementation
of
SeagrassWatch










0

0
Meeting for establishment permanent sampling/ monitoring sites
1.8.1

300


300
300
(1day*15 persons*20/day)
Monitoring of seagrass demo site using SG watch method (2 days*10
1.8.2

4,800


4,800
4,800
persons*30* 8 samplings)
1.8.3 Boat Rental (2 days*20/day*8 samplings*2 boats)

640







640

640
1.8.4 Diving equipment rental (2 days*5sets*10*8 samplings)

800







800

800
1.8.5 Field materials (300/ kit* 3 sites*2)

1,800







1,800

1,800

26



Objectives/Components
GEF CO-FINANCING
Co-funding
GEF
TOTAL


1000 2000 3000 4000
5000 1000 2000
3000 4000 5000
in kind in cash
2
Information Education Campaign










0

0
2.1
Information campaign for seagrasses










0

0
Pre-implementation survey and assessment of current seagrass
2.1.1 knowledge and determination of appropriate strategies through focus
2,000


2,000
2,000
group discussion (4 days*50 persons*10)
One IEC consultant to prepare all information campaign materials
2.1.2
1,500


1,500
1,500
(3wm at 500/mo)
One Research Assistant to work with IEC Consultant (3wm at
2.1.3
900


900
900
300/mo)
Development of IEC materials (brochures 200 copies*4/copy; posters
2.1.4 200 copies*2/copy; booklet-type materials 200 copies*7/copy; digital 3,000

3,000
3,000
materials 200 copies*2/copy)
2.1.5 Media delivery (local radio and newspaper)




1,500




1,500

1,500
2.1.6 Transportation expenses for distribution of IEC materials




200




200

200
Consultation on impact evaluation of IEC (1 day* 50 persons*20/day*
2.1.7

2,000
0
1,000
1,000
2,000
2 assessments)
3 Capacity
Building










0

0
3.1
Training on seagrass taxonomy and resource assessment










0

0
Workshop on seagrass taxonomy, bio-parameter measurement and
3.1.1

3,000


3000
3,000
associated marine plants and fauna (3 days*50 persons*20/day)
3.1.2 Workshop materials


600






600

600
3.1.3 Rental of workshop venue (3 days*200/day)







600

0
600
600
3.1.4 Transportation expenses for fieldwork (5 boats*1 day*20/day)


100






100

100
Experts to develop training strategies and to train the participants (2
3.1.5

800


800
800
persons*4days*100)
3.2
Legal and Paralegal Training










0

0
Training on Proper Implementation of Municipal Ordinances (30
3.2.1

600


600
600
persons*1 day*20/day)
Lecturers to develop training strategies on legal and paralegal and to
3.2.2

400


400
400
train the participants (2 days*1person*200)
3.2.3 Rental of meeting venue (1 day* 200)







200

0
200
200

27



Objectives/Components
GEF CO-FINANCING
Co-funding
GEF
TOTAL


1000 2000 3000 4000
5000 1000 2000
3000 4000 5000
in kind in cash
3.3
Training for Seagrass Watch










0

0
Development and printing of materials to introduce seagrass watch
3.3.1

600


600
600
concept
3.3.2 Membership campaign through ads and radio (7 days announcement)

300






300

300
Co-funding for community coordinators to spearhead seagrasswatch
3.3.3


6,000

0
6,000
6,000
(5 coordinators*100/person*12wm)
Training on seagrass watch methods for volunteers (30 persons*2
3.3.4

1,800


1,800
1,800
days*30/day)
3.3.5 Lecturer to train the participants (2 days*2 consultants*100)


400






400

400
3.4 Group
training










0

0
3.4.1 Training on solid waste management (1 day*30 persons*30/day)


900






900

900
3.4.2 Lecturer to train the participants (1 consultant*200)

200






200

200
3.4.3 Rental of training venue (1 day*200/day)







200

0
200
200
Study tours to MPAs with seagrass meadows as major component
3.4.4

1,400


1,400
1,400
(14 participants*50/day*2days)
4 Livelihood
Skills










0

0
4.1
Piloting of one (1) livelihood approach










0

0
One research assistant to do survey of extant skills and strategies
4.1.1
800



800
800
(4wm*200/mo)
Consultant to develop livelihood strategies and train the participants
4.1.2
2,000



2000
2,000
(4wm*500/mo)
Printing of manuals on sustainable resource-based livelihoods
4.1.3

800

800
800
(200copies*4/copy)
Training on alternative and resource-based livelihood (50 persons*2
4.1.4

1500


1500
1,500
days*15/day)
4.1.5 Rental of training venue (2days*200/day)







400

0
400
400
4.1.6 Implementation of alternative livelihood (50 households*150)
7,500


7,500
7,500
4.1.7
Livelihood
participatory
assessment

1,000

0
500
500

28



Objectives/Components
GEF CO-FINANCING
Co-funding
GEF
TOTAL


1000 2000 3000 4000
5000 1000 2000
3000 4000 5000
in kind in cash
5
Project Management










0

0
5.1
Operation of Management Board










0

0
Meeting for the establishment of management board (1 day
5.1.1 accommodation*15 persons*20/day; half of the expenses to be

