HEPU SEAGRASS DEMONSTRATION SITE
SUMMARY SHEET
1. SITE NAME AND GEOGRAPHIC CO-ORDINTES:
Hepu. The central geographic co-ordinate is 21°28.5'N, 109°40.2'E.
2. COUNTRY IN WHICH THE SITE IS LOCATED
China
3. PROVINCE IN WHICH THE SITE IS LOCATED
Guangxi
The province government has approved Hepu seagrass bed as demonstration site on 28,
July 2003. The local government has been involved in the selection process, and also agreed
to co-finance in kind.
4. LINKAGE TO NATIONAL PRIORITIES, ACTION PLANS AND PROGRAMMES
Central government supports the selection of the demonstration site. Hepu seagrass bed
has been approved as the most important seagrass bed for priority protection by the central
government. The central government will co-finance in cash more than US$. 400,000
National nature reserves for Dugong dugong in Hepu Guangxi and Shankou national
nature reserves for mangrove have been set up in Hepu County. The dugong national nature
reserve covers 350 km2, with a central zone of 132 km2. The objectives are to protect Dugongs
(Dugong dugong), green turtle (Chelonia mydas), Indo-Pacific hump-back dolphin (Sousa
chinensis) and mangroves. The seagrass beds provide food for dugongs. Shankou nature
preserve for mangroves was set up by the state in September 1990, and consists of the
western and eastern coastal sides of Shatian peninsula and enclosed waters. The Mangrove
preserve extends along the coastal zone for 50km. The mangroves cover 8000ha including
4000ha of water and 4000ha of land. These nature reserves assist in the protection of seagrass
beds in Hepu. "Action Plan of China for the Conservation of Biodiversity" was issued in 1994.
This area is one of the priorities site in the action plan.
5. DATE OF NATIONAL TECHINICAL WORKING GROUP MEETING WHICH
CONSIDERED THE PROPOSAL AND RECOMMENDATION
The national technical working group meeting has considered the proposal and provided a
recommendation on 28, August 2003.
6. NATIONAL FOCAL POINT AND/OR NATIONAL TECHNICAL FOCAL POINT
ENDORSMENT AND/OR COMMENTS:
Comments:
As National Focal Point, I would like to endorse this proposal to Dr. John Pernetta, Project
Director of UNEP/GEF project "Reversing Environmental Degradation of South China Sea and
Gulf of Thailand". The proposal is quite comprehensive and tangible. Although this project is
the first experience in managing the seagrass habitat in China, I believe, under the supervision
of South China Sea Institute of Oceanology, the seagrass demonstration site program in the
proposed area will be executed as outlined in this proposal.
Signature:
Mr. Minjian Chen, National Focal Point
Date:
DEMONSTRATION SITE PROPOSAL
7. SITE
DESCRIPTION
AREA
The area of Hepu seagrass bed was 540ha in 2003.
ENVIRONMENT
The seagrass bed, including the adjacent area, is complicated, consisting of a deep slot
and sand ridge arrangement. There is a strong current along this part of the coast, which
causes erosion due to the tides and wave action. The topography of the seabed includes tidal
shoal, tidal and deep slot, tidal sand ridge, and seabed plain.
The weather is influenced by the south subtropical ocean quarter breeze Influence of the
atmospheric-circulation and the geographic location results in some favourable weather
characteristics, for example, winter has no frost, summer is not hot, spring and autumn are
short, and the quarter breeze is extensive. Average air temperature is 22.9 , with a high of
38.2 , and a low of 1.5 . Wind direction varies with the season throughout the year with
prevailing winds in the winter from the northeast and from the southwest in summer, with an
average wind velocity of 3.7m/ s. The average annual rainfall was 1573.4 mm in recent years,
with 83% occurring in the summer half of the year. The rain falls on average for 144 days per
year. Influence of typhoons is important, with two or three occurring every year, usually
between July and September, (CCCBR, 1993).
The average tide range in the area is approximately 2.5m, and is an irregular diurnal or half
diurnal tide. The maximum flood tide velocity is 65cm/s inside the bay, and at the mouth of the
bay is 71cm/s in a N- NNE direction. The maximum ebb tide velocity is 62-77 cm/s inside the
bay, and 106 cm/s at the mouth, where the current direction is South. Maximum wave height is
3.2m at the mouth of Tieshan bay, from the S-SSW direction. The minimum wave height is 0.65
m, from the NE-ENE direction. Maximum wave height is 3.41 m inside the bay, from the
S-SSW, while the minimum wave height is 0.18 m, from the N- NNE direction. The average
seawater temperature is 23.49o in the area, with the extreme highest of 34.4o in summer, and
the extreme lowest of 8.4o in winter. Seawater salinity at the mouth of bay is 26-31 and 20-28
at the top of bay (CCCBR, 1993).
Regarding water quality, generally the water quality is good (Jinyi Lan, et. al. 1999). The
sediment quality is also good.
HABITATS
There are 4 seagrass species growing in the area: Halophila ovalis, Halodule uninervis,
Halophila beccarii and Zostera japonica. H. ovalis is the dominant species, and occupies 75%
of the whole seagrass bed. The coverage of H. ovalis is more than 80%, the average biomass
is 25.5g/m2, and the density is 1385 shoot/m2 (Xiaoping Huang, et. al. 2003)
The other main species is H. uninervis. It's repent roots lie buried in the sand, and may
shoot up and grow all the year round. When the seagrass has been growing up for a long time,
the old foliage dies back and turns yellow, and the new foliage will grow. From March to April
each year H. uninervis will flourish, with many pairs of leaves growing up from the sand, but at
other times, much of the plant lies buried in the sand.
H. ovalis sprouts from November to February, and flourishes from March to June every
year. It is difficult to find after July because it dies back and the leaves fall off. The roots sprout
again from November (Jinyi Lan, et. al. 2001; Weilin Zhang, et. al.2002).
H. uninervis and H. ovalis inhabit the inter-tidal level, where they are able to survivein
muddy. H. ovalis may also sprout and grow in 5m deep water though H. uninervis has not been
found to survive at these depths. Both can undergo full submersion by flood tides with no
ill-effects.
Seven subsidiary beds of seagrass were found during surveys, located at Dianzhousha,
Beimu Salt Field, Yingluo Bay, outside of Yingluo Bay, Danshuikou, Gaoshatou and
Shanliaojiuhejingdi.
Research surveys conducted from April 1987 to July 2003, have determined the
distribution of seagrass at the 7 beds. The visible area of seagrass in summer and spring is
bigger than in winter and autumn, and seagrass growth is better in summer and spring than in
winter and autumn.
There are 5 penaeid, 12 gastropod, and one seahorse species reported in Hepu seagrass
bed. There are also a number species of urchins, siganids, holothurians, starfish, and the green
turtle Chelonia mydas. A species list is provided as Annex 1.
The major habitat of the dugong in China is in the Shatian waters, Hepu Guangxi.
Dugongs inhabit the seabed where the water depth is less 20m. They move to the seagrass
bed, to feed when the tide is flooding and move away on the ebb tide (Yanjun Pang, et.al. 1987;
Yun Zhi, 1996; Guijing Li, 2002).
Feeding habits of dugong vary following seasonal changes to the growth of seagrass.
They feed on Halodule in July to October when Halophila is shriveled. In the typhoon season,
Halodule in the middle tidal zone is covered by sand and mud which has been carried by tidal
current. This makes it difficult for dugong to feed, so they feed on Halophila, which grows in the
low tidal zone. The seagrass beds at Dianzhousha, Beimu salt field, Yingluo Bay, outside of
Yingluo Bay, Danshuikou, Shanliaojin provide suitable food for dugongs.
Shankou preserve for mangrove was set up by the state in September 1990. It consists of
the western, eastern coastal sides of Shatian peninsular and enclosed waters, including
Shankou, Shantian and Baisha town, bordering on the mangrove in Zhanjiang City of
Guangdong (Yanjun Pang, et.al. 1987; Yun Zhi, 1996; Guijing Li, 2002).
The Mangrove preserve extends along the coastal zone for 50km. The mangroves cover
8000ha including 4000ha of water and 4000ha of land. The original zones were: central zone,
with an area of 800ha, buffer zone with an area of 3600ha, and a transition zone with an area of
3600ha. The central zone is located on the east coast of Shantian peninsula from Xianmi river
mouth to Yingluo, and covers 220ha areas of mangroves. The buffer zone includes 510 ha area
of mangrove. The transition zone is the watershed above high tidal zone within 1km and the
external waters of preserve region. Shankou mangrove area has also been included as a
demonstration site in a new UNDP/GEF funded project designed to help maintain biodiversity,
which will also start in 2005, and run for 8 years.
PRESENT USE
The seagrass bed is distributed in coastal areas adjacent to Shankou and Shatian
townships of Hepu county. In the East to Zhangjiang city, Guangdong province, and north to
Bobai county, the coastline is extensive, and fish culture is the main economic activity, together
with agriculture.
The total population of Shankou town was 65,881 in 1999, and the birth rate is 9.5. The
labour force is 42,677 people, the plantation area is about 2267 ha, and the average per capita
income was 2,321 RMB in 1999. Fish culture production is worth 30 million RMB annually.
Shantian town includes 6 villages, Haizhang , Shatian , Shangliao , Shangxin ,Duida and
Danshui; The total population of Shatian town was 16,387 in 1999, and the birth rate is 11.8,
the labour force is 7795 people, the rice plantation area is about 535.6 ha, and the average per
capita income was 3,145 RMB in 1999. Fish culture production is the main component of the
Shatian economy. There are 486 powerboats in the town, and the area under marine
aquaculture is 510.8 ha, with fresh water aquaculture occupying 10.2ha.The total fish culture
production was valued at 21.181 million RMB in 1999.
The rich fishery resource in the seagrass bed provides an important input to the local
economy, and the main activities in the seagrass bed are fishing and aquaculture. The main
fishery activities are: digging for gastropods, catching fish, and cultivating shrimp and pearl
oysters. The seagrass bed is also an important nursery for fish of this area.
MANAGEMENT REGIME
The present management is under two separate entities:
·
The Shatian Town Government has the management rights to the sea; and
·
The Management Station of National Nature Reserves for Dugong, Hepu Guangxi,
under the control of the Guangxi province environmental protection bureau, has the
duty to protect seagrass
8. STAKEHOLDERS
Stakeholders include native fishers, local inhabitant, fishery management, local city
planning department, environmental protection branch and government, dredging company.
The seagrass bed is located adjacent to Shankou town and Shatian town, Along the
coastline fish culture is common, and is one of the main economic activities. The total fish
culture production is worth 21.181 million RMB. The main fishery production methods of local
residents are: trawling, culturing shrimps, culturing pearls, and digging for siphon-worms
Sipunculus nudus marine snails Phascolosoma esculentaes and various shellfish. The
seagrass beds in the area attract rich fishery resources to the surrounding sea region, and the
local residents gain substantial benefit from these fishery resources.
During the development of the local economy, there is likely to be conflict between local
innovative economic development plans and conservation of the seagrass bed. Time will be
needed for consultations to reach compatibility between the demonstration site development of
the seagrass bed and the local government departments, in order to minimise these conflicts.
During the initial period of developing the demonstration site, the related local departments
and inhabitants should be encouraged to provide input. If the local administration authorities
are supportive of the projects goals, they will be more likely to offer substantive support. If the
local inhabitants were also behind the project, they are more likely to cooperate in efforts to
protect the seagrass environment. More detail of strategies intended to encourage the
participation of these stakeholders are provided in Annex 2.
