ANATOLIA WATERSHED REHABILITATION PROJECT
  • AGRICULTURAL POLLUTION CONTROL IN BLACKSEA




  • Dr. Ömer Faruk Mutlu
  • October 23 – 25, ANKARA
2
"Total area 780.000 km2"
  • Total area 780.000 km2


  • Population 72 million


  • 34 % of total population of Turkey live in rural areas.


  • According to year 2001 agricultural census results; 71 % of rural population in our country have operations of agricultural activities.
3
 
4
 
5
PROJECT AREA
6
OBJECTIVE
  • The  Project  will  reduce,  over  the long-term, the discharge of nutrients (nitrogen and phosphorus) and other agricultural pollutants into the surface and ground waters of Turkey and the Black Sea through integrated land and water management and ecologically sustainable use of natural resources.


7
OBJECTIVE
  • increasing  the  use  of environmentally friendly agricultural practices and thereby reducing nutrient discharge particularly from agricultural sources to the Black Sea


  • strengthening national policy and local regulatory capacity to meet European  Union  (EU)  standards  for  agricultural  nutrient  pollution  control


8
Main Components of the Agricultural Pollution Control in Blacksea
  •  Manure Management
  •  Nutrient Management
  •  Water and Soil Quality Monitoring
  •  Organic Farming
  •  Nitrate Directive Implementation


9
MANURE MANAGEMENT
  • By October 20, 2007, a total of 126 farm type manure storage (for more than 10 cattle) and 77 household type manure stores (for up to 5 cattle) have been completed.


  • Six large central manure storage and handling facilities,  Samsun, Amasya, Tokat and in Çorum  microcatchment have been completed.


  • Machinery (container carriers, solid manure spreaders, manure mixers, liquid manure vacuum tankers and loader tractors have been procured and are in use.



10
 
11
 
12
 
13
 
14
 
15
 
16
 
17
 
18
 
19
 


20
 
21
 


22
 


23
 
24
 
25
 
26
 
27
 
28
 
29
BIOGAS
  • Biogas introduction studies were launched.


  • Within this scope 2 demonstration facilities are under construction.
30
BIOGAS
31
BIOGAS
32
NUTRIENT MANAGEMENT
  • Soil Analysis



  • Manure Analysis



  • Manure Application Software
33
SOIL AND MANURE ANALYSİS
  • Project Provincial Teams were trained related to Soil Sampling Techniques.
  • All needed chemical substances for analysis in the scope of the Project was provided to Soil and Fertilizer Research Institute.
  • Soil and manure analysis was launched and 400 soil and 20 manure analysis from the project fields had been analyzed.
  • Soil and manure analysis will be accelerated according to application of manure management.


34
 
35
 
36
 
37
Water and Soil Quality Monitoring
  • The team has developed a detailed lab handbook for procedures so that analysis procedures by all labs are harmonized .


  • The labs are provided with necessary chemicals and supplies, instrument capacity strengthened. Both regional and provincial labs are taking necessary samples and conducting  water and soil analysis. The data gathered so far will be used to develop a baseline.


38
Water and Soil Quality Monitoring
  • Within project microcatchments, there are 33 points for surface water samples, 32 points for  ground water sampling  and 2 points from natural fountains. Water is being analyzed monthly and quarterly for pH, temperature, dissolved oxygen, turbidity , suspended solids , nitrate, TN, TP and fecal coliform.


39
Water Quality Monitoring Baseline
40
Water Quality Monitoring Baseline
41
 
42
Water Quality Monitoring Baseline
43
 
44
ORGANIC FARMING
  • With respect to organic farming, the project organized training for 38 farmers and 32 provincial staff from the four project provinces in Izmir where organic fruit production is well established.
  • Subsequently  three training sessions were organized  for training of the trainers on organic farming.


  • An accredited control and certification services company had been contracted to initially help in organizing the organic fruit growing in the project area and later in certification.


45
ORGANIC FARMING
  • 3 Organic walnut field had been established in 3 different microcatchments with 10 hectare, 1 hectare and 30 hectare dimensions.


  • In a microcatchment, 40 hectares walnut field belong to 77 farmers, had been converted into Organic Farming.


  • Interest to Organic Farming and related requests to Project Management  continuously increases.
46
ORGANIC FARMING
47
ORGANIC FARMING
48
ORGANIC FARMING
49
TRAINING
  • In the scope of the project, inner personnel trainings and farmer trainings were carried out.
  • In Project provinces, project provincial teams have been trained continuously.
  • Besides, trainings related to project were not limited to the project provinces and participation from other provinces was provided.
  • Until now, more than 800 farmers have been informed about the project, nitrate pollution and manure management.
  • In the coming months, farmer trainings will focus on manure and nutrient management.



50
TRAINING
  • Training materials
  • Laboratory analysis handbook
  • Soil analysis handbook
  • Nutrient Management
  • Nutrient Management Plan
  • Manure Application Software
  • Manure
  • Manure Management
  • Compost management
  • Determination and control of Agricultural Pollution
  • Water pollution monitoring studies
  • Soil sampling and evaluation of analysis results
  • Soil sampling and evaluation of analysis results
  • Biogas
  • Climate change
51
 
52
FINANCE AND APPLICATION HISTORY
  • AGRICULTURAL POLLUTION CONTROL (GEF – GRANT)
  • GEF (GRANT) : 7.000.000 $
  • PUBLIC  CONTRIBUTION : 2.560.000 $
  •     TOTAL : 9.560.000 $
  • CALENDAR


  •     PROJECT ACTIVITIES LAUNCHED IN JANUARY 2005 AND WILL BE FINISHED BY THE END OF 2012



53
DISBURSEMENTS