150

150
150
150
300
shouldered by LGU)
5.1.2 Co-funding for meeting participation (15persons*70)

1,050
0
1050
1,050
Co-funding for experts from MSI to act as consultant to the
5.1.3


21,600

0
21600
21,600
management board (3 consultants*12 mos*600/mo)
Transportation expenses for participants coming from Manila (5
5.1.4

100


100
100
persons*20/person)
5.1.5 Demonstration Site Manager (825/mo*30 mos)
24,750








24,750

24,750
5.1.6 Travel expenses of Demo Manager (10 trips*100)
1,000








1,000

1,000
5.1.7
Technical
Assistant
(380/mo*30
mos)
11,400

11,400
11,400
5.1.8
Community
Coordinator
(380/mo*30
mos)
11,400

11,400
11,400
5.2
Establishment of project office










0

0
5.2.1 Co-funding for rental of office space (30 mos*400/mo)








12,000
0
12000
12,000
5.2.2 Co-funding for rental of laboratory space (30 mos*400/mo)








12,000
0
12000
12,000
Repair and maintenance of office and laboratory premises (half will be
5.2.3



800



800
800
800
1,600
shouldered by MSI)
5.2.4 Office furnitures (half will be shouldered by MSI)



400



400
400
400
800
5.2.5 One unit desktop computer with printer and scanner



1,500





1,500

1,500
5.2.6 One unit LCD projector and projection screen



2,500





2,500

2,500
5.2.7 One unit digital camera with underwater casing



1,000





1,000

1,000
5.2.8 One unit GPS



700





700

700
5.2.9 Repair and maintenance of office equipment and computer




800




800

800
5.2.10 Communication expenses for day to day office management




800




800

800
5.2.11 Postage and freight




800




800

800
5.2.12
Office
supplies
2,000

2,000

29



Objectives/Components
GEF CO-FINANCING
Co-funding
GEF
TOTAL


1000 2000 3000 4000
5000 1000 2000
3000 4000 5000
in kind in cash
5.3
Periodic meetings and reporting










0

0
Quarterly meetings of the Management Board (1 day
5.3.1

3,000


3,000
3,000
accommodation*15 persons*10 meetings*20/day/person)
Co-funding for meeting participation of members of the board
5.3.2

10,500
0
10500

10,500
(70/meeting*15 persons*10 meetings)
5.3.3 Rental of meeting venue (200/day*10 meetings)







2,000

0
2,000
2,000
Transportation expenses of members from Manila (5
5.3.4

1,000


1,000

1,000
persons*20/person*10 meetings)
Half year meeting of the National Committee (1 day
5.3.5

2,400


2,400

2,400
accommodation*12 persons*5 meetings*40/person)
Co-funding from meeting of committee members (12
5.3.6

4,200


0
4200
4,200
persons*70/meeting/5 meetings)
5.3.7 Rental of meeting venue (200/day*5 meetings)







1,000

0
1000
1,000
Transportation expenses for members from outside Manila (3
5.3.8

2,250


2,250
2,250
persons*150/ person*5)
End of GEF funding period stakeholder consultation (30 persons*1
5.3.9

600


600
600
day*20/day)
Transportation expenses for participants from Manila (5 persons*20/
5.3.10

100


100
100
person)
5.3.11 Rental of meeting venue (200/day*1day)







200

0
200
200
Print and submit final project summary report to PCU, including
5.3.12

200


200
200
financial statements (50 copies*4/copy)
5.4
Annual audit










0

0
5.4.1 Auditor's fee (200/year*3 years)




600




600

600
5.4.2 Finance officer to manage the project funds (30wm*500/mo)





15,000



0
15,000
15,000
Evaluation at mid term and end of GEF funded phase of project
5.5
5,000

5,000
5,000
by independent regional expert
5.6
Exit strategy through workshop










0

0
5.6.1 Consultant to prepare document for the workshop (1consultant*500)
500








500

500
Meeting workshop on turning over of responsibility/ resource
5.6.2

900


900
900
management to stakeholders (30 persons*1 days*30/day)
Transportation expenses for participants from Manila (5 persons*20/
5.6.3

100


100
100
person)
5.6.4 Rental of meeting venue (200/day*1day)







200

0
200
200
Total 59,750 18,820 32,000 8,900 15,300
114,600
0 26,900 25,200
700
134,770 163,350
4,050 302,170



30

APPENDIX 5.2
Budget by object expenditure.