9. THREATS
Natural and Extreme events
The storm tide and the waves caused by typhoons erode the seagrass entirely. A nerite
snail Clithon oualaniensis, then reproduces rapidly, colonizing the space previously occupied
by the seagrass. This results loss of the seagrass seasonally.
Human Activities
Seafood is popular in the market. To increase income, more and more local people go to
the beach to dig Sipunculus nudus (siphon-worms) and snails net for fish, and undertake other
activities. Areas also continue to be reclaimed for aquaculture purposes.
In order to obtain profits, the fisherfolk use many production and harvesting methods which
seriously damage the seagrass bed
Digging siphon-worms snails and shellfish: Digging is popular with more than 2000
people active every day in the seagrass beds throughout most of the area. Digging sometimes
results seagrass' rhizomes being uprooted or broken, negatively impacting growth. Digging
may also cause the sand to become more fluid, and seagrass could be submerged by the
flowing sands, also disturbing the growth.
Aquaculture: Aquaculture can cause damage to the seagrass. There are about 100ha of
seagrass bed being used for cage culture of oysters. The seagrass in the feeding area has
been damaged seriously. There is an accumulation of rubbish, including used wood; and old
shells lying in the feeding areas that had been abandoned.
Trawling: There are more than 400 trawlers working mainly in the areas which are less
than 10 meters deep near Dianzhousha, Gaoshatou and Yingluo Bay of Shankou Town and
Shatian Town. During the trawling operation, the seagrass shoots are pulled out with their roots
and completely destroyed. There is no regulation to prohibit trawling in the area.
Waste water polluting the sea is also a threat for the seagrass. Local sewage, waste water
for fish processing, engine oils from fishing boats, and industrial run off are all disposed of into
the sea and pollute the seagrass site. To resolve this problem there is a need to strengthen the
enforcement of sewage standards for factories and fishing boats through local environmental
protection bureau, and to recycle waste water where possible.
Fish fences: These have been erected throughout more than 150ha of seagrass beds in
Hepu. Seagrasses are destroyed when these fences are established, due to trampling and
digging up the seagrass bed.
More details can be seen in the causal chain analysis (see Annex 3).
10. GOALS & PURPOSE
The goal of the project is to establish a demonstration site of community based
management, with the aim of maintaining the existing biodiversity and environmental condition
and utilize the seagrass resources rationally and sustainably. This is to be accomplished
through maintaining the balance between utilization and conservation, based on community
and government involvement. Experiences in the research, protection and utilization of
seagrass beds in the site will be useful for other seagrass beds in China and hopefully other
parts of the world.
11. RATIONALE
AND
OBJECTIVES
To date, no other seagrass demonstration sites or reserves have been established in
China. Hepu seagrass bed demonstration site, to be established adjacent to the existing Hepu
National Reserve for Dugong, and Shankou National Reserve for Mangrove, will help to protect
the seagrass. The central and local government plan to set up this area as a seagrass reserve.
Hepu seagrass bed demonstration site intends to prevent the degradation of seagrass in
the area, restoring the biological diversity and ecological environment resulting in a high quality
seagrass ecosystem. It also aims to encourage people from the communities to participate in
and cooperate with the demonstration site activities.
The global marine ecosystem is a connective and dynamic system. The establishment of
Hepu seagrass bed demonstration site adjacent to the Shankou National Reserve for
Mangrove and the National Reserve for Dugong will not only improve the marine ecological
environment where seagrass beds are located but will also benefit the global ecological
environment. The objectives are following:
1. Establishment of cross sectoral management framework for the sustainable use of the
Hepu seagrass site;
2. Sustainability of site management;
3. Conservation of seagrass bed ecosystem as major habitat in the site (biodiversity
conservation, dugong protection, etc.);
4. Education and training for increased involvement of all stakeholders in preserving the
seagrass habitat.
12. OUTCOMES
1. There are several outcomes expected from this project:
2. Local community participation on seagrass management.
3. Increased awareness, protection and sustainable use of seagrass by government and
local people.
4. The protection of seagrass beds is included into local socio-economic development
plans.
5. Coordination of the various departments and local public responsible for the protection
and management of seagrass.
6. A seagrass site demonstrating community-based management for the other parts of
the world.
13. PLANNED ACTIVITIES TO ACHIEVE TO ACHIEVE OUTCOMES:
The activities are grouped into four major components as follows:
· Establish cross-sectoral management framework for the sustainable use of the Hepu
seagrass site (Management);
· Sustainability of site management (Sustainability Mechanism);
· Conservation of seagrass bed ecosystem as major habitat in the site (Conservation
Plan);
· Education and training for increased involvement of all stakeholders in preserving the
seagrass habitat (Education & Training).
The framework work plan and timetable are presented in Table 1.
Component 1 - Management
The primary actions under this component focus on the establishment of Hepu seagrass
site management board (MB); establishment of website; and preparation of the management
plan. The activities included in the action of establishment of Hepu site MB are as follows:
· Identification of the members of Hepu site MB;
· Appointment of manager;
· Draft TOR and rules of the MB.
The action of establishment of website include:
· Establishment of project website;
· Appointment of consultants to prepare demonstration site website with
UNEP/GEF Project and demonstration site information materials;
· Establishment of linkage with SCS website & other demonstration site websites.
An important aspect of establishment of cross-sectoral management is, the need to
prepare effective site management plan in consultation with all stakeholders. The project
management will be checked up and evaluated by Guangxi provincial Govt., NTWG and
UNEP, using the ways are as follows: publication of meeting reports, hard copy & via project
website; regular reports from MB; half yearly progress reports and expenditure statements.
Component 2 - Sustainability Mechanism
In order to protect the Hepu seagrass bed effectively, establishing a sustainable
management mechanism is very important. The primary actions under this component focus on
the stakeholder analysis, economic valuation and identification of revenue streams & financial
management. Through evaluating the economic value of Hepu seagrass bed and the
participation of the stakeholders in the management, an agreement of using seagrass
resources in a sustainable way will be reached. This will involve: preparation of a stakeholder
participation plan, assembling necessary information on economic valuation according to
agreed procedures, and discussions with stakeholders to provide inputs to and clearance of
economic valuation.
Identification of revenue streams & financial management also play an important part in
this component. The primary activities under this action include identification & analysis of
potential revenue generation activities, preparation of quantified potential revenue generation
and income projections, identification & estimation of costs of implementing the Management
Plan for Hepu seagrass and dugong, and; establishment of necessary financial management
mechanisms.
Component 3 - Conservation Plan
The primary activities under this component focus on expanding the existing Dugong
Reserve, legislation & enforcement, and collection of information for sound management.
The existing Dugong National Reserve is not large enough and only a few species are
protected. Greater benefit can be achieved by expanding the existing reserve. For this, it is
necessary for a re-evaluation of the existing criteria for the National Dugong Reserve, and to
prepare and implement a workplan.
At the same time, there must be effective legislation and enforcement to carry out the
protected plan. The primary activities of legislation and enforcement will involve preparation of
new legislation or amendments to existing laws and regulations, and pilot activities in reducing
destructive fishing activities.
The collection of information will provide significant support for sound management. The
collection of information will include surveys of the environmental and bio parameters of the
demonstration site; evaluation of the effect of intervention; survey & evaluation of public and
governmental awareness on seagrass.
Component 4 - Education & Training
As a way of protecting the biodiversity of the seagrass bed, the benefit of active
involvement of stakeholders cannot be underestimated. Through education and training, the
awareness of protecting seagrass of local communities will improve quickly, and the agreement
of using seagrass in a sustainable way will be more easily reached. The actions under this
component include a training programme, education, raising awareness of community &
resources users, and capacity building. Organizing the training courses is the primary activity of
training programme. To publicise the importance of protecting seagrass in local schools and
among the communities, a short (20min) video will be produced, posters & brochures printed,
notice boards erected, and additional public awareness materials (such as radio, television
spots and newspaper articles etc.) will be used, as well as establishing the site's webpage. In
addition, attention will be given to the capacity building, to improve monitoring capacity for
seagrass and dugong. An education and interpretation center will also be established.
The detail of the monitoring and evaluation plan is provided in Annex4.
14. SUSTAINABILITY ANALYSIS AND RISK ASSESSMENT
Sustainability
For a successful seagrass demonstration site in Hepu , a management council must be formed
to take charge of the management of the seagrass bed. In addition, long-term protection and
administration should be put in place; and the investigation and monitoring of the seagrass bed
resources must be carried out regularly. All of the above requires funding and personnel. With the
support of GEF funds, government funds and in kind contributions, the project should have proceed
smoothly in the early stages. The management council should ensure these initial resources are
used to produce further funds for the future activities in the demonstration site. For example, the
management council could develop tourism to increase economic return. This could be assisted by
an "interpretation center" with an exhibition on seagrass bed, in which the biological samples, and
photos of the seagrass ecosystem would be shown. Through this the income will be generated
which will help the long-term viability of the demonstration activities. If the demonstration site is set
up as a national or local seagrass natural reservation zone, then it could access funds from the
government regularly.
Risks
The major risks include:
1. The enforcement of new regulation may face many difficulties. The related mitigating action
is to raise public awareness, strengthen compliance with local management institutions,
environmental protection unit and fishery management institutions.
2. Preventing destructive fishing activities on seagrass will, in the short term, reduce the
income of local residents. The related mitigating action is to widely disseminate information
on the significance of the demonstration site, and the long-term benefit of protection of the
seagrass bed to fishery production In addition local government should increase
employment prospects for residents to increase their income, by introducing them to
alternative professions.
15. ESTIMATED BUDGET (IN US$ OR LOCAL CURRENCY)
The total budget is US$806,550, with US$415,200 from the Chinese Government, and
US$391,350 from the GEF. See Tables 1 and 2 in annex 5 for details
16. IMPLEMENTATION PLAN
Table 1 Framework Workplan and Timetable.
Objectives/Components
1st year
2nd year
3rd year
Sub-component
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Activities
Sub-activities
1. Establish Cross Sectoral Management Framework for
the Sustainable Use of the Hepu Seagrass Site
1.1 Establish Hepu Seagrass Site Management Board (MB)
1.1.1 Identify members of Hepu site management board
1.1.2 Select and appoint site manager
1.1.3 Draft TOR and rules of the MB
1.1.4 Approval of membership and TOR by Guanxi Provincial Govt
1.1.5 Regular meetings of management board (12)
1.2 Prepare site management plan, in consultation with all
stakeholders
1.2.1 Consultation with all stakeholders regarding responsibilities,
future uses, and controlled activities at the site
1.2.2 Drafting of initial site management plan
1.2.3 Formal review of site management plan via stakeholders
meetings (2 meetings)
1.2.4 Revision of initial draft plan for submission to MB
1.2.4 Submission and approval of management plan by Beihei City
Government (meeting)
1.2.5 Publish Management plan via local press
1.2.6 Publication of 300 copies of management plan
1.3 Establish & publicize website for demonstration
site
1.3.1 Establish project website
1.3.1.1 Purchase of computers and equipments
1.3.1.2
Software
1.3.1.3 Page design
1.3.1.4 Equipment maintenance & repair
1.3.2 Consultants to prepare demonstration site website with
UNEP/GEF Project and demonstration site information materials
1.3.3 Establish linkage with SCS website, & other demonstration
site websites
1.4 Oversight of project management
1.4.1 Publication of meeting reports, hard copy & via project website
1.4.2 Regular reports from management board to Guanxi Provincial
Govt., and NTWG
1.4.3 Half yearly progress reports and expenditure statements for
UNEP
1.4.4 Project evaluation at mid term and end of GEF support phase
for project, by independent regional expert
1.4.5 Prepare and submission of final project summary report to
UNEP/GEF (50 copies
Table 1 continued
Framework Workplan and Timetable.
