| Annex 3 (for Section III in text): TOTAL BUDGET AND ANNUAL WORKPLAN | ||||||||||||
| Award ID: | ||||||||||||
| Award Title: PIMS1941 – IW- FSP- Lake Tanganyika – Zambia Component | ||||||||||||
| Project ID: tbd | ||||||||||||
| Project Title: Lake Tanganyika Integrated Management Programme – Zambia Component | ||||||||||||
| Implementing Partner/Executing Agency: Ministry of Tourism, Environment and Natural Resources | ||||||||||||
| Activities / Outcomes | Resp. Party | Fund Code | Donor Code | Budget Code | Budget description | Year 1 | Year 2 | Year 3 | Year 4 | TOTAL | Budget Note | |
| Outcome 1: Reducing levels of siltation into the lake resulting from improved management of the Lake's catchments through sustainable use of agricultural and forest resources | Govt of Zamibia | 62000 | GEF | 71200 | International Consultant | 5,000 | 5,000 | 5,000 | 5,000 | 20,000 | 1 | |
| 71300 | Local Consultant | 40,000 | 60,000 | 68,000 | 40,000 | 208,000 | 2 | |||||
| 71400 | Locally recruited PMU staff | 85,000 | 85,000 | 85,000 | 85,000 | 340,000 | 3 | |||||
| 71600 | Travel | 31,000 | 33,000 | 33,000 | 33,000 | 130,000 | 4 | |||||
| 72800 | IT Equipment | 6,000 | 0 | 0 | 0 | 6,000 | 5 | |||||
| 72100 | Contractual Services Companies | 110,000 | 120,000 | 110,000 | 100,000 | 440,000 | 6 | |||||
| Learning | 35,000 | 50,000 | 50,000 | 45,000 | 180,000 | 7 | ||||||
| 72200 | Equipment and Furniture | 27,000 | 0 | 0 | 0 | 27,000 | 8 | |||||
| 72300 | Materials & Goods | 0 | 200,000 | 300,000 | 50,000 | 550,000 | 9 | |||||
| 72400 | Communication and AV Equipment | 4,000 | 0 | 0 | 0 | 4,000 | 10 | |||||
| 72500 | Supplies | 3,000 | 5,000 | 5,000 | 5,000 | 18,000 | 11 | |||||
| 72600 | Grants | 0 | 70,000 | 70,000 | 60,000 | 200,000 | 12 | |||||
| 73400 | Rental & Maint of Other Equip | 20,000 | 15,000 | 15,000 | 15,000 | 65,000 | 13 | |||||
| 74200 | AV & Printing Production Costs | 7,000 | 10,000 | 11,000 | 12,000 | 40,000 | 14 | |||||
| 74500 | Miscellaneous | 2,000 | 2,000 | 2,000 | 2,000 | 8,000 | ||||||
| Sub-total OUTCOME 1 | 2,236,000 | |||||||||||
| Project Management | Govt of Zamibia | 62000 | GEF | 71200 | International Consultant | 0 | 13,000 | 0 | 13,000 | 26,000 | 15 | |
| 71400 | Locally recruited PMU staff | 15,000 | 15,000 | 15,000 | 15,000 | 60,000 | 16 | |||||
| 72200 | Equipment and Furniture | 6,000 | 0 | 0 | 0 | 6,000 | 17 | |||||
| 72500 | Supplies | 2,000 | 2,000 | 2,000 | 2,000 | 8,000 | 18 | |||||
| 72800 | IT Equipment | 6,000 | 0 | 0 | 0 | 6,000 | 19 | |||||
| 73100 | Rental&Maintenance-Premises | 16,000 | 16,000 | 16,000 | 16,000 | 64,000 | 20 | |||||
| 73200 | Premises Alterations | 10,000 | 0 | 0 | 0 | 10,000 | 21 | |||||
| 74100 | Professional Services | 5,000 | 5,000 | 5,000 | 5,000 | 20,000 | 22 | |||||
| 74500 | Miscellaneous | 1,000 | 1,000 | 1,000 | 1,000 | 4,000 | ||||||
| Sub-total Project Management | 204,000 | |||||||||||
| TOTAL GEF | 436,000 | 707,000 | 793,000 | 504,000 | 2,440,000 | |||||||
| Budget Note: | ||||||||||||
| 1 | Adaptation Specialist | |||||||||||
| 2 | See the activity note for details | |||||||||||
| 3 | PMU inputs (85%) | |||||||||||
| 4 | Travel to & from LUSAKA (Plus 1,200 km) -Workshops & Consultations; also includes National PSC and PM travel to Regional PSC | |||||||||||
| 5 | Laptop, printer and other necessary computer related accessaries for Project Manager | |||||||||||