2nd Half 2005
1st Half 2006
2nd Half 2006
1st Half 2007
2nd Half 2007
Total years


Co-financing Co-financing Co-financing Co-financing Co-financing Co-financing
GEF
Total
GEF
Total
GEF
Total GEF
Total GEF
Total GEF
Total


in cash in kind
in cash in kind
in cash in kind
in cash in kind
in cash in kind
in cash in kind
1000 PROJECT PERSONNEL COMPONENT
























1100 Project Personnel
























1101 5.1.5 Demonstration Site Manager
4,950

4,950
4,950

4,950
4,950

4,950
4,950

4,950
4,950

4,950
24,750
0
0
24,750
(30wm*825/mo)
1102 5.1.7 Technical Assistant (30wm*380/mo)
2,280

2,280
2,280

2,280
2,280

2,280
2,280

2,280
2,280

2,280
11,400
0
0
11,400
1103 5.1.8 Community Coordinator (30wm*380/mo)
2,280

2,280
2,280

2,280
2,280

2,280
2,280

2,280
2,280

2,280
11,400
0
0
11,400
1104 2.1.3 Research Assistant to work with consultant
0
900
900

0
0
0
900
0
0
900
on IEC (3wm*300/mo)
1105 4.1.1 Research Assistant to conduct survey on
0
0
800
800
0
0
800
0
0
800
extant livelihood skills (4wm*200/mo)
1106 1.6.2 Co-funding for Bantay Dagat membership
0 18,000 18,000 18,000 18,000
18,000 18,000
18,000 18,000
0
0
72,000
72,000
(24wm*30persons*100/mo)
1107 3.3.3 Co-funding for Community Coordinators to
0
1,500 1,500
1,500
1,500
1,500
1,500
1,500
1,500
0
0
6,000
6,000
spearhead seagrass watch (12wm*5
coordinators*100/mo)
1108 5.4.2 Co-funding for finance officer to manage

3,000 3,000
3,000 3,000
3,000
3,000
3,000
3,000
3,000
3,000
0
0
15,000
15,000
the project funds (30wm*500/mo)
1199 Total
9,510
0
3,000 12,510 10,410
0 22,500 32,910 10,310
0 22,500 32,810
9,510
0 22,500 32,010
9,510
0 22,500 32,010
49,250
0
93,000 142,250
1200 Consultants

























1201 1.1.7 Consultant on mapping of seagrass areas
500

500


0


0


0


0
500
0
0
500
(1wm*500/mo)
1202 1.2.1 Consultant to design and develop
1,000

1,000
1,000

1,000


0


0


0
2,000
0
0
2,000
seagrass database (4wm*500/mo)
1203 1.5.3 Consultant to develop regulations on 3
500

500


0


0


0


0
500
0
0
500
pilot sites (1wm*500/mo)
1204 1.6.3 Environmental lawyer as consultant on the
0
1,500 1,500
0
0
0
1,500
0
0
1,500
implementation of pilot sites (3wm*500/mo)
1202 1.7.1 Consultant on assessment of socio-

0

0
500
500
0
500
500
1,000
0
0
1,000
economic impact of municipal ordinances
(2wm*500)
1205 2.1.2 Consultant on IEC (3wm*500/mo)



0
1,500

1,500


0


0


0
1,500
0
0
1,500
1206 4.1.2 Consultant to develop livelihood strategies
0
0
2,000
2,000
0
0
2,000
0
0
2,000
and to train participants (4wm*500/mo)
1207 5.1.3 Co-funding for experts from MSI to act as
5,400 5,400
5,400 5,400
5,400
5,400
5,400
5,400
0
0
0
21,600
21,600
consultant to the Management Board (3
consultants*12 wm*600/mo)
1208 5.6.1 Consultant to facilitate workshop on exit

0
0
0
0
500
500
500
0
0
500
strategy (1wm*500/mo)
1299 Total
2,000
0
5,400 7,400
4,000
0
5,400 9,400
2,500
0
5,400
7,900
0
0
5,400
5,400
1,000
0
0
1,000
9,500
0
21,600
31,100
1600 Travel on official business
























1601 5.1.6 Travel expenses of Demonstration Site
200

200
200

200
200

200
200

200
200

200
1,000
0
0
1,000
Manager
1699 Total
200
0
0
200
200
0
0
200
200
0
0
200
200
0
0
200
200
0
0
200
1,000
0
0
1,000
1999 Component Total
11,710
0
8,400 20,110 14,610
0 27,900 42,510 13,010
0 27,900 40,910
9,710
0 27,900 37,610
10,710
0 22,500 33,210
59,750
0 114,600 174,350

31



2nd Half 2005
1st Half 2006
2nd Half 2006
1st Half 2007
2nd Half 2007
Total years


Co-financing Co-financing Co-financing Co-financing Co-financing Co-financing
GEF
Total
GEF
Total
GEF
Total GEF
Total
GEF
Total GEF
Total


in cash in kind
in cash in kind
in cash in kind
in cash in kind
in cash in kind
in cash in kind
2000 SUB-CONTRACT
COMPONENT
