Objectives/Components
1st year
2nd year
3rd year
Sub-component
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Activities
Sub-activities
1.5 Implementation of the demonstration activities
1.5.1 Management of Local Executing Agency
1.5.1.1 task manager 36w/m
1.5.1.2 assistants (two persons) 72w/m
1.5.1.3 Travel on official business (108 person trips)
1.5.1.4 Office expendable supplies 36month
1.5.1.5 Office non-expendable equipment (computers, laser
printer, duplicating machine, etc.)
1.5.1.6 rent and maintenance office
1.5.1.7 cost of communication 36month
1.5.1.8 Translation
1.5.2 Management of General Executing Agency
1.5.2.1 Project coordinator 12w/m
1.5.2.2 Project assistants 36w/m
1.5.2.3 P/t secretariat (including book keeper, and other
administrative support) 24w/m
1.5.2.4 Travel on official business (96 person trips)
1.5.3.5 Office expendable supplies 36month
1.5.3.6 Office non-expendable equipment (computers, projector,
duplicating machine, electrograph, desks, sofa, etc.)
1.5.3.7 rent and maintenance office
1.5.3.8 cost of communication 36month
1.5.3.9 Audit expenses 3years
1.5.3.10 Translation
2. Sustainability of Site Management
2.1
Stakeholder
Analysis
2.1.1 Preparation of initial draft of stakeholder analysis
2.1.2 Discuss and clear initial draft of stakeholder analysis with
stakeholder groups
2.1.4 Based on the stakeholder analysis, Prepare stakeholder
participation plans
2.1.5 Formal approval of stakeholder participation plan
2.1.6 Publish stakeholder participation plan via website & local
press
2.2 Economic valuation
2.2.1 Assemble necessary information on economic valuation
according to agreed procedures
2.2.2 Preparation of a draft economic valuation of Hepu Seagrass
2.2.3 Stakeholder discussion, inputs and clearance of Economic
Valuation (2 meetings)
2.2.4 Finalisation of report on economic valuation
2.2.5 Publish economic valuation on website and local press, in hard
copy
Table 1 continued
Framework Workplan and Timetable.
Objectives/Components
1st year
2nd year
3rd year
Sub-component
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Activities
Sub-activities
2.3 Revenue streams & Financial management
2.3.1 Identification & analysis of potential revenue generation
activities
2.3.2 Preparation of quantified potential revenue generation and
income projections
2.3.4 Identification & estimation of costs of implementing
Management Plan for Hepu seagrass and dugong
2.3.5 Preparation draft business and financial management plan for
Hepu seagrasses and dugong
2.3.6 Stakeholder meetings to discuss the draft of business and
financial management plan (2 mtgs)
2.3.7 Submission of the business plan, including procedures for
financial management for approval by the Management Board
2.3.8 Establish of necessary financial management mechanisms
(revenue collection, disbursement procedures)
3. Conservation of Seagrass Bed Ecosystem as Major
Habitat in the Site (biodiversity conservation, dugong
protection, etc.)
3.1 Expand the existing Dugong National Reserve, to cover
wider ecosystem
3.1.1 Evaluation of the existing criteria for the National Dugong
Reserve, with a view to improve the functions of the National
Reserve
3.1.2 Preparation of a draft workplan to expand the existing Dugong
National Reserve to cover wider ecosystem
3.1.2.1 To collect seagrass information
3.1.2.2 To collect marine biology and biodiversity information
3.1.2.3 To collection water and sediment quality information
3.1.2.4 To collect social and economical information
3.1.2.5 To carry out function zoning analysis, and prepare draft
function zoning plan
3.1.2.6 Stakeholder meetings to discuss the draft function zoning
plan (2 meetings)
3.1.2 Submission the draft workplan of reserve to the Guangxi
provincial government for approval (including 2 expert evaluation
meetings)
3.1.3 Publication the report and results of seagrass reserve
3.2 Legislation and enforcement
3.2.1 Collection and analysis of national and local seagrass
legislation
3.2.2 Preparation of draft recommendations on harmonisation of the
legislation to the local government
3.2.3 Stakeholder discussions regarding legislation and enforcement
(2 meetings)
3.2.4 Based on the comments and the results of analysis,
preparation of new legislation or amendments to existing laws and
regulations
3.2.5 Submission of proposals to the appropriate government agency
for approval
3.2.6 Pilot activity in reducing destructive fishing activities
Table 1 continued
Framework Workplan and Timetable.
Objectives/Components
1st year
2nd year
3rd year
Sub-component
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Activities
Sub-activities
3.3 Collection of information for sound management
3.3.1 Half year site surveys of area, biomass, biodiversity and main
environment factors to determine the effects of interventions (6times)
3.3.2 Seasonal seagrass watch at a fixed transects (11times)
3.3.3 Evaluation of the effect of intervention
3.3.4 Survey & evaluation of public and governmental awareness on
seagrass during the process of site demonstration
3.3.5 Workshop on discussion of natural and social survey results
3.3.6 Publication natural and social survey results to improve the
management
4.Education and Training for Increased Involvement of All
Stakeholders in Preserving the Seagrass Habitat
4.1 Training Programme
4.1.1 Prepare draft programme of training (training for trainers,
training for managers, etc.)
4.1.2 Approval of the training plan by MB
4.1.3 Organisation of training courses
4.1.3.1 Training for trainer on seagrass ecology, value,
conservation and management
4.1.3.2 Training for trainers in carrying out Seagrass Watch
regularly
4.1.3.3 Training course for management staff
4.1.3.4 Training course on preparing technical report
4.2 Education
4.2.1 Initiate education on seagrass & dugong at the local schools for
teachers and students.
4.2.2 Education seminars for villagers and urban residents
4.2.3 Training for the local government staff in management of
marine & coastal resources, with focus on seagrass & dugong
4.3 Raising Awareness of Community and Resource Users
4.3.1 Produce short (20 min) video on sustainable use, value, and
threats to seagrass ecosystem.
4.3.1.1 Preparation of necessary materials
4.3.1.2 Production of video
4.3.2 Produce and distribute posters and brochures to raise
awareness of the status and significance of the seagrass ecosystem
4.3.2.1 Preparation necessary documents for poster and
brochures
4.3.2.2 Publish 20 copies of posters and 500 copies of brochures
4.3.3 Produce notice boards
4.3.3.1 Prepare and design notice
4.3.3.2 Production of the notice boards (10)
4.3.4 Produce public awareness materials, to be used by radio,
television, and newspaper media
4.3.4.1 Preparation of necessary articles to be broadcast by local
radio
4.3.4.2 Use the short movie prepared by the project, to be
introduced by the local TV programme
4.3.4.3 Publication of the project news on the local newspaper
Table 1 continued
Framework Workplan and Timetable.
Objectives/Components
1st year
2nd year
3rd year
Sub-component
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Activities
Sub-activities
4.3.5 Use the established site webpage to provide information on
seagrass to the publics
4.3.6 Publishing regular newsletter (12)
4.4 Capacity Building
4.4.1 Establish an education and interpretation centre (production of
specimen, exhibition posters, etc.)
4.4.1.1 Planning of the education centre
4.4.1.2 Construction of the education centre
4.4.1.3 Collecting & Creating biological specimens of seagrass
bed ecosystem
4.4.1.4 Assistance to draft commentary for specimens
4.4.1.5 Preparation of the posters & frames
4.4.1.6 Collection and preparation of other necessary documents
4.4.2 Improve monitoring capacity for seagrass and dugong
17. PROPOSED MANAGEMENT OF THE ACTIVITIES:
The execution of project activities will be conducted by South China Sea Institute of
Oceanology (SCSIO), Chinese Academy of Sciences, providing oversight and monitoring on a
regular monthly basis. Half-year reporting of activities and financial aspects will be monitored
by the UNEP/GEF Project Co-ordinating Unit on behalf of the Implementing Agency (see
Annex 4) The project activities in Hepu will be directed by, a Project Management Board with
representatives from Guangxi Province, Beihai City, Hepu County, SCSIO, Hepu Dugong
Natural Reserve and local communities, etc.. A site manager from Hepu Dugong Natural
Reserve will be responsible for daily management of the project activities. The site manager will
be supported by consultants and sub-contract unit. The wider network of organizations involved
in project execution will be linked through workshops, seminars, field-work, training courses as
well as community based meetings, to which all stakeholders will be invited and which will
serve to provide advice and inputs to management. SCSIO will report the activities and
progress to Inter-ministry Committee through National Technical Working Group. Through
Regional Working Group on Seagrass and PCU, Hepu seagrass demonstration site will be
linked with other demonstration sites in the region. The management framework is outlined in
Figure 1.
18. INFORMATION ON PROPOSED EXECUTING AGENCIES:
(1) South China Sea Institute of Oceanology, Chinese Academy of Sciences.
With 525 staff members, the South China Sea Institute of Oceanology (SCSIO), Chinese
Academy of Sciences(CAS), is one of the largest oceanographic research institutes in China.
There are 389 researchers, including 35 professors, 114 associate professors and senior
engineers. SCSIO is authorized to grant doctoral degrees in marine biology, physical
oceanology, marine geology, and master's degrees in physical oceanography, marine
environment, marine geology, marine biology, and marine chemistry. SCSIO is well known in
China and abroad for its systematic and comprehensive data collection and research
achievements on the South China Sea and adjacent tropical waters. In the fields of marine
biology, environment, chemistry, geology meteorology and hydrology, SCSIO has completed
458 projects, of which 192 have won awards. Currently SCSIO is undertaking a series of major
and key research projects and continuing to play an important role in marine sciences and
development in China. SCSIO also actively serves national and local marine economic
development by undertaking tasks such as monitoring and assessment of marine environment
investigation and analyses of marine biology, hydrology, etc. SCSIO has established academic
exchanges and collaboration with 38 nations, including USA, Japan, Germany and Britain.
Over 30 collaborative projects have been finished or are being carried on, including
responsibility for the seagrass sub-component in China of the project "Reversing
Environmental Degradation Trends in South China Sea and Gulf of Thailand".
(2) National Dugong Natural Reservation Zone Management Station In Hepu Of Guangxi
The National Dugong Natural Reservation Zone Management Station was established in
Hepu Guangxi province in Oct 1986. It lies in Hepu county, Beihai city, Guangxi province. The
reserve spans 43 kilometres of coastline, from the Yingluo port in Shankou town to the sea area
of Shatian town. The national nature preserve manager station has 20 members, among them
12 college graduates, 3 senior engineers and 3 engineers. The graduates majored in
environment biology, biology technique, ecology etc. The station consists of a stationmaster
office, ecology research station and Shatian preserve station, which implement the tasks
associated with daily management, research and eduction, and others. The station has 3400
sq. meters of laboratories, research equipment, and other support equipment such as 1
motorboat, 1 vidicon, 4 cameras, 2 telescopes and 2 satellite navigation systems.
Since the station was established, a great deal of work has been accomplished in order to
protect the dugong and white dolphin resources. This has included production of some rich and
colourful awareness raising materials, and extensive research on seagrass, dugong and white
dolphin resources. The station has increased patrols in the preserve in order to discourage
illegal activities and protect the dugong and seagrass resources effectively.