| 6 | Consulting firms for outputs 1&2 & workshops venue hiring | |||||||||||
| 7 | consultation, training, awareness raising workshops | |||||||||||
| 8 | Project Car | |||||||||||
| 9 | Tree seedlings, etc. | |||||||||||
| 10 | TV, VCR/DVD, ppt projector for awareness raising | |||||||||||
| 11 | papers, etc for workshop | |||||||||||
| 12 | For Income Generating Activities Start-up revolving fund (Output 2) | |||||||||||
| 13 | Car maintenance (Petrol, insurance, radio subscription, check-up, etc.) | |||||||||||
| 14 | for dissemination materials | |||||||||||
| 15 | for MTE and TE | |||||||||||
| 16 | PMU inputs (15%) | |||||||||||
| 17 | Office machinery | |||||||||||
| 18 | papers, etc for project management | |||||||||||
| 19 | computers for Admin and Finance Assistants | |||||||||||
| 20 | Utilities, Security, etc. Rent is covered by the Govt. | |||||||||||
| 21 | Office Renovation | |||||||||||
| 22 | for NEX audits |
| Annex 4: TOTAL BUDGET AND ANNUAL WORKPLAN | ||||||||||||
| Award ID: tbd | ||||||||||||
| Award Title: PIMS1941 – IW- FSP- Lake Tanganyika – Tanzania Component | ||||||||||||
| Project ID: tbd | ||||||||||||
| Project Title: Lake Tanganyika Integrated Environmental Management Project – Tanzania Component | ||||||||||||
| Implementing Partner/Executing Agency: Tanzania Division of Environment | ||||||||||||
| Activities / Outcomes | Resp. Party | Fund Code | Donor Code | Budget Code | Budget description | Year 1 | Year 2 | Year 3 | Year 4 | TOTAL | Budget Note | |
| Outcome1: Sediment flows into Lake Tanganyika from the pilot villages reduced through integrated catchment management, thereby improving lake habitats | Govt of Tanzania | 62000 | GEF | 71200 | International Consultant | 30,000 | 40,000 | 39,500 | 30,000 | 139,500 | 1 | |
| 71300 | Local Consultant | 80,000 | 80,000 | 80,000 | 78,500 | 318,500 | 2 | |||||
| 71400 | Locally recruited PMU staff | 80,000 | 110,000 | 100,000 | 100,000 | 390,000 | 3 | |||||
| 71600 | Travel | 27,000 | 32,000 | 32,000 | 31,000 | 122,000 | 4 | |||||
| Learning and S/H Workshops | 40,000 | 45,000 | 45,000 | 45,000 | 175,000 | 5 | ||||||
| 72800 | IT Equipment | 20,000 | 0 | 0 | 0 | 20,000 | 6 | |||||
| 72100 | Contractual Services Companies | 70,000 | 80,000 | 77,000 | 70,000 | 297,000 | 7 | |||||
| 72200 | Equipment and Furniture | 46,000 | 0 | 0 | 0 | 46,000 | 8 | |||||
| 72300 | Materials & Goods | 0 | 40,000 | 40,000 | 35,500 | 115,500 | 9 | |||||
| 72400 | Communication and AV Equipment | 5,000 | 0 | 0 | 0 | 5,000 | 10 | |||||
| 72500 | Supplies | 5,000 | 5,000 | 5,000 | 5,000 | 20,000 | 11 | |||||
| 72600 | Grants | 20,000 | 50,000 | 50,000 | 52,000 | 172,000 | 12 | |||||
| 73400 | Rental & Maint of Other Equip | 17,000 | 17,000 | 17,000 | 17,000 | 68,000 | 13 | |||||
| 74200 | AV & Printing Production Costs | 5,000 | 15,000 | 15,000 | 15,000 | 50,000 | 14 | |||||
| 74500 | Miscellaneous | 3,000 | 3,000 | 3,000 | 3,000 | 12,000 | ||||||
| Sub-total OUTCOME 1 | 1,950,500 | |||||||||||
| Outcome 2: Wastewater Management at Kigoma-Ujiji Township strengthened, leading to the Lake biodiversity improvement | Govt of Tanzania | 62000 | GEF | 71200 | International Consultant | 6,000 | 7,000 | 7,000 | 7,000 | 27,000 | 15 | |
| 71300 | Local Consultant | 7,000 | 15,000 | 15,000 | 15,000 | 52,000 | 16 | |||||