2200 Sub-contracts - non-profit supporting organizations

0
0
0

0
0
0
0
0
2201 1.1.1 Survey of seagrass species and
750
750
0
0
0
0
750
0
0
750
density (5days*5persons*30/day)
2202 1.1.2 Boat rental for survey of seagrass
140
140
0
0
0
0
140
0
0
140
species and density (7days*20)
2203 1.1.3 Rental of diving equipment for survey
350
350
0
0
0
0
350
0
0
350
of seagrass species and density
(7days*5sets*10/set)
2204 1.1.4 Field materials for survey of seagrass
300
300
0
0
0
0
300
0
0
300
species and density
2205 1.1.5 Transportation expenses for survey of
100
100
0
0
0
0
100
0
0
100
seagrass species and density
(5persons*20)
2206 1.4.1 Detailed survey of pilot sites
750
750
0
0
0
0
750
0
0
750
(5days*5persons*30)
2207 1.4.2 Boat rental for detailed survey of pilot
140
140
0
0
0
0
140
0
0
140
sites (7days*20/day)
2208 1.4.3 Diving equipment rental for detailed
350
350
0
0
0
0
350
0
0
350
survey of pilot sites
(7days*5sets*10/set)
2209 1.4.4 Field materials for detailed survey of
300
300
0
0
0
0
300
0
0
300
pilot sites
2210 1.4.5 Transportation expenses for detailed
100
100
0
0
0
0
100
0
0
100
survey of pilot sites
2211 1.8.2 Monitoring of seagrass pilot sites


0 1,200 1,200
1,200 1,200
1,200 1,200
1,200
1,200
4,800
0
0
4,800
using seagrass watch method
(2days*10persons*30*8samplings)
2212 1.8.3 Boat rental for monitoring


0
160
160
160
160
160
160
160
160
640
0
0
640
(2days*20/day*8samplings*2boats)
2213 1.8.4 Diving equipment rental for monitoring

0
200
200
200
200
200
200
200
200
800
0
0
800
(2days*5sets*8samplings*10)
2214 1.8.5 Field materials for monitoring


0 1,800 1,800
0
0
0
0
0
0
1,800
0
0
1,800
(300/kit*3sites*2)
2215 4.1.6 Implementation of alternative


0

0
2,500 2,500
2,500 2,500
2,500
2,500
7,500
0
0
7,500
livelihoods (50 households*150)
2299 Total
3,280
0
0 3,280 3,360
0
0 3,360
4,060
0
0 4,060
4,060
0
0 4,060
4,060
0
0
4,060
18,820
0
0
18,820
2999 Component Total
3,280
0
0 3,280 3,360
0
0 3,360
4,060
0
0 4,060
4,060
0
0 4,060
4,060
0
0
4,060
18,820
0
0
18,820
3000 TRAINING
COMPONENT
























3200 Group training - study tours, field trips, workshops, seminars.





















3201 1.2.4 Training on database application (10
0
200
200
0
0
0
200
0
0
200
persons*1day*20)
3202 1.6.1 Training and mobilization of local

0
900
900
0
0
0
900
0
0
900
police and Bantay Dagat on
enforcement of regulations on pilot
sites (30 persons*30*1day)
3203 2.1.1 Pre-implementation survey and

0 2,000
2,000
0
0
0
2,000
0
0
2,000
assessment of current seagrass
knowledge and determination of
appropriate strategies through focus
group discussion
(4days*50persons*10)
3204 3.1.1 Workshop on seagrass taxonomy, bio-
0 3,000
3,000
0
0
0
3,000
0
0
3,000
parameter measurement and
associated marine plants and fauna
(3days*50persons*20)
3.1.2 Materials on seagrass taxonomy
3205

0
600
600
0
0
0
600
0
0
600
workshop
3206 3.1.3 Rental of venue for seagrass

0
600
600
0
0
0
0
0
600
600
taxonomy workshop (3days*200/day)


32


2nd Half 2005
1st Half 2006
2nd Half 2006
1st Half 2007
2nd Half 2007
Total years


Co-financing Co-financing Co-financing Co-financing Co-financing Co-financing
GEF
Total
GEF
Total
GEF
Total GEF
Total GEF
Total GEF
Total


in cash in kind
in cash in kind
in cash in kind
in cash in kind
in cash in kind
in cash in kind
3207 3.1.4 Transportation expenses for fieldwork

0
100
100
0
0
0
100
0
0
100
component of seagrass taxonomy workshop
(5boats*1day*20/boat)
3208 3.1.5 Lecturers to develop training strategies and
0
800
800
0
0
0
800
0
0
800
to train the participants
(2persons*4days*100/day)
3209 3.2.1 Training on proper implementation of

0
600
600
0
0
0
600
0
0
600
Municipal Ordinances (30 persons*1day*20)
3210 3.2.2 Lecturers to develop training strategies on
0
400
400
0
0
0
400
0
0
400
legal and paralegal and to train the
participants (2days*1person*200)
3211 3.2.3 Rental of venue on legal and paralegal

0
200
200
0
0
0
0
0
200
200
training (1day*200)
3212 3.3.2 Campaign for membership in seagrass

0
300
300
0
0
0
300
0
0
300
watch through ads and radio
3213 3.3.4 Training on seagrass watch methods for

0
1,800 1,800
0
0
0
1,800
0
0
1,800
volunteers (30 persons*2days*30)
3214 3.3.5 Lecturer to train the participants

0
400
400
0
0
0
400
0
0
400
(2days*2consultatnts*100)
3215 3.4.1 Training on solid waste management


0

0
900

900

0

0
900
0
0
900
(1day*30persons*30)
3216 3.4.2 Lecturer to train the participants (1day*200)