PROJECT STEERING
UNEP
COMMITTEE
SEPA
INTER-MINISTRY
PCU
COMMITTEE
MANAGEMENT BOARD
NATIONAL
REGIONAL SCIENTIFIC &
TECHNICAL
T
ECHNICAL COMMITTEE
WORKING GROUP
NATIONAL
REGIONAL WORKING
SCSIO
SEAGRASS
GROUP ON SEAGRASS
Site Manager
SEA
SUB-
COMMITTEE
Guangxi Provincial
Government
Beihai City
Government
Hepu County
Government
Representatives of Local
Communities
Hepu Dugong Natural
Reserve
NATIONAL
REGIONAL
Management Board Reports to Province Government
Site Manager reports to SEA & Province Government
SEA reports to National Seagrass Sub-Committee, NTWG & RWG-S
Membership of committee
Reporting lines
Reporting and direction
Fig. 1. Proposed Management Framework for Hepu Seagrass Demonstration Site
19. EXECUTING AGENCY CONTACT PERSON:
Dr. Xiaoping Huang, Professor,
South China Sea Institute of Oceanology, Chinese Academy of Sciences
164 West Xingang Road
Guangzhou, 510301, China
Tel: 86-20-89023210
Fax: 86-20-84451672
Email:xphuang@scsio.ac.cn xphuang2004@yahoo.com.cn
REFERENCES
Compile Committee of China Bay Records(CCCBR). 1993.China Bay Records. Fascicule 12 (The Bay
of Guangxi). Beijing: Chinese Ocean Publishing Company.
Guijing Li, Weifu Tan, and Zhiping Huang. 2002.The Feasibility Report of the Construction Item
Applying for Special Fund of National Natural Reservation Zone by National Dugong Natural
Reservation Zone in Hepu, Guangxi.
Jinyi Lan.1999. Report of the Actual Resource of Seagrass and the Quality of Seawater of National
Dugong Natural Reservation Zone in the Guangxi.
Jinyi Lan, Zixin Pang. 2001.Report of the Actual Resource of Seagrass in Spring 2001 of National
Dugong Natural Reservation Zone.
Weilin Zhang, Bin Li. 2002.Report of the Actual Resource of Seagrass in Spring and Summer 2002 of
National Dugong Natural Reservation Zone in Hepu, Guangxi.
Xiaoping Huang, and Yinhong Li. 2003. Survey Report of Hepu Seagrass Bed.
Yanjun Pang, and Weiqiang Ye,Guanghua Tan...1987.Report of Dugong Natural Reservation Zone in
Dafeng Estuary Shatian ,Hepu, Guangxi.
Yun Zhi, Jinyi Lan and Jie Lu.1996.The General Programming of National Dugong Natural Reservation
Zone in Hepu, Guangxi.
Annex 1 - Species List
The following species list is taken from the full site characterization table, and includes confirmed
species from the Hepu seagrass beds. Other species will be added following additional research
associated with the demonstration site project. The full site characterization table is available at the
PCU, and the South China Sea Institute of Oceanology.
Penaeids
Penaeus penicillatus Alock
Penaeus (Marsupenaeus) japonicus Bate
Metapenaeus intermedius (Kishinouye)
Metapenaeus ensis (de Haan )
Metapenaeus affinis H. Mine-Edwards
Gastropods
Cerithidea cingulata (Gmelin)
Thais gradadta Jonas
Nerita japonica Dunker
Turritella bacillum Kieuer
Thais mutabilis (Link)
Mitrella bella (Reeve)
Pyramidellidae
Bullacta exarata (Philippi)
Siphopatella walshi (Reeve)
Clithon oualaniensis (Lesson)
Acrilla acuminata (Sowerby)
Mitra sp
Holothurians
Holothuria scabra Jaeger
Pentacta anceps (Selenka)
Opheodesome sp
Phyrella fragilis (Ohshima)
Others
Siganus fuscescens (Houttuyn) (rabbit fish)
Temnopleurus reevesii Gray (urchin)
Arachnoides (urchin)
Astropecten monacanthus Sladen (starfish)
Archaster typicus Muller et Troschel (starfish)
Hippocampus kuda (seahorse)
Dugong dugon (dugong)
Chelonia mydas (green turtle)
Annex 2 - Stakeholder Participation Plan
During the establishment of the seagrass bed demonstration site, stakeholder participation is
expected to consist of: native fishers, local inhabitants, fishery management personnel, the local city
planning department, the environmental protection branch and government, The executing agency.
Implementing agency, PCU of the SCS project.
In order to gauge the public attitudes, 38 consultation questionnaires were distributed. The results
showed:
·
84% of people have seen seagrass, and 95% of people thought that seagrass is beneficial
for fishery.
·
84% of people found that the area of seagrass bed is decreasing rapidly.
·
The main fishery activities are: digging snail, catching fish, cultivating shrimp and cultivating
pearl.
·
39% of people realised that the seagrass bed was degraded.
·
95% of people thought that degeneration of seagrass bed had a negative impact on the
fishery.
·
95% of people support that the seagrass bed would be established as demonstration site.
·
50% of people thought that it would have a negative influence to their livelihood if digging
snail, other destructive fishing practices were forbidden.
In the preserve of seagrass, non-destructive fishing has been conducted for many years, with little
impact on the seagrass bed. However more recently destructive fishing practices have damaged the
seagrass. The targets for the fisheries were usually shrimp and kinds of seashell. It is necessary to raise
the level of education and awareness as soon as possible in the villages and towns. This will assist the
fisherfolk to recognize the importance of seagrass biodiversity and the need for protection of the
seagrass. Thereby, the enthusiasm of fisherfolk for seagrass protection will be enhanced, and the
overall situation improved.
The plans for improvements in the seagrass demonstration site should include close cooperation
with the local government. Some fisherfolk who exploit the seagrass area may be encouraged to
engage in industry and agriculture, and some favourable policies should be introduced to encourage
them. Those fisherfolk who engage in aquaculture in the area can be encouraged to cultivate away from
the seagrass area. Much of the labour force are women, and suitable alternative income generation
activities should be made available to them as well.
When the seagrass demonstration site is established, effort should be put into coordination
between local residents and the administrative department. For the administrative department, major
responsibilities are: to help the management council of the demonstration site to put into effect concrete
measures, dispatch regular enforcement patrols, punish persons who break the law and destroy
seagrass, and publicize the protection policies for seagrass. Local residents, including students, should
be encouraged to improve their knowledge on any policies for protecting seagrass. The administrative
department also needs to create more employment opportunities for fishermen, persuade them to give
up the destructive fishing methods and take other jobs.
The function of stakeholders in the activities
Stakeholders
Function
Executing Agencies
Supervising, leading and managing the project.
Management Board
Operating and managing the demonstration site activities.
Local fisherfolk
Decreasing the destructive behaviours to seagrass bed when fishing.
Local habitants
To publicise the significance of seagrass beds and protect them.
Local government
To ensure that the protection of seagrass is included in the economic developing plans
Environmental bureau
To supervise and deal with the environmental pollution around the seagrass bed.
Fishery bureau
To supervise the fishing and mariculture activities in the seagrass bed.
Dredging company
To supervise the actions of dredging and shipping such that they have minimal effect on the
seagrass bed.
Annex 3 - Causal Chain Analysis
Hepu seagrass bed has been degraded due to human activities and forces of nature.
Human Activities: Seafood is popular in the market. To increase income, more and more local
people go to the beach to dig siphon-worms and snails, reclaim areas for aquaculture, net for fish, and
others. All these activities destroyed the seagrass.
Forces of Nature: Natural Power
The storm tide and the waves caused by typhoons erode the seagrass entirely. Clithon
oualaniensis a nerite snail, reproduces rapidly on the beach, colonizing the space previously occupied
by the seagrass.
INTERVENTIONS
UNDERLYING THREATS
ROOT
SOCIO-EONOMIC
UNDERLYING
DIRECT
ECOLOGICAL
CAUSE
CAUSE
THREATS
THREATS
PROBLEMS
1. Lack of management legislation
Strengthen the
legislation and
2. Inappropriate reclamation policies
Digging
sustainable developing
siphon-worms and
1,3,5,6,7,8,9
mechanism
3. No sustainable management
snails
,10
4. No control of trawl net in seagrass
Raising awareness
and strengthening
Reclamation for
5. Lack of awareness of damage
High demand
1,2,3,5,6,7,8
education &
Need income
aquaculture
being caused
for seafood
,9,10
participation of local
communities, publicize
6. Limited participation of local
communities
Expand the existing
Destroy the
1,3,4,5,6,7,8
Trawling
Dugong Reserve and
7. Lack of understanding of the
seagrass
,9,10
strengthen the
importance of seagrass bed
conservation of
seagrass bed
8. Limited boundary and habitat of
existing dugong reserves
Storm tide,
Establish cross
wave
9. Inadequate harmony among
sectoral management
government departments
Natural
power
Clithon
Collect information for
10. Lack of information for sound
oualaniensis
sound management
management
Annex 4 - Monitoring and Evaluation Plan
Objective
Action
Key Performance Indicators
Establish cross
Establish Hepu seagrass
·Membership list of MB approved by TOR by Guangxi Provincial.
sectoral
site management board
·TOR of MB approved by Guangxi Provincial.
management
(MB)
·Regular meeting reports of management board (12)
framework for the
Prepare site
·Stakeholders meeting reports (2)
sustainable use of
management plan, in
·Management Plan
the Hepu seagrass
consultation with all
site
stakeholders
Establish & publicize
·Seagrass website
website for
demonstration site
Oversight of project
·Half yearly progress reports and expenditure statements for UNEP
management
Sustainability of
Stakeholder Analysis
·Stakeholder participation plan.
site management
Economic valuation
·Meeting reports of stakeholder discussion, inputs and clearance of
economic evaluation (2).
·Report on economic valuation
Revenue streams &
·Report on stakeholder meetings to discuss the draft of business and
financial management plan
financial management
·Business and financial management plan
Objective Action
Key Performance Indicators
Conservation of
Expand the existing
·Reports on stakeholder meetings to discuss the draft function zoning
seagrass bed
Dugong National
plan of seagrass reserve (2)
ecosystem as major Reserve, to cover wider
Report of seagrass reserve zone
habitat in the site
ecosystem
·Result of seagrass reserve approved by local government
(biodiversity
conservation,
legislation and
·Reports on stakeholder discussions regarding legislation and
dugong protection,
enforcement
enforcement (2)
etc.)
·New legislation or amendments to existing laws and regulations
approved by the local government
·Pilot activity in reducing destructive fishing activities
Collection of information
Statistics on the social environment (population and economy etc)
·Reports on Monitoring & evaluation of environmental quality (water
for sound management
quality, sea bottom quality and hydrology etc) of the seagrass habitat
·Reports on the evaluation of bio-characteristic (species, coverage and
biomass etc) of seagrass
·Reports on monitoring & evaluation of associated marine resources in
seagrass bed
Education and
Training Programme
· Number of facilitators trained
training for
· Number of other staff trained
increased
Education
· Number of educated students school teachers
involvement of all
· Number of educated residents
stakeholders in
· Number of educated government offices
preserving the
Raising awareness of
· Number of watching seagrass protection video
seagrass habitat
· Number of distributed seagrass posters and brochures
community and resource
· Number of notice boards
· Number of distributed newsletter
users
· Number of the accessing to the seagrass web site.
· Statistic of the information of awareness before and in after the
demonstration site actions
Capacity building
·Education centre
·Number of visiting the centre
Annex 5 - Detailed Budget
Table 1
Budget by component and activity.
