- AGRICULTURAL POLLUTION CONTROL IN BLACKSEA
- Dr. Ömer Faruk Mutlu
- October 23 25, ANKARA
|
|
2
|
- Total area 780.000 km2
- Population 72 million
- 34 % of total population of Turkey live in rural areas.
- According to year 2001 agricultural census results; 71 % of rural
population in our country have operations of agricultural activities.
|
|
3
|
|
|
4
|
|
|
5
|
|
|
6
|
- The Project will
reduce, over the long-term, the discharge of
nutrients (nitrogen and phosphorus) and other agricultural pollutants
into the surface and ground waters of Turkey and the Black Sea through
integrated land and water management and ecologically sustainable use of
natural resources.
|
|
7
|
- increasing the use
of environmentally friendly agricultural practices and thereby
reducing nutrient discharge particularly from agricultural sources to
the Black Sea
- strengthening national policy and local regulatory capacity to meet
European Union (EU)
standards for agricultural nutrient pollution control
|
|
8
|
- Manure Management
- Nutrient Management
- Water and Soil Quality Monitoring
- Organic Farming
- Nitrate Directive Implementation
|
|
9
|
- By October 20, 2007, a total of 126 farm type manure storage (for more
than 10 cattle) and 77 household type manure stores (for up to 5 cattle)
have been completed.
- Six large central manure storage and handling facilities, Samsun, Amasya, Tokat and in Çorum microcatchment have been completed.
- Machinery (container carriers, solid manure spreaders, manure mixers, liquid
manure vacuum tankers and loader tractors have been procured and are in
use.
|
|
10
|
|
|
11
|
|
|
12
|
|
|
13
|
|
|
14
|
|
|
15
|
|
|
16
|
|
|
17
|
|
|
18
|
|
|
19
|
|
|
20
|
|
|
21
|
|
|
22
|
|
|
23
|
|
|
24
|
|
|
25
|
|
|
26
|
|
|
27
|
|
|
28
|
|
|
29
|
- Biogas introduction studies were launched.
- Within this scope 2 demonstration facilities are under construction.
|
|
30
|
|
|
31
|
|
|
32
|
- Soil Analysis
- Manure Analysis
- Manure Application Software
|
|
33
|
- Project Provincial Teams were trained related to Soil Sampling
Techniques.
- All needed chemical substances for analysis in the scope of the Project
was provided to Soil and Fertilizer Research Institute.
- Soil and manure analysis was launched and 400 soil and 20 manure
analysis from the project fields had been analyzed.
- Soil and manure analysis will be accelerated according to application of
manure management.
|
|
34
|
|
|
35
|
|
|
36
|
|
|
37
|
- The team has developed a detailed lab handbook for procedures so that
analysis procedures by all labs are harmonized .
- The labs are provided with necessary chemicals and supplies, instrument
capacity strengthened. Both regional and provincial labs are taking
necessary samples and conducting
water and soil analysis. The data gathered so far will be used to
develop a baseline.
|
|
38
|
- Within project microcatchments, there are 33 points for surface water
samples, 32 points for ground
water sampling and 2 points from
natural fountains. Water is being analyzed monthly and quarterly for pH,
temperature, dissolved oxygen, turbidity , suspended solids , nitrate,
TN, TP and fecal coliform.
|
|
39
|
|
|
40
|
|
|
41
|
|
|
42
|
|
|
43
|
|
|
44
|
- With respect to organic farming, the project organized training for 38
farmers and 32 provincial staff from the four project provinces in Izmir
where organic fruit production is well established.
- Subsequently three training
sessions were organized for
training of the trainers on organic farming.
- An accredited control and certification services company had been
contracted to initially help in organizing the organic fruit growing in
the project area and later in certification.
|
|
45
|
- 3 Organic walnut field had been established in 3 different
microcatchments with 10 hectare, 1 hectare and 30 hectare dimensions.
- In a microcatchment, 40 hectares walnut field belong to 77 farmers, had
been converted into Organic Farming.
- Interest to Organic Farming and related requests to Project
Management continuously
increases.
|
|
46
|
|
|
47
|
|
|
48
|
|
|
49
|
- In the scope of the project, inner personnel trainings and farmer
trainings were carried out.
- In Project provinces, project provincial teams have been trained
continuously.
- Besides, trainings related to project were not limited to the project
provinces and participation from other provinces was provided.
- Until now, more than 800 farmers have been informed about the project,
nitrate pollution and manure management.
- In the coming months, farmer trainings will focus on manure and nutrient
management.
|
|
50
|
- Training materials
- Laboratory analysis handbook
- Soil analysis handbook
- Nutrient Management
- Nutrient Management Plan
- Manure Application Software
- Manure
- Manure Management
- Compost management
- Determination and control of Agricultural Pollution
- Water pollution monitoring studies
- Soil sampling and evaluation of analysis results
- Soil sampling and evaluation of analysis results
- Biogas
- Climate change
|
|
51
|
|
|
52
|
- AGRICULTURAL POLLUTION CONTROL (GEF GRANT)
- GEF (GRANT) : 7.000.000 $
- PUBLIC CONTRIBUTION : 2.560.000
$
- TOTAL : 9.560.000 $
- CALENDAR
- PROJECT ACTIVITIES LAUNCHED IN
JANUARY 2005 AND WILL BE FINISHED BY THE END OF 2012
|
|