0


0
200

200


0


0
200
0
0
200
3217 3.4.3 Rental of venue for solid waste


0

0

200
200

0

0
0
0
200
200
management training (1day* 200)
3218 3.4.4 Study tours to MPAs with seagrass


0

0
1,400

1,400

0

0
1,400
0
0
1,400
meadows as major component (14
participants*50/day*2days)
3219 4.1.4 Training on alternative and resource-based

0

0
1,500

1,500

0

0
1,500
0
0
1,500
livelihood (50 persons*2days*15/day)
3220 4.1.5 Rental of venue for alternative and


0

0

400
400

0

0
0
0
400
400
resource-based training (2days*200/day)
3299 Total
0
0
0
0 11,100
0
800 11,900
4,000
0
600 4,600
0
0
0
0
0
0
0
0
15,100
0
1,400 16,500
3300 Meetings/conferences (give title)
























3301 1.1.6 Meeting to identify seagrass areas (20
200

200
0
0
0
0
200
0
0
200
persons*1day*10)
3302 1.3.1 Meeting for drafting of Municipal Ordinances
0
700
700
0
0
0
0
0
700
700
(10persons*70)
3303 1.3.2 Meeting for review and consultation of

0
1,000
1,000
500
500
1,000
0
0
1,000
500
500
2,000
Municipal Ordinances (2
days*50persons*20) (half will be shouldered
by LGU)
3304 1.3.3 Rental of consultation venue (1day*200)



0


0

200
200


0


0
0
0
200
200
3305 1.3.5 Meeting to generate stakeholder interest


0

0
800

800

0

0
800
0
0
800
and partnership (1day*40persons*20)
3306 1.3.6 Transportation expenses for participants to

0

0
500

500

0

0
500
0
0
500
stakeholder meeting (50persons*10)
3307 1.3.7 Rental of meeting venue for stakeholder


0

0

200
200

0

0
0
0
200
200
meeting (1day*200)
3308 1.3.8 Meeting for approval of Municipal


0

0

700
700

0

0
0
0
700
700
Ordinances (10persons*70)
3309 1.5.1 Consultation meeting for zoning, mapping
600

600
0
0
0
0
600
0
0
600
and associated activities agreed upon
(30persons*1day*20)
3310 1.5.2 Rental of meeting venue for consultation on
200
200
0
0
0
0
0
0
200
200
zoning and mapping (1day*200)
3311 1.5.4 Meeting for consultation and approval of

0
500
500
0
0
0
500
0
0
500
regulations (1day*50persons*10)
3312 1.5.5 Rental of consultation venue (1day*200)



0

200
200


0


0


0
0
0
200
200




















































33



















2nd Half 2005
1st Half 2006
2nd Half 2006
1st Half 2007
2nd Half 2007
Total years


Co-financing Co-financing Co-financing Co-financing Co-financing Co-financing
GEF
Total
GEF
Total
GEF
Total GEF
Total GEF
Total GEF
Total


in cash in kind
in cash in kind
in cash in kind
in cash in kind
in cash in kind
in cash in kind
3313 1.7.2 Meeting for assessment of socio-economic

0

0
1,200

1,200

0
1,200

1,200
2,400
0
0
2,400
impacts of Municipal Ordinances
(1day*40persons*30/day*2 assessments)
3314 1.8.1 Meeting for establishment of permanent
300


300
0
0
0
0
300
0
0
300
sampling/monitoring sites (1day*15
persons*20/day)
3315 2.1.7 Consultation on impact evaluation of IEC


0

0
500
500
1,000

0 500
500
1,000
0
1,000
1,000
2,000
(1day*50persons*20*2 assessments)
3316 4.1.7 Livelihood participatory assessment



0


0


0


0
500
500
1,000
0
500
500
1,000
3317 5.1.1 Meeting for the establishment of
150
150
300
0
0
0
0
150
150
0
300
Management Board (1day
accommodation*15persons*20/day; half of
the expenses to be shouldered by LGU)
3318 5.1.2 Co-funding for meeting participation
1,050 1,050
0
0
0
0
0
0
1,050
1,050
(15persons*70)
3319 5.1.4 Transportation expenses for participants
100

100


0
0
0
0
100
0
0
100
coming from Manila for meeting on
establishment of Management Board
(5persons*20)
3320 5.3.1 Quarterly meetings of the Management
600

600
600
600
600
600
600
600
600
600
3,000
0
0
3,000
Board (1day accommodation*15persons*20)
3321 5.3.2 Co-funding for participation on quarterly

2,100 2,100
2,100 2,100
2,100
2,100
2,100
2,100
2,100
2,100
0
0 10,500
10,500
meeting of the Management Board
(15persons*10 meetings*70)
3322 5.3.3 Rental of venue for quarterly meeting of

400
400
400
400
400
400
400
400
400
400
0
0
2,000
2,000
Management Board (10meetings*200/day)
3323 5.3.4 Transportation expenses for members
200

200
200
200
200
200
200
200
200
200
1,000
0
0
1,000
attending quarterly meetings of the
Management Board from Manila
(5persons*20*10meetings)
3324 5.3.5 Half Year meetings of NSC (1day
480