GEF Co-finance
Total
Objectives/Components
1000
2000
3000
4000
5000
Total
1000
2000
3000
4000
5000
Total
Sub-component
Activities
Sub-activities
1. Establish Cross Sectoral Management Framework for the Sustainable Use
of the Hepu Seagrass Site
1.1 Establish Hepu Seagrass Site Management Board (MB)
1.1.1 Identify members of Hepu site management board
1.1.2 Select and appoint site manager
1.1.3 Draft TOR and rules of the MB
1.1.4 Approval of membership and TOR by Guanxi Provincial Govt
1.1.5 Regular meetings of management board (12)
19,200
19,200
10,200
10,200 29,400
1.2 Prepare site management plan, in consultation with all stakeholders
1.2.1 Consultation with all stakeholders regarding responsibilities, future uses,
2,000
2,000
1,200
1,200
3,200
and controlled activities at the site
1.2.2 Drafting of initial site management plan
3,000
3,000
1,000
1,000
4,000
1.2.3 Formal review of site management plan via stakeholders meetings (2
2,000
2,000
1,000
1,000
3,000
meetings)
1.2.4 Revision of initial draft plan for submission to MB
1,000
1,000
500
500
1,500
1.2.5 Submission and approval of management plan by Beihei City Government
0
1,500
1,500
1,500
(meeting)
1.2.6 Publish Management plan via local press
0
0
0
1.2.7 Publication of 300 copies of management plan
1,500
1,500
2,500
2,500
4,000
Table 1 continued
Budget by component and activity.
GEF Co-finance
Total
Objectives/Components
1000
2000
3000
4000
5000
Total
1000
2000
3000
4000
5000
Total
Sub-component
Activities
Sub-activities
1.3 Establish & publicize website for demonstration site
1.3.1 Establish project website
0
0
0
1.3.1.1 Purchase of computers and equipments
0
10,000
10,000 10,000
1.3.1.2 Software
1,000
1,000
0
1,000
1.3.1.3 Page design
2,000
2,000
3,000
3,000
5,000
1.3.1.4 Equipment maintenance & repair
2,200
2,200
800
800
3,000
1.3.2 Consultants to prepare demonstration site website with UNEP/GEF
0
0
0
Project and demonstration site information materials
1.3.3 Establish linkage with SCS website, & other demonstration site websites
0
0
0
1.4 Oversight of project management
1.4.1 Publication of meeting reports, hard copy & via project website
9,000 9,000
600
600 9,600
1.4.2 Regular reports from management board to Guanxi Provincial Govt., and
2,000 2,000
2,000
2,000 4,000
NTWG
1.4.3 Half yearly progress reports and expenditure statements for UNEP
0
0
0
0 0
1.4.4 Project evaluation at mid term and end of GEF support phase for project,
11,000 11,000
0 11,000
by independent regional expert
1.4.5 Prepare and submission of final project summary report to UNEP/GEF
250 250
2,000
2,000 2,250
(50 copies)
Table 1 continued
Budget by component and activity.
GEF Co-finance
Total
Objectives/Components
1000
2000
3000
4000
5000
Total
1000
2000
3000
4000
5000
Total
Sub-component
Activities
Sub-activities
1.5 Implementation of the demonstration activities
1.5.1 Management of Local Executing Agency
0
0
0
1.5.1.1 task manager 36w/m
10,800
10,800
7,200
7,200 18,000
1.5.1.2 assistants (two persons) 72w/m
14,400
14,400 14,400
14,400 28,800
1.5.1.3 Travel on official business (108 person trips)
3,000
3,000
6,000
6,000
9,000
1.5.1.4 Office expendable supplies 36month
6,000
6,000
1,000
1,000
7,000
1.5.1.5 Office non-expendable equipment (computers, laser printer, duplicating
0
10,000
10,000 10,000
machine, etc.)
1.5.1.6 rent and maintenance office
0
8,000
8,000
8,000
1.5.1.7 cost of communication 36month
2,000
2,000
1,000
1,000
3,000
1.5.1.8 Translation
5,000
5,000
3,000
3,000
8,000
1.5.2 Management of General Executing Agency
0
0
0
1.5.2.1 Project Coordinator 12w/m
6,000
6,000
6,000
6,000 12,000
1.5.2.2 Project assistant 18w/m
7,200
7,200
2,400
2,400
9,600
1.5.2.3 P/t secretariat (including book keeper, and other administrative
5,000
5,000 10,000
10,000 15,000
support) 24w/m
1.5.2.4 Travel on official business (36 person trips)
10,800
10,800 11,880
11,880 22,680
1.5.2.5 Office expendable supplies 36month
4,000
4,000
1,000
1,000
5,000
1.5.2.6 Office non-expendable equipment (computers, projector, duplicating
0
15,000
15,000 15,000
machine, electrograph, desks, sofa, etc.)
1.5.2.7 rent and maintenance office
0
12,000
12,000 12,000
1.5.2.8 cost of communication 36month
6,000
6,000
1,000
1,000
7,000
1.5.2.9 Audit expenses 3years
2,000
2,000
0
2,000
1.5.2.10 Translation
9,000
9,000
2,000
2,000 11,000
Table 1 continued
Budget by component and activity.
GEF Co-finance
Total
Objectives/Components
1000
2000
3000
4000
5000
Total
1000
2000
3000
4000
5000
Total
Sub-component
Activities
Sub-activities
2. Sustainability of Site Management
2.1 Stakeholder Analysis
2.1.1 Preparation of initial draft of stakeholder analysis
1,000
1,000
1,500
1,500
2,500
2.1.2 Discuss and clear initial draft of stakeholder analysis with stakeholder
2,500
2,500
500
500
3,000
groups
2.1.3 Based on the stakeholder analysis, Prepare stakeholder participation plans
1,000
1,000
1,000
1,000
2,000
2.1.4 Formal approval of stakeholder participation plan
0
0
0
2.1.5 Publish stakeholder participation plan via website & local press
1,000
1,000
500
500
1,500
2.2 Economic valuation
2.2.1 Assemble necessary information on economic valuation according to
2,000
2,000
2,000
2,000
4,000
agreed procedures
2.2.2 Preparation of a draft economic valuation of Hepu Seagrass
1,500
1,500
1,500
1,500
3,000
2.2.3 Stakeholder discussion, inputs and clearance of Economic Valuation (2
2,500
2,500
500
500
3,000
meetings)
2.2.4 Finalisation of report on economic valuation
1,000
1,000
1,500
1,500
2,500
2.2.5 Publish economic valuation on website and local press, in hard copy
500
500
500
500
1,000
2.3 Revenue streams & Financial management
2.3.1 Identification & analysis of potential revenue generation activities
2,000
2,000
2,000
2,000
4,000
2.3.2 Preparation of quantified potential revenue generation and income
1,500
1,500
1,500
1,500
3,000
projections
2.3.3 Identification & estimation of costs of implementing Management Plan for
1,000
1,000
1,000
1,000
2,000
Hepu seagrass and dugong
Preparation draft business and financial management plan for Hepu seagrasses
1,500
1,500
1,000
1,000
2,500
and dugong
Table 1 continued
Budget by component and activity.
GEF Co-finance
Total
Objectives/Components
1000
2000
3000
4000
5000
Total
1000
2000
3000
4000
5000
Total
Sub-component
Activities
Sub-activities
2.3.4 Stakeholder meetings to discuss the draft of business and financial
2,800
2,800
200
200
3,000
management plan (2 mtgs)
2.3.5 Submission of the business plan, including procedures for financial
0
0
0
0
management for approval by the Management Board
2.3.6 Establish of necessary financial management mechanisms (revenue
1,500
1,500
1,000
1,000
2,500
collection, disbursement procedures)
3. Conservation of Seagrass Bed Ecosystem as Major Habitat in the Site
(biodiversity conservation, dugong protection, etc.)
3.1 Expand the existing Dugong National Reserve, to cover wider
ecosystem
3.1.1 Evaluation of the existing criteria for the National Dugong Reserve, to
2,000
2,000
1,500
1,500
3,500
improve the functions of the Reserve
3.1.2 Preparation of a draft workplan to expand the existing Dugong National
0
0
0
Reserve to cover wider area
3.1.2.1 To collect seagrass information
8,000
8,000
4,000
4,000 12,000
3.1.2.2 To collect marine biology and biodiversity information
9,000
9,000
6,000
6,000 15,000
3.1.2.3 To collection water and sediment quality information
9,000
9,000
4,000
4,000 13,000
3.1.2.4 To collect social and economical information
3,000
3,000
1,000
1,000
4,000
3.1.2.5 To carry out function zoning analysis, and prepare draft function zoning
13,500
13,500
21,000
21,000 34,500
plan
2.1.2.6 Stakeholder meetings to discuss the draft function zoning plan (2
2,500
2,500
500
500
3,000
meetings)
3.1.3 Submission the draft workplan of reserve to the Guangxi provincial
2,000
2,000
7,000
7,000
9,000
government for approval (including 2 expert evaluation meetings)
Table 1 continued
Budget by component and activity.
GEF Co-finance
Total
Objectives/Components
1000
2000
3000
4000
5000
Total
1000
2000
3000
4000
5000
Total
Sub-component
Activities
Sub-activities
3.1.4 Publish the report and results of seagrass reserve
500
500
1,200
1,200
1,700
3.2 Legislation and enforcement
3.2.1 Collection and analysis of national and local seagrass legislation
900
900
900
900
1,800
3.2.2 Preparation of draft recommendations on harmonisation of the legislation
3,000
3,000
0
3,000
to the local government
3.2.3 Stakeholder discussions regarding legislation and enforcement (2
2,500
2,500
500
500
3,000
meetings)
3.2.4 Based on the comments and the results of analysis, preparation of new
3,000
3,000
0
3,000
legislation or amendments to existing laws and regulations
3.2.5 Submission of proposals to the appropriate government agency for
0
0
0
approval
3.2.6 Pilot activity in reducing destructive fishing activities
12,000
12,000
8,500
8,500 20,500
3.3 Collection of information for sound management
3.3.1 Half year site surveys of area, biomass, biodiversity and main environment
37,200
37,200
8,620
8,620 45,820
factors to determine the effects of interventions (6times)
3.3.2 Seasonal seagrass watch at a fixed transects (11times)
9,500
9,500
2,000
2,000 11,500
3.3.3 Evaluation of the effect of intervention
5,700
5,700
1,000
1,000
6,700
3.3.4 Survey & evaluation of public and governmental awareness on seagrass
5,000
5,000
3,000
3,000
8,000
during the process of site demonstration
3.3.5 Workshop on discussion of natural and social survey results
5,000
5,000
3,000
3,000
8,000
3.3.6 Publication natural and social survey results to improve the management
900
900
1,000
1,000
1,900
Table 1 continued
Budget by component and activity.
GEF Co-finance
Total
Objectives/Components
1000
2000
3000
4000
5000
Total
1000
2000
3000
4000
5000
Total
Sub-component
Activities
Sub-activities
4. Education and Training for Increased Involvement of All Stakeholders in
Preserving the Seagrass Habitat
4.1Training Programme
4.1.1 Prepare draft programme of training (training for trainers, training for
0
0 0
managers, etc.)
4.1.2 Approval of the training plan by MB
0
0 0
4.1.3 Organisation of training courses
0
0
0
4.1.3.1 Training for trainer on seagrass ecology, value, conservation and
2,000
2,000
1,000
1,000
3,000
management
4.1.3.2 Training for trainers in carrying out Seagrass Watch regularly
4,000
4,000
2,000
2,000
6,000
4.1.3.3 Training course for management staff
3,000
3,000
2,000
2,000
5,000
4.1.3.4 Training course on preparing technical report
2,000
2,000
1,000
1,000
3,000
4.2 Education
0
0
4.2.1 Initiate education on seagrass & dugong at the local schools for teachers
2,500
2,500
1,000
1,000 3,500
and students.