| 71400 | Locally recruited PMU staff | 18,000 | 20,000 | 20,000 | 20,000 | 78,000 | 17 | |||||
| 71600 | Travel | 5,000 | 10,000 | 13,000 | 5,000 | 33,000 | 18 | |||||
| 72100 | Contractual Services Companies | 10,000 | 20,000 | 20,000 | 20,000 | 70,000 | 19 | |||||
| 72500 | Supplies | 2,000 | 3,000 | 3,000 | 2,000 | 10,000 | 20 | |||||
| 74200 | AV & Printing Production Costs | 4,000 | 7,000 | 8,000 | 7,000 | 26,000 | 21 | |||||
| 74500 | Miscellaneous | 1,000 | 1,000 | 1,000 | 1,000 | 4,000 | ||||||
| Sub-total OUTCOME 2 | 300,000 | |||||||||||
| Project Management | Govt of Tanzania | 62000 | GEF | 71200 | International Consultant | 0 | 15,000 | 0 | 15,000 | 30,000 | 22 | |
| 71400 | Locally recruited PMU staff | 13,000 | 13,000 | 13,000 | 13,000 | 52,000 | 23 | |||||
| 71600 | Travel | 10,000 | 0 | 0 | 0 | 10,000 | 24 | |||||
| 72100 | Contractual Services Companies | 5,000 | 0 | 0 | 0 | 5,000 | 25 | |||||
| 72200 | Equipment and Furniture | 8,000 | 0 | 0 | 0 | 8,000 | 26 | |||||
| 72500 | Supplies | 5,000 | 2,000 | 2,000 | 2,000 | 11,000 | 27 | |||||
| 72800 | IT Equipment | 14,500 | 0 | 0 | 0 | 14,500 | 28 | |||||
| 73100 | Rental&Maintenance-Premises | 24,000 | 24,000 | 24,000 | 24,000 | 96,000 | 29 | |||||
| 73200 | Premises Alterations | 7,000 | 0 | 0 | 0 | 7,000 | 30 | |||||
| 74100 | Professional Services | 3,000 | 3,000 | 3,000 | 3,000 | 12,000 | 31 | |||||
| 74500 | Miscellaneous | 1,000 | 1,000 | 1,000 | 1,000 | 4,000 | ||||||
| Sub-total Project Management | 249,500 | |||||||||||
| TOTAL GEF | 591,500 | 658,000 | 633,500 | 617,000 | 2,500,000 | |||||||
| Budget Notes: | ||||||||||||
| 1 | See activity notes | |||||||||||
| 2 | See activity notes | |||||||||||
| 3 | PMU inputs (75%) | |||||||||||
| 4 | See activity notes | |||||||||||
| 5 | See activity notes | |||||||||||
| 6 | Laptop, printer and any other computer related accessaries for Project Manager | |||||||||||
| 7 | See activity notes | |||||||||||
| 8 | Project Car and a photo copier | |||||||||||
| 9 | Stoves, Kilms, Tree seeds, fertilizers, etc. | |||||||||||
| 10 | TV, VCR/DVD, ppt projector for awareness raising | |||||||||||
| 11 | papers, etc for workshop | |||||||||||
| 12 | small grants for fishery groups | |||||||||||
| 13 | Car maintenance (Petrol, insurance, radio subscription, check-up, etc.) & mainteneance fees for a photocopier | |||||||||||
| 14 | for production of dissemination materials | |||||||||||
| 15 | See activity notes | |||||||||||
| 16 | See activity notes | |||||||||||
| 17 | PMU inputs (15%) | |||||||||||
| 18 | See activity notes | |||||||||||
| 19 | See activity notes | |||||||||||
| 20 | papers, etc for workshop | |||||||||||
| 21 | for production of dissemination materials | |||||||||||
| 22 | for Mid-term Evaluation and Terminal Evaluation | |||||||||||
| 23 | PMU inputs (10%) | |||||||||||
| 24 | for the inception workshop | |||||||||||
| 25 | for the inception workshop | |||||||||||
| 26 | Office machinery and furniture | |||||||||||
| 27 | papers, etc for project management | |||||||||||
| 28 | computers for Admin and Finance Assistants (USD6000) and VSAT installation (USD8500) | |||||||||||
| 29 | Utilities, Security, etc.(20,000/yr -Rent is covered by the Govt.) and VSAT O&M (USD4,000/yr) | |||||||||||
| 30 | Office Renovation | |||||||||||
| 31 | for NEX audits |