480
480
480
480
480
480
480
480
480
2,400
0
0
2,400
accommodation* 12persons*5meetings*
40/person)
3325 5.3.6 Co-funding for participation on half year

840
840

840
840
840
840
840
840
840
840
0
0
4,200
4,200
meetings of NSC (12persons*5meetings*70)
3326 5.3.7 Rental of venue for half year meetings of

200
200

200
200
200
200
200
200
200
200
0
0
1,000
1,000
NSC (200/day*5meetings)
3327 5.3.8 Transportation expenses of NSC members
450


450
450
450
450
450
450
450
450
450
2,250
0
0
2,250
residing outside Manila (3
persons*150*5meetings)
3328 5.3.9 End of GEF funding stakeholder


0


0

0

0
600
600
600
0
0
600
consultation (30 persons*1day*20)
3329 5.3.10 Transportation expenses for participants


0


0

0

0
100
100
100
0
0
100
on stakeholder meeting from Manila
(5persons*20)
3330 5.3.11 Rental of venue for stakeholder


0


0

0

0
200
200
0
0
200
200
consultation (1day*200/day)
3331 5.6.2 Meeting/workshop on turning over of


0


0

0

0
900
900
900
0
0
900
responsibility /resource management to
stakeholders (30persons*1days*30)
3332 5.6.3 Transportation expenses for participants


0


0

0

0
100
100
100
0
0
100
from Manila (5 persons*20)
3333 5.6.4 Rental of venue for stakeholder consultation

0


0

0

0
200
200
0
0
200
200
(1day*200)
3399 Total
3,080
150
4,790 8,020
3,230
0
4,440 7,670
4,230
1,000
5,640 10,870
1,730
0
3,540
5,270
4,630
1,000
4,940 10,570
16,900
2,150 23,350 42,400
3999 Component Total
3,080
150
4,790 8,020 14,330
0
5,240 19,570
8,230
1,000
6,240 15,470
1,730
0
3,540
5,270
4,630
1,000
4,940 10,570
32,000
2,150 24,750 58,900


























34


2nd Half 2005
1st Half 2006
2nd Half 2006
1st Half 2007
2nd Half 2007
Total years


Co-financing Co-financing Co-financing Co-financing Co-financing Co-financing
GEF
Total
GEF
Total
GEF
Total GEF
Total GEF
Total GEF
Total


in cash in kind
in cash in kind
in cash in kind
in cash in kind
in cash in kind
in cash in kind
4000 EQUIPMENT & PREMISES COMPONENT
























4100 Expendable
equipment (items under ($1,500 each, for example)




















4101 5.2.12 Office supplies
400

400
400

400
400

400
400

400
400

400
2,000
0
0
2,000
4199 Total
400
0
0
400
400
0
0
400
400
0
0
400
400
0
0
400
400
0
0
400
2,000
0
0
2,000
4200 Non-expendable
equipment
(computers, office equip, etc)

0
4201 5.2.4 Office furnitures (half will be shouldered by
400
400
800
0
0
0
0
400
400
0
800
MSI)
4202 5.2.5 One unit desktop computer with printer and
1,500
1,500
0
0
0
0
1,500
0
0
1,500
scanner
4202 5.2.6 One unit LCD projector and projection
2,500
2,500
0
0
0
0
2,500
0
0
2,500
screen
4203 5.2.7 One unit digital camera with underwater
1,000
1,000
0
0
0
0
1,000
0
0
1,000
casing
4203 5.2.8 One unit GPS
700

700


0


0


0


0
700
0
0
700
4299 Total
6,100
400
0 6,500
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
6,100
400
0
6,500
4300 Premises (office rent, maintenance of premises, etc)




















4301 5.2.1 Co-funding for rental of office space

2,400 2,400
2,400 2,400
2,400
2,400
2,400
2,400
2,400
2,400
0
0 12,000
12,000
(30mos*400)
4302 5.2.2 Co-funding for rental of laboratory space

2,400 2,400
2,400 2,400
2,400
2,400
2,400
2,400
2,400
2,400
0
0 12,000
12,000
(30mos*400)
4303 5.2.3 Repair and maintenance of office and
200
200
400
200
200
400
200
200
400
100
100
200
100
100
200
800
800
0
1,600
laboratory premises (half will be shouldered
by UP-MSI)
4399 Total
200
200
4,800 5,200
200
200
4,800 5,200
200
200
4,800 5,200
100
100
4,800
5,000
100
100
4,800
5,000
800
800 24,000 25,600
4999 Component Total
6,700
600
4,800 12,100
600
200
4,800 5,600
600
200
4,800 5,600
500
100
4,800
5,400
500
100
4,800
5,400
8,900
1,200 24,000 34,100
5000 MISCELLANEOUS
COMPONENT
























5100 Operation and maintenance of equip.

















0
0
0
0
0
5101 5.2.9 Repair and maintenance of office equipment
100

100
100
100
200
200
200
200
200
200
800
0
0
800
and computers
5199 Total
100
0
0
100
100
0
0
100
200
0
0
200
200
0
0
200
200
0
0
200
800
0
0
800
5200 Reporting costs - publications, maps, newsletters, printing.




