4.2.2 Education seminars for villagers and urban residents
2,500
2,500
1,000
1,000 3,500
4.2.3 Training for the local government staff in management of marine & coastal
2,500
2,500
1,000
1,000 3,500
resources, with focus on seagrass & dugong
Table 1 continued
Budget by component and activity.
GEF Co-finance
Total
Objectives/Components
1000
2000
3000
4000
5000
Total
1000
2000
3000
4000
5000
Total
Sub-component
Activities
Sub-activities
4.3 Raising Awareness of Community and Resource Users
4.3.1 Produce short (20 min) video on sustainable use, value, and threats to
0
0 0
seagrass ecosystem.
4.3.1.1 Preparation of necessary materials
2,000
2,000
1,000
1,000
3,000
4.3.1.2 Production of video
1,000
1,000
500
500
1,500
4.3.2 Produce and distribute posters and brochures to raise awareness of the
0
status and significance of the seagrass ecosystem
4.3.2.1 Preparation documents for poster and brochures
0
0
0
4.3.2.2 Publish 20 copies of posters and 500 brochures
8,000
8,000
2,000
2,000 10,000
4.3.3 Produce notice boards
0
0
0
4.3.3.1 Prepare and design notice
1,000
1,000
1,000
1,000
2,000
4.3.3.2 Production of the notice boards (10)
7,800
7,800
3,600
3,600 11,400
4.3.4 Produce public awareness materials, to be used by radio, television, and
0
0
0
newspaper media
4.3.4.1 Preparation of necessary articles to be broadcast by local radio
1,000
1,000
1,500
1,500
2,500
4.3.4.2 Use the short movie prepared by the project, to be introduced by the
1,000
1,000
1,500
1,500
2,500
local TV programme
4.3.4.3 Publication of the project news in local press
1,000
1,000
1,500
1,500
2,500
4.3.5 Use the established site webpage to provide information on seagrass to
0
0
0
the publics
4.3.6 Publishing regular newsletter (12)
1,000 1,000
1,000
1,000
2,000
Table 1 continued
Budget by component and activity.
GEF Co-finance
Total
Objectives/Components
1000
2000
3000
4000
5000
Total
1000
2000
3000
4000
5000
Total
Sub-component
Activities
Sub-activities
4.4 Capacity Building
4.4.1 Establish an education and interpretation centre (production of specimen,
0
0 0
exhibition posters, etc.)
4.4.1.1 Construction of the education centre
0
120,000
120,000 120,000
4.4.1.2 Planning of the education centre
2,000
2,000
2,000
2,000
4,000
4.4.1.3 Collecting & Creating biological specimens of seagrass bed ecosystem
4.4.1.4 Assistance to draft commentary for specimens
2,000
2,000
0
2,000
4.4.1.5 Preparation of the posters & frames
5,000
5,000
0
5,000
4.4.1.6 Collection and preparation of other documents
2,000
2,000
1,500
1,500
3,500
4.4.2 Improve monitoring capacity for seagrass & dugong
4,700
4,700
30,000
30,000 34,700
Total
95,100 182,700 70,000 39,700 93,850 391,350 86,780 82,420 51,900 231,000 53,100 415,200 806,550
Table 2
Budget by object of expenditure.
1st half year
2nd half year
2005
3rd half year
4th half year
2006
5th half year
6th half year
2007
Total
GEF
Co-fin Total GEF Co-fin Total GEF Co-fin Total GEF Co-fin
Total GEF Co-fin
Total GEF Co-fin Total GEF
Co-fin
Total GEF Co-fin Total GEF Co-fin Total GEF Co-fin Total
1000 PROJECT PERSONNEL COMPONENT
1100 Project personnel
1101 Task manager of Local Executing Agency
1,800
1,200
3,000
1,800
1,200
3,000
3,600
2,400
6,000
1,800
1,200
3,000
1,800
1,200
3,000
3,600
2,400
6,000
1,800
1,200
3,000
1,800
1,200
3,000
3,600
2,400
6,000
10,800 7,200
18,000
36w/m
1102 Assistants of Local Executing Agency 72w/m
2,400
2,400
4,800
2,400
2,400
4,800
4,800
4,800
9,600
2,400
2,400
4,800
2,400
2,400
4,800
4,800
4,800
9,600
2,400
2,400
4,800
2,400
2,400
4,800
4,800
4,800
9,600
14,400 14,400
28,800
1103 Coordinator of General Executing Agency
1,000
1,000
2,000
1,000
1,000
2,000
2,000
2,000
4,000
1,000
1,000
2,000
1,000
1,000
2,000
2,000
2,000
4,000
1,000
1,000
2,000
1,000
1,000
2,000
2,000
2,000
4,000
6,000 6,000
12,000
12w/m
1104 Project assistant of General Executing Agency
1,200
400
1,600
1,200
400
1,600
2,400
800
3,200
1,200
400
1,600
1,200
400
1,600
2,400
800
3,200
1,200
400
1,600
1,200
400
1,600
2,400
800
3,200
7,200 2,400
9,600
18w/m
1199 Total
6,400
5,000
11,400
6,400
5,000
11,400
12,800 10,000
22,800
6,400
5,000
11,400
6,400
5,000
11,400
12,800
10,000
22,800
6,400
5,000
11,400
6,400
5,000
11,400
12,800
10,000
22,800
38,400
30,000
68,400
1200 Consultants
1201 Consultants to preparation of initial draft of
500
750
1,250
500
750
1,250
1,000
1,500
2,500
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1,000 1,500
2,500
stakeholder analysis
1202 Based on the stakeholder analysis, prepare
0
0
0
0
0
0
0
0
0
1,000
1,000
2,000
0
0
0
1,000
1,000
2,000
0
0
0
0
0
0
0
0
0
1,000 1,000
2,000
stakeholder participation plans
1203 Assemble necessary information on economic
0
0
0
0
0
0
0
0
0
1,000
1,000
2,000
1,000
1,000
2,000
2,000
2,000
4,000
0
0
0
0
0
0
0
0
0
2,000 2,000
4,000
valuation according to agreed procedures
1204 Preparation of a draft economic valuation of
0
0
0
0
0
0
0
0
0
0
0
0
1,500
1,500
3,000
1,500
1,500
3,000
0
0
0
0
0
0
0
0
0
1,500 1,500
3,000
Hepu Seagrass
1205 Finalisation of report on economic valuation
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
500
750
1,250
500
750
1,250
1,000
1,500
2,500
1,000 1,500
2,500
1206 Evaluation of the existing criteria for the
1,000
750
1,750
1,000
750
1,750
2,000
1,500
3,500
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2,000 1,500
3,500
National Dugong Reserve, with a view to
improve the functions of the National Reserve
1207 Collection and analysis of national and local
0
0
0
900
900
1,800
900
900
1,800
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
900 900
1,800
seagrass legislation
Table 2 continued
Budget by object of expenditure.
1st half year
2nd half year
2005
3rd half year
4th half year
2006
5th half year
6th half year
2007
Total
GEF Co-fin Total GEF Co-fin Total GEF Co-fin Total GEF Co-fin
Total GEF Co-fin
Total GEF Co-fin Total GEF
Co-fin
Total GEF Co-fin Total GEF Co-fin Total GEF Co-fin Total
1208 Preparation of draft recommendations on
0
0
0
1,500
1,500
1,500
r0
1,500
1,500
1,500
0
0
0
1,500
0
1,500
0
0
0
0
0
0
0
0
0
3,000 0
3,000
harmonisation of the legislation to the local
government
1209 Based on the comments and the results of
0
0
0
0
0
0
0
0
0
0
0
0
3,000
0
3,000
3,000
0
3,000
0
0
0
0
0
0
0
0
0
3,000 0
3,000
analysis, preparation of new legislation or
amendments to existing laws and regulations
1210 Preparation of necessary materials for video
2,000
1,000
3,000
0
0
0
2,000
1,000
3,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2,000 1,000
3,000
1211 Prepare and design notice
1,000
1,000
2,000
0
0
0
1,000
1,000
2,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1,000 1,000
2,000
1212 Preparation of necessary articles to be
0
0
0
1,000
1,500
2,500
1,000
1,500
2,500
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1,000 1,500
2,500
brocasted by local radio
1213 Assistance to draft commendatory for
0
0
0
0
0
0
0
0
2,000
2,000
0
0
0
2,000
0
2,000
0
0
0
0
0
0
0
0
0
2,000 0
2,000
education base
1299 Total
4,500
3,500
8,000
4,900
3,900
8,800
9,400
7,400
16,800
5,500
2,000
7,500
5,500
2,500
8,000
11,000
4,500
15,500
500
750
1,250
500
750
1,250
1,000
1,500
2,500
21,400
13,400
34,800
1300 Administrative
support
1301 P/t secretariat of General Executing Agency
800
1,700
2,500
850
1,650
2,500
1,650
3,350
5,000
850
1,650
2,500
850
1,650
2,500
1,700
3,300
5,000
850
1,650
2,500
800
1,700
2,500
1,650
3,350
5,000
5,000 10,000
15,000
24w/m
1399 Total
800
1,700
2,500
850
1,650
2,500
1,650
3,350
5,000
850
1,650
2,500
850
1,650
2,500
1,700
3,300
5,000
850
1,650
2,500
800
1,700
2,500
1,650
3,350
5,000
5,000
10,000
15,000
1600 Travel on official business
1601 Travel on official business of Local Executing
500
1,000
1,500
500
1,000
1,500
1,000
2,000
3,000
500
1,000
1,500
500
1,000
1,500
1,000
2,000
3,000
500
1,000
1,500
500
1,000
1,500
1,000
2,000
3,000
3,000 6,000
9,000
Agency (108 persons trips)
1602 Travel on official business of General Executing
1,800
1,980
3,780
1,800
1,980
3,780
3,600
3,960
7,560
1,800
1,980
3,780
1,800
1,980
3,780
3,600
3,960
7,560
1,800
1,980
3,780
1,800
1,980
3,780
3,600
3,960
7,560
10,800 11,880
22,680
Agency (36 persons trips)
1603 Collection and preparation of necessary
0
0
0
0
0
0
0
0
0
0
0
0
2,000
1,500
3,500
2,000
1,500
3,500
0
0
0
0
0
0
0
0
0
2,000 1,500
3,500
documents for education centre
1699 Total
2,300
2,980
5,280
2,300
2,980
5,280
4,600
5,960
10,560
2,300
2,980
5,280
4,300
4,480
8,780
6,600
7,460
14,060
2,300
2,980
5,280
2,300
2,980
5,280
4,600
5,960
10,560
15,800
19,380
35,180
1999 Component total
14,000
13,180
27,180
14,450
13,530
27,980
28,450
26,710
55,160
15,050
11,630
26,680
17,050
13,630
30,680
32,100
25,260
57,360
10,050
10,380
20,430
10,000
10,430
20,430
20,050
20,810
40,860
80,600
72,780
153,380
Table 2 continued
Budget by object of expenditure.
