lA second phase (or a new project) should be developed
for strategic, long-term capacity-building in OFM in Pacific SIDS, and to specifically assist
smaller Pacific SIDS and those with governance
and other problems.
l
lRationale:
lThe need for continuation and long-term sustainability
of the OFM initiatives, and need for more focused assistance to small Pacific SIDS has been raised
throughout the MTE.
l
lThe 2007 Pacific Forum Leaders’ Vavau Declaration calls
for long-term, strategic capacity-building
in OFM in the Pacific SIDS.
lTiming:
lPlanning should commence as soon as possible on a new
project. Although the details of this are outside the scope of this MTE, some general
suggestions on process are provided.
l
l
l