5201 1.2.5 Printing and distribution of compiled


0

0
500

500

0
500
500
1,000
0
0
1,000
seagrass data (in CDs, papers, 200copies*5)
5202 1.3.9 Publication of approved Municipal

0
700
700
0
0
0
0
700
0
700
Ordinances (7days publication in local
newspaper*100/day)
5203 2.1.4 Development of IEC materials (brochures

0
3,000
3,000
0
0
0
3,000
0
0
3,000
200 copies*4/copy; posters 200
copies*2/copy; booklet-type materials 200
copies*7/copy; digital materials 200
copies*2/copy)
5204 2.1.5 Media delivery as IEC strategy (local radio
0
1,500 1,500
0
0
0
1,500
0
0
1,500
and newspaper)
5205 2.1.6 Transportation expenses for distribution of
0
200
200
0
0
0
200
0
0
200
IEC materials
5206 3.3.1 Development and printing of materials to
600

600
0
0
0
0
600
0
0
600
introduce seagrass watch concept
5207 4.1.3 Printing of manuals on sustainable


0

0
800

800

0

0
800
0
0
800
resource-based livelihoods
(200copies*4/copy)
5299 Total
600
0
0
600
4,700
700
0 5,400
1,300
0
0 1,300
0
0
0
0
500
0
0
500
7,100
700
0
7,800
5300 Sundry - communications, postage, freight, clearance, etc

0
0
0
5301 5.2.10 Communication
100

100
100

100
200

200
200

200
200

200
800
0
0
800
5302 5.2.11 Postage and freight
100

100
100

100
200

200
200

200
200

200
800
0
0
800
5399 Total
200
0
0
200
200
0
0
200
400
0
0
400
400
0
0
400
400
0
0
400
1,600
0
0
1,600


























35


2nd Half 2005
1st Half 2006
2nd Half 2006
1st Half 2007
2nd Half 2007
Total years


Co-financing Co-financing Co-financing Co-financing Co-financing Co-financing
GEF
Total
GEF
Total
GEF
Total GEF
Total GEF
Total GEF
Total


in cash in kind
in cash in kind
in cash in kind
in cash in kind
in cash in kind
in cash in kind
5500 Evaluation


0

0

0

0

0



5501 5.3.12 Printing of final project summary report to

0

0

0

0
200



200
200
0
0
200
PCU including financial statements
(50copies*4/copy)
5502 5.4.1 Auditor's fee (3years*200/year)
200

200


0
200

200


0
200

200
600
0
0
600
5503 5.5 Evaluation at mid-term and end of GEF

0
2,500 2,500
0
0
2,500
2,500
5,000
0
0
5,000
funded phase of project by independent
regional expert
5499 Total
200
0
0
200
2,500
0
0 2,500
200
0
0
200
0
0
0
0
2,900
0
0
2,900
5,800
0
0
5,800
5999 Component Total
1,100
0
0 1,100
7,500
700
0 8,200
2,100
0
0 2,100
600
0
0
600
4,000
0
0
4,000
15,300
700
0 16,000
9999 Total
25,870
750 17,990 44,610 40,400
900 37,940 79,240 28,000
1,200 38,940 68,140 16,600
100 36,240 52,940
23,900
1,100 32,240 57,240 134,770
4,050 163,350 302,170

Balance




















134,770
4,050 163,350 302,170





36

APPENDIX 6 ARRANGEMENTS FOR COORDINATION AND MANAGEMENT
Site Level Management
For the implementation of the Bolinao Demonstration Site, a qualified Demonstration Site Manager
shall be appointed. His main responsibility will be to report to the SEA and the National Committee on
the activities being conducted at the site and through the SEA to the NTWG. The Demonstration Site
Manager shall be included as full member of NTWG.
The Demonstration Site Manager shall have responsibility for managing the activities at the
demonstration site, under the direction of the Seagrass Demo Site Management Board. Specifically,
the Demonstration Site Manager shall be responsible for:
·
Executing the implementation plan based on the demonstration site proposal prepared by
the Special Executing Agency other tasks decided by the Management Board
·
Planning and managing on a day to day basis the demonstration site activities identified
in the implementation plan, including annual work plan and timetables;
·
Financial responsibility for the approved budget;
·
Execution of activities in accordance with the work plan and timetable and schedule of
expenditures, initially defined in the proposal and amended from time to time by the
Management Board;
·
Reporting of activities outcome to the Management Board, the Focal Point of the SEA,
and the National Technical Focal Point according to an agreed schedule
·
Preparing inputs to the six-monthly expenditure and progress reports and cash advance
requests to be submitted to the Project Coordinating Unit through National Focal Point
·
Preparing and submitting to the PCU through the National Focal Point technical reports in
accordance with the defined outputs of the demonstration site
·
Attending such national and regional meetings as shall be determined by the
Management Board
The Management Board shall have ultimate responsibility and authority for the conduct of activities
at the demonstration site. Members of the board will be the major stakeholders in the area such as:
·
The Local Government Unit of Bolinao
·
Municipal Environment and Natural Resources Office (MENRO)
·
Municipal Agriculture Office (MAO)
·
Municipal Coastal Resources Management Office
·
Bureau of Fisheries and Aquatic Resources
·
Fisheries and Aquatic Resources Management Councils (FARMCs)
·
Bantay Dagat Volunteers
·
Department of tourism
·
KAISA-KA (Kaisahan ng mga Samahan Alay sa Kalikasan or Federation of Organizations
for Environment
·
Local Fishers
·
The Marine Science Institute
In addition to the tasks and responsibilities listed in the MoU between UNEP and the SEA, the
National Focal Point for Seagrass in consultation with the National Seagrass Committee shall
provide scientific and technical advice and guidance to the Management Board regarding the
execution of the demonstration site activities.
The National Focal Point shall be responsible in liaison:
·
Between the Demonstration Site Manager and the PCU regarding the dissemination
of experiences and personnel exchange between sites;
·
Between the Demonstration Site Manager and the National Technical Working
Group, and Regional Working
Over-all Coordination of Demonstration Site Activities
The National Seagrass Committee shall be responsible for coordinating national activities within the
seagrass component. The National Technical Working Group, on the other hand shall be responsible
for coordinating activities between components.
The Specialized Executing Agency after preparing the Demonstration Site Proposal shall continue to
coordinate with other related activities at the national level through the National Seagrass Committee.
The National Technical Working Group shall oversee all activities at the demonstration site in Bolinao.