1st half year
2nd half year
2005
3rd half year
4th half year
2006
5th half year
6th half year
2007
Total
GEF
Co-fin
Total
GEF
Co-fin
Total
GEF
Co-fin
Total
GEF
Co-fin
Total GEF Co-fin
Total GEF Co-fin Total GEF
Co-fin
Total GEF Co-fin Total GEF Co-fin Total GEF Co-fin Total
2000 SUB-CONTRACT COMPONENT
2200 Sub-contract with non profit organisations
2201 Identification & analysis of potential revenue
0 0 0
0 0 0
0
0
0
1,000 1,000
2,000
1,000 1,000 2,000
2,000
2,000
4,000
0
0
0
0
0
2,000 2,000
4,000
generations
2202 Preparation of quantified potential revenue
0 0 0
0 0 0
0
0
0
0
0
0
1,500 1,500 3,000
1,500
1,500
3,000
0
0
0
0
0
1,500 1,500
3,000
generations and income projections
2203 Identification & estimation of costs of
0 0 0
0 0 0
0
0
0
0
0
0
1,000 1,000 2,000
1,000
1,000
2,000
0
0
0
0
0
1,000 1,000
2,000
implementing Management Plan for Hepu
seagrass and dugong management
2204 Preparation draft business and financial
0 0 0
0 0 0
0
0
0
0
0
0
750 500 1,250
750
500
1,250
750 500
1,250
0
750
500
1,250
1,500 1,000
2,500
management plan for Hepu seagrasses and
dugong
2205 Establish of necessary financial management
0 0 0
0 0 0
0
0
0
0
0
0
0 0 0
0
0
0
0
1,500 1,000 2,500
1,500
1,000
2,500
1,500 1,000
2,500
mechanisms (revenue collection, disbursement
procedures)
2206 Evaluation of the effect of intervention
0
0
0
0 0 0
0
0
0
1,500 250
1,750
1,400 250 1,650
2,900
500
3,400
1,400 250
1,650
1,400 250
1,650
2,800
500
3,300
5,700 1,000
6,700
2207 Use the short movie prepared by the project, to
0 0 0
500 750 1,250
500
750
1,250
500 750
1,250
0 0 0
500
750
1,250
0
0
0
0
0
1,000 1,500
2,500
be introduced by the local TV programme
2208 Consultation with all stakeholders regarding
2,000
1,200
3,200
0
0
0
2,000
1,200
3,200
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2,000 1,200
3,200
responsibilities, future uses, and controlled
activities at the site
2209 Drafting of initial site management plan
1,500
500
2,000
1,500
500
2,000
3,000
1,000
4,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3,000 1,000
4,000
2210 Revision of initial draft management plan for
0
0
0
1,000
500
1,500
1,000
500
1,500
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1,000 500
1,500
submission to management board
2211 Page design for website
2,000
3,000
5,000
0
2,000
3,000
5,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2,000 3,000
5,000
2212 To collect seagrass information
0
0
0
4,000
2,000
6,000
4,000
2,000
6,000
4,000
2,000
6,000
0
0
0
4,000
2,000
6,000
0
0
0
0
0
0
0
0
0
8,000 4,000
12,000
2213 To collect marine biology and biodiversity
0
0
0
4,500
3,000
7,500
4,500
3,000
7,500
4,500
3,000
7,500
0
0
0
4,500
3,000
7,500
0
0
0
0
0
0
0
0
0
9,000 6,000
15,000
information
Table 2 continued
Budget by object of expenditure.
1st half year
2nd half year
2005
3rd half year
4th half year
2006
5th half year
6th half year
2007
Total
GEF Co-fin Total GEF Co-fin Total GEF Co-fin Total GEF Co-fin
Total GEF Co-fin
Total GEF Co-fin Total GEF
Co-fin
Total GEF Co-fin Total GEF Co-fin Total GEF Co-fin Total
2214 To collection water and sediment quality
0
0
0
4,500
2,000
6,500
4,500
2,000
6,500
4,500
2,000
6,500
0
0
0
4,500
2,000
6,500
0
0
0
0
0
0
0
0
0
9,000 4,000
13,000
information
2215 To collect social and economical information
0
0
0
1,500
500
2,000
1,500
500
2,000
1,500
500
2,000
0
0
0
1,500
500
2,000
0
0
0
0
0
0
0
0
0
3,000 1,000
4,000
2216 To carry out function zoning analysis, and
0
0
0
5,000
7,500
12,500
5,000
7,500
12,500
5,000
7,500
12,500
3,500
6,000
9,500
8,500
13,500
22,000
0
0
0
0
0
0
0
0
0
13,500 21,000
34,500
prepare draft function zoning plan
2217 Pilot activity in reducing destructive fishing
0
0
0
0
0
0
0
0
0
0
0
0
2,000
2,500
4,500
2,000
2,500
4,500
5,000
3,000
8,000
5,000
3,000
8,000
10,000
6,000
16,000
12,000 8,500
20,500
activities
2218 Half year site surveys of area, biomass,
6,200
1,510
7,710
6,200
1,400
7,600
12,400
2,910
15,310
6,200
1,400
7,600
6,200
1,400
7,600
12,400
2,800
15,200
6,200
1,400
7,600
6,200
1,510
7,710
12,400
2,910
15,310
37,200 8,620
45,820
biodiversity and main environment factors to
determine the effects of interventions (6times)
2219 Seasonal seagrass watch at a fixed
900
200
1,100
1,750
350
2,100
2,650
550
3,200
1,750
350
2,100
1,750
350
2,100
3,500
700
4,200
1,750
350
2,100
1,600
400
2,000
3,350
750
4,100
9,500 2,000
11,500
transactions (11 times)
2220 Survey & evaluation of public and
400
300
700
950
500
1,450
1,350
800
2,150
950
500
1,450
950
500
1,450
1,900
1,000
2,900
950
500
1,450
800
700
1,500
1,750
1,200
2,950
5,000 3,000
8,000
governmental awareness on seagrass during
the process of site demonstration
2221 Initiate education on seagrass & dugong at the
0
0
0
2,000
500
2,500
2,000
500
2,500
500
500
1,000
0
0
0
500
500
1,000
0
0
0
0
0
0
0
0
0
2,500 1,000
3,500
local schools for teachers and students
2222 Education seminars for villagers and urban
0
0
0
2,000
500
2,500
2,000
500
2,500
500
500
1,000
0
0
0
500
500
1,000
0
0
0
0
0
0
0
0
0
2,500 1,000
3,500
residents
2223 Training for the local government staff in
0
0
0
2,000
500
2,500
2,000
500
2,500
500
500
1,000
0
0
0
500
500
1,000
0
0
0
0
0
0
0
0
0
2,500 1,000
3,500
management of marine & coastal resources,
with focus on seagrass & dugong
2224 Production of the notice boards (10)
0
0
0
7,800
3,600
11,400
7,800
3,600
11,400
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
7,800 3,600
11,400
2225 Planning of the education centre
2,000
2,000
4,000
0
0
0
2,000
2,000
4,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2,000 2,000
4,000
2226 Collecting & Creacting biological specimens of
0
0
0
14,250
0
14,250
14,250
0
14,250
14,250
0
14,250
0
0
0
14,250
0
14,250
0
0
0
0
0
0
0
0
0
28,500 0
28,500
seagrass bed ecosystem
2227 Construction of the education centre
90,000
90,000
15,000
15,000
0 105,000
105,000
15,000
15,000
0
0
0
0
15,000
15,000
0
0
0
0
0
0
0
0
0
0 120,000
120,000
Table 2 continued
Budget by object of expenditure.
1st half year
2nd half year
2005
3rd half year
4th half year
2006
5th half year
6th half year
2007
Total
GEF Co-fin Total GEF Co-fin Total GEF Co-fin Total GEF Co-fin
Total GEF Co-fin
Total GEF Co-fin Total GEF
Co-fin
Total GEF Co-fin Total GEF Co-fin Total GEF Co-fin Total
2228 Preparation of the posters & frames for
0
0
0
0
0
0
0
0
0
0
0
0
5,000
0
5,000
5,000
0
5,000
0
0
0
0
0
0
0
0
0
5,000 0
5,000
education base
2299 Total
15,000
98,710
113,710
59,450
39,100
98,550
74,450 137,810
212,260
47,150
35,750
82,900
25,050
15,000
40,050
72,200
50,750
122,950
16,050
6,000
22,050
16,500
6,860
23,360
32,550
12,860
45,410 179,200
201,420
380,620
2999 Component total
15,000
98,710
113,710
59,450
39,100
98,550
74,450 137,810
212,260
47,150
35,750
82,900
25,050
15,000
40,050
72,200
50,750
122,950
16,050
6,000
22,050
16,500
6,860
23,360
32,550
12,860
45,410 179,200
201,420
380,620
3000 TRAINING COMPONENT
3200 Group
training
3201 Training for trainer on seagrass ecology, value,
2,000
1,000
3,000
0
0
0
2,000
1,000
3,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2,000 1,000
3,000
conservation and management
3202 Training for trainers in carrying out Seagrass
4,000
2,000
6,000
0
0
0
4,000
2,000
6,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4,000 2,000
6,000
Watch regularly
3203 Training course for management staff
0
0
0
3,000
2,000
5,000
3,000
2,000
5,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3,000 2,000
5,000
3204 Training course on preparing technical report
2,000
1,000
3,000
0
0
0
2,000
1,000
3,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2,000 1,000
3,000
3299 Total
8,000
4,000
12,000
3,000
2,000
5,000
11,000
6,000
17,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
11,000
6,000
17,000
3300 Meeting/Conference
3301 Meetings of Manage Board (12)
3,200
1,700
4,900
3,200
1,700
4,900
6,400
3,400
9,800
3,200
1,700
4,900
3,200
1,700
4,900
6,400
3,400
9,800
3,200
1,700
4,900
3,200
1,700
4,900
6,400
3,400
9,800
19,200 10,200
29,400
3302 Meetings to review site management plan via
0
0
0
2,000
1,000
3,000
2,000
1,000
3,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2,000 1,000
3,000
stakeholders (2)
3303 Meeting to approve management plan by
0
0
0
0
0
0
0
0
0
0
1,500
1,500
0
0
0
0
1,500
1,500
0
0
0
0
0
0
0
0
0
0 1,500
1,500
Beihei City Government
3304 Workshops to discuss and clear initial draft of
0
0
0
0
0
0
0
0
0
2,500
500
3,000
0
0
0
2,500
500
3,000
0
0
0
0
0
0
0
0
0
2,500 500
3,000
stakeholder analysis with stakeholder groups
(2)
3305 Stakeholder discussion, inputs and clearance
0
0
0
0
0
0
0
0
0
0
0
0
1,250
250
1,500
1,250
250
1,500
1,250
250
1,500
0
0
0
1,250
250
1,500
2,500 500
3,000
of Economic Valuation (2 meetings)
3306 Stakeholder meetings to discuss the draft of
0
0
0
0
0
0
0
0
0
0
0
0
1,400
100
1,500
1,400
100
1,500
1,400
100
1,500
0
0
0
1,400
100
1,500
2,800 200
3,000
business and financial management plan (2
meetings)
Table 2 continued
Budget by object of expenditure.