37

UNEP/GEF/SCS/Vie/MoU 1A
Page 38

Reference List
Aragones, N.V. (1987). Taxonomy, distribution and relative abundance of juvenile siganids and
aspects of the padas fishery in Bolinao, Pangasinan. MS Thesis, College of Fisheries,
University of the Philippines in the Visayas.
Aragones, N.V., & dela Paz, R.M. (1989). Ecological notes on the juvenile siganid (padas) harvest in
Bolinao, Pangasinan, Philippines. Micronesica, 22, 191-195.
Bangi, H.G.P., & Juinio-Menez, M.A. (2001). Sea urchin grow-out culture: Assessment of potential for
implementing community-based coastal resource management (The case in Arnedo). In:
McManus, L.T., Juinio-Menez, M.A., Alino, P.M., Ferrer, E.M., & Dizon, J.C.A. (Eds.), Paving
the Way for Coastal Resources Management: The Bolinao Experience (1993-1997), p. 28-36.
University of the Philippines MSI, CSWCD and Haribon Foundation, IDRC - Canada,
Community-based Coastal Resources Management Program.
De Guzman, A. B. 1990. Community structure of macrobenthic invertebrates on exploited reef flats of
Santiago Island, Bolinao, Pangasinan. MS Thesis, College of Science, University of the
Philippines, Diliman.

De la Paz, R. M. and Aragones, N. V. 1990. Seasonality of siganid fishes (Teleostei, Perciformes) in
Cape Bolinao, Pangasinan, Philippines. Phil. Journal. Vol. 19. No. 3, 223-235pp.

Estepa, N.G., Salmo, S.G.I., Tamayo, E.L., & Juinio-Menez, M.A. (2001). Resource assessment of
economically important macroinvertebrates in Bolinao, Pangasinan, Philippines. In: McManus,
L.T., Juinio-Menez, M.A., Alino, P.M., Ferrer, E.M., & Dizon, J.C.A. (Eds.), Paving the Way for
Coastal Resources Management: The Bolinao Experience (1993-1997), p. 37-40. University
of the Philippines MSI, CSWCD and Haribon Foundation, IDRC - Canada, Community-based
Coastal Resources Management Program.
Fortes, M.D. (1989). Seagrasses: A resource unknown in the ASEAN Region. ICLARM Education
Series 5. International Center for Living Aquatic Resources Management, Manila, Philippines,
46 pp.
Fortes, M.D. (1995). Seagrasses of East Asia: Environmental and Management Perspectives.
RCU/EAS Technical Report Series. United Nations Environment Programme, Bangkok,
Thailand, 79 pp.
Fortes, M. D. 1986. Taxonomy and ecology of Philippine seagrasses. Ph.D. Dissertation, College of
Science, University of the Philippines, Diliman.
McManus, J.W., Nanola, C.L.Jr., Reyes, R.B.Jr., & Kesner, K.N. (1992). Resource ecology of the
Bolinao coral reef system. ICLARM Studies Review No. 22, International Center for Living
Aquatic Resources Management, Manila, Philippines, 117 pp.
Rivera, P.C. (1997). Hydrodynamics, sediment transport and light extinction off Cape Bolinao,
Philippines. Ph.D. Dissertation, Wageningen Agricultural University and the International
Institute for Infrastructural, Hydraulic and Environmental Engineering, The Netherlands, 244
pp.
Rollon, R.N. (1998). Spatial variation and seasonality in growth and reproduction of Enhalus
acoroides (L.f.) Royle populations in the coastal waters off Cape Bolinao, NW Philippines.
Ph.D. Dissertation, Wageningen Agricultural University and the International Institute for
Infrastructural, Hydraulic and Environmental Engineering, The Netherlands, 135 pp.



38