1st half year
2nd half year
2005
3rd half year
4th half year
2006
5th half year
6th half year
2007
Total
GEF
Co-fin
Total
GEF
Co-fin
Total
GEF
Co-fin
Total
GEF
Co-fin
Total GEF Co-fin
Total GEF Co-fin Total GEF
Co-fin
Total GEF Co-fin Total GEF Co-fin Total GEF Co-fin Total
3307 Stakeholder meetings to discuss the draft
0
0
0
0
0
0
0
0
0
0
0
0
2,500
500
3,000
2,500
500
3,000
0
0
0
0
0
0
0
0
0
2,500 500
3,000
function zoning plan (2 meetings)
3308 Experts evaluations of the draft work plan of
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2,000
7,000
9,000
0
0
0
2,000
7,000
9,000
2,000 7,000
9,000
reserve to the Guangxi provincial government
for approval (2)
3309 Stakeholder discussions regarding legislation
0
0
0
0
0
0
0
0
0
2,500
500
3,000
0
2,500
500
3,000
0
0
0
0
0
0
0
2,500 500
3,000
and enforcement (2 meetings)
3310 Workshop on discussion of natural and social
0
0
0
0
0
0
0
0
0
0
0
0
5,000
3,000
8,000
5,000
3,000
8,000
0
0
0
0
0
0
0
0
0
5,000 3,000
8,000
survey results
3399 Total
3,200
1,700
4,900
5,200
2,700
7,900
8,400
4,400
12,800
8,200
4,200
12,400
13,350
5,550
18,900
21,550
9,750
31,300
7,850
9,050
16,900
3,200
1,700
4,900
11,050
10,750
21,800
41,000
24,900
65,900
3999 Component total
11,200
5,700
16,900
8,200
4,700
12,900
19,400
10,400
29,800
8,200
4,200
12,400
13,350
5,550
18,900
21,550
9,750
31,300
7,850
9,050
16,900
3,200
1,700
4,900
11,050
10,750
21,800
52,000
30,900
82,900
4000 EQUIPMENT & PREMISES COMPONENT
4100 Expendable equipment
4101 Software for website
1,000
0
1,000
0
0
0
1,000
0
1,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1,000 0
1,000
4102 Office expendable supplies of Local Executing
1,000
150
1,150
1,000
200
1,200
2,000
350
2,350
1,000
150
1,150
1,000
200
1,200
2,000
350
2,350
1,000
150
1,150
1,000
150
1,150
2,000
300
2,300
6,000 1,000
7,000
Agency 36month
4103 Office expendable supplies of General
1,000
300
1,300
750
200
950
1,750
500
2,250
750
150
900
750
200
950
1,500
350
1,850
750
150
900
0
0
0
750
150
900
4,000 1,000
5,000
Executing Agency 36month
4199 Total
3,000
450
3,450
1,750
400
2,150
4,750
850
5,600
1,750
300
2,050
1,750
400
2,150
3,500
700
4,200
1,750
300
2,050
1,000
150
1,150
2,750
450
3,200
11,000
2,000
13,000
4200 Non Expendable equipment
4201 Purchase of computers and equipments for
0
10,000
10,000
0
0
0
0
10,000
10,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 10,000
10,000
website
4202 Office non-expendable supplies of Local
0 5,000 5,000
0 1,250 1,250
0
6,250
6,250
0 1,250 1,250
0 1,250 1,250
0
2,500
2,500
0 1,250 1,250
0 0 0
0
1,250
1,250
0 10,000
10,000
Executing Agency (computers, laser printer,
duplicating machine, etc.)
Table 2 continued
Budget by object of expenditure.
1st half year
2nd half year
2005
3rd half year
4th half year
2006
5th half year
6th half year
2007
Total
GEF
Co-fin
Total
GEF
Co-fin
Total
GEF
Co-fin
Total
GEF
Co-fin
Total GEF Co-fin
Total GEF Co-fin Total GEF
Co-fin
Total GEF Co-fin Total GEF Co-fin Total GEF Co-fin Total
4203 Non-expendable supplies of General Executing
0 5,000 5,000
0 2,500 2,500
0
7,500
7,500
0 2,500 2,500
0 2,500 2,500
0
5,000
5,000
0 2,500 2,500
0 0 0
0
2,500
2,500
0 15,000
15,000
Agency (computers, projector, duplicating
machine, electrograph, desks, sofa, etc.)
4204 Equipment to improve monitoring capacity for
4,700
30,000
34,700
0
0
0
4,700
30,000
34,700
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4,700 30,000
34,700
seagrass and dugong
4299 Total
4,700
50,000
54,700
0
3,750
3,750
4,700
53,750
58,450
0
3,750
3,750
0
3,750
3,750
0
7,500
7,500
0
3,750
3,750
0
0
0
0
3,750
3,750
4,700
65,000
69,700
4300 Premises
Rent and maintained office of Local Executing
0
1,500
1,500
0
1,250
1,250
0
2,750
2,750
0
1,250
1,250
0
1,250
1,250
0
2,500
2,500
0
1,250
1,250
0
1,500
1,500
0
2,750
2,750
0 8,000
8,000
Agency 36month
Rent and maintained office of General
0
2,000
2,000
0
2,000
2,000
0
4,000
4,000
0
2,000
2,000
0
2,000
2,000
0
4,000
4,000
0
2,000
2,000
0
2,000
2,000
0
4,000
4,000
0 12,000
12,000
Executing Agency 36month
4399 Total
0
3,500
3,500
0
3,250
3,250
0
6,750
6,750
0
3,250
3,250
0
3,250
3,250
0
6,500
6,500
0
3,250
3,250
0
3,500
3,500
0
6,750
6,750
0
20,000
20,000
4999 Component total
7,700
53,950
61,650
1,750
7,400
9,150
9,450
61,350
70,800
1,750
7,300
9,050
1,750
7,400
9,150
3,500
14,700
18,200
1,750
7,300
9,050
1,000
3,650
4,650
2,750
10,950
13,700
15,700
87,000
102,700
5000 MISCELIANEOUS COMPONENT
5100 Operation and maintenance of equipment
5101 Equipment maintenance &repair for website
350
150
500
400 100 500
750
250
1,000
350 150 500
400 100 500
750
250
1,000
350 150 500
350 150 500
700
300
1,000
2,200 800
3,000
5199 Total
350
150
500
400
100
500
750
250
1,000
350
150
500
400
100
500
750
250
1,000
350
150
500
350
150
500
700
300
1,000
2,200
800
3,000
5200 Reporting
Costs
5201 Publication of 300 copies of management plan
0
0
0
0
0
0
0
0
0
1,500
2,500
4,000
0
0
0
1,500
2,500
4,000
0
0
0
0
0
0
0
0
0
1,500 2,500
4,000
5202 Publication of meeting reports
1,000
100
1,100
1,500
100
1,600
2,500
200
2,700
1,500
100
1,600
1,500
100
1,600
3,000
200
3,200
1,500
100
1,600
2,000
100
2,100
3,500
200
3,700
9,000 600
9,600
5203 Regular reports from management board to
200
200
400
400
350
750
600
550
1,150
350
400
750
400
350
750
750
750
1,500
350
400
750
300
300
600
650
700
1,350
2,000 2,000
4,000
Guanxi Provincial Govt.
5204 Publish stakeholder participation plan via
0
0
0
0
0
0
0
0
0
0
0
0
1,000
500
1,500
1,000
500
1,500
0
0
0
0
0
0
0
0
0
1,000 500
1,500
website & local press
5205 Publish economic valuation on website and
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
500
500
1,000
500
500
1,000
500 500
1,000
local press, in hard copy
5206 Publish the report, results of seagrass reserve
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
500
1,200
1,700
500
1,200
1,700
500 1,200
1,700
Table 2 continued
Budget by object of expenditure.
1st half year
2nd half year
2005
3rd half year
4th half year
2006
5th half year
6th half year
2007
Total
GEF Co-fin Total GEF Co-fin Total GEF Co-fin Total GEF Co-fin
Total GEF Co-fin
Total GEF Co-fin Total GEF
Co-fin
Total GEF Co-fin Total GEF Co-fin Total GEF Co-fin Total
5207 Publication natural and social survey results to
0
0
0
0
0
0
0
0
0
0
0
0
900
1,000
1,900
900
1,000
1,900
0
0
0
0
0
0
0
0
0
900 1,000
1,900
improve the management
5208 Production of video
0
0
0
1,000
500
1,500
1,000
500
1,500
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1,000 500
1,500
5209 Publish 20 copies of posters, 500 brochures
0
0
0
8,000
2,000
10,000
8,000
2,000
10,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
8,000 2,000
10,000
5210 Publication of the project news in local press
200
250
450
150 250 400
350
500
850
150 250 400
150 250 400
300
500
800
150 250 400
200 250 450
350
500
850
1,000 1,500
2,500
5211 Publishing regular newsletter (12)
200
200
400
150 150 300
350
350
700
150 150 300
150 150 300
300
300
600
150 150 300
200 200 400
350
350
700
1,000 1,000
2,000
5212 Printing final project report (50 copies)
0
0
0
0 0 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
250
0
250
250
0
250
250 0
250
5299
1,600
750
2,350
11,200
3,350
14,550
12,800
4,100
16,900
3,650
3,400
7,050
4,100
2,350
6,450
7,750
5,750
13,500
2,150
900
3,050
3,950
2,550
6,500
6,100
3,450
9,550
26,650
13,300
39,950
5300 Sundry
5301 Communication, Local Executing Agency 3 yrs
300
150
450
400
150
550
700
300
1,000
300
200
500
400
150
550
700
350
1,050
300
200
500
300
150
450
600
350
950
2,000 1,000
3,000
5302 Translation of Local Executing Agency
500
500
1,000
750
500
1,250
1,250
1,000
2,250
750
500
1,250
750
500
1,250
1,500
1,000
2,500
750
500
1,250
1,500
500
2,000
2,250
1,000
3,250
5,000 3,000
8,000
5303 Communication, General Executing Agency 3
1,000
150
1,150
1,000
200
1,200
2,000
350
2,350
1,000
150
1,150
1,000
200
1,200
2,000
350
2,350
1,000
150
1,150
1,000
150
1,150
2,000
300
2,300
6,000 1,000
7,000
yrs
5304 Translation of General Executing Agency
1,000
300
1,300
1,500
350
1,850
2,500
650
3,150
1,500
350
1,850
1,500
350
1,850
3,000
700
3,700
1,500
350
1,850
2,000
300
2,300
3,500
650
4,150
9,000 2,000
11,000
5399
2,800
1,100
3,900
3,650
1,200
4,850
6,450
2,300
8,750
3,550
1,200
4,750
3,650
1,200
4,850
7,200
2,400
9,600
3,550
1,200
4,750
4,800
1,100
5,900
8,350
2,300
10,650
22,000
7,000
29,000
5500 Evaluation
5501 Mid-term and final (consultants
0 0 0
0 0 0
0
0
0
0 0 0
5,500 0
5,500
5,500
0
5,500
0 0 0
5,500 0
5,500
5,500
0
5,500
11,000 0
11,000
fees/travel/DSA)
5502 Final project report
0
0
0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 2,000 2,000
0
2,000
2,000
0 2,000
2,000
5503 Audit expenses 3 years
300
0
300
350
0
350
650
0
650
350
0
350
350
0
350
700
0
700
350
0
350
300
0
300
650
0
650
2,000 0
2,000
5599
300
0
300
350
0
350
650
0
650
350
0
350
5,850
0
5,850
6,200
0
6,200
350
0
350
5,800
2,000
7,800
6,150
2,000
8,150
13,000
2,000
15,000
5999 Component total
5,050
2,000
7,050
15,600
4,650
20,250
20,650
6,650
27,300
7,900
4,750
12,650
14,000
3,650
17,650
21,900
8,400
30,300
6,400
2,250
8,650
14,900
5,800
20,700
21,300
8,050
29,350
63,850
23,100
86,950
9999 Total
52,950 173,540
226,490
99,450
69,380 168,830 152,400 242,920
395,320
80,050
63,630
143,680
71,200
45,230
116,430
151,250
108,860
260,110
42,100
34,980
77,080
45,600
28,440
74,040
87,700
63,420 151,120 391,350
415,200
806,550