| TOTAL ANNUAL WORK PLAN AND BUDGET | |||||||||||
| Award ID: tbd | |||||||||||
| Award Title: PIMS 1941 - IW – FSP- Lake Tanganyika DRC component (UNOPS Execution) | |||||||||||
| Project ID: Tbd | |||||||||||
| Project Title: Partnership Interventions for the Implementation of the Strategic Action Programme (SAP) for Lake Tanganyika | |||||||||||
| Implementing Partner/Executing Agency: UNOPS | |||||||||||
| Activities / Outcomes | Responsible Party | Fund Code | Donor | Budget Code | Budget Description | Year 1 | Year 2 | Year 3 | Year 4 | Total | Budget Notes |
| Outcome 1: Sediment discharge reduced from demonstration catchment management sites; providing significant livelihood benefits to local people, and seeking long-term adaptation measures to changing climatic regimes. | UNOPS | 62000 | GEF | 72100 | WWF Contract | 500,000 | 510,000 | 510,000 | 500,000 | 2,020,000 | 1 |
| 71200 | Internationally recruited consultants | 0 | 12,000 | 12,000 | 12,000 | 36,000 | 2 | ||||
| 72200 | Equipment and Furniture | 26,000 | 0 | 0 | 0 | 26,000 | 3 | ||||
| 72300 | Material and Goods | 50,000 | 75,000 | 75,000 | 50,000 | 250,000 | 4 | ||||
| 73400 | Rental & Maint - Other Equip | 17,000 | 17,000 | 17,000 | 17,000 | 68,000 | 5 | ||||
| SUB-TOTAL OUTCOME 1 | 2,400,000 | ||||||||||
| TOTAL PROJECT | 593,000 | 614,000 | 614,000 | 579,000 | 2,400,000 | ||||||
| Budget Notes: | |||||||||||
| 1 | Contract with WWF (Activity Note attached) | ||||||||||
| 2 | 1 month inputs/yr of international consultant to provide tech backstopping to WWF for yr 2,3, and 4 | ||||||||||
| 3 | Project Car for DRC component | ||||||||||
| 4 | Tree seeds/seedlings | ||||||||||
| 5 | Car maintenance (Petrol, insurance, radio subscription, check-up, etc.) |
| TOTAL ANNUAL WORK PLAN AND BUDGET | ||||||||||||
| Award ID: tbd | ||||||||||||
| Award Title: PIMS 1941 - IW – FSP- Lake Tanganyika Burundi component (UNOPS Execution) | ||||||||||||
| Project ID: Tbd | ||||||||||||
| Project Title: Partnership Interventions for the Implementation of the Strategic Action Programme (SAP) for Lake Tanganyika | ||||||||||||
| Implementing Partner/Executing Agency: UNOPS | ||||||||||||
| Activities / Outcomes | Responsible Party | Fund Code | Donor | Budget Code | Budget Description | Year 1 | Year 2 | Year 3 | Year 4 | Total | Budget Notes | |
| Outcome 1. The quality of the water of Lake Tanganyika is improved at two identified pollution hotspots through wastewater treatment. | UNOPS | 62000 | GEF | 71400 | Locally recruited PMU staff | 80,000 | 80,000 | 80,000 | 80,000 | 320,000 | 1 | |
| 71200 | Internationally recruited consultants | 12,000 | 24,000 | 24,000 | 0 | 60,000 | 2 | |||||
| 71300 | Locally recruited consultants | 18,000 | 30,000 | 30,000 | 18,000 | 96,000 | 3 | |||||
| 72100 | Consulting companies | 170,000 | 180,000 | 50,000 | 0 | 400,000 | 4 | |||||
| 71600 | Travel | 5,000 | 5,000 | 5,000 | 5,000 | 20,000 | 5 | |||||
| Learning/Awareness raising/consultation workshops | 40,000 | 50,000 | 50,000 | 44,000 | 184,000 | 6 | ||||||
| 72300 | Material and Goods | 80,000 | 220,000 | 0 | 0 | 300,000 | 7 | |||||
| 72200 | Equipment and Furniture | 27,000 | 90,000 | 150,000 | 0 | 267,000 | 8 | |||||
| 73400 | Rental & Maint - Other Equip | 0 | 0 | 20,000 | 20,000 | 40,000 | 9 | |||||
| 73400 | Rental & Maint - Other Equip | 17,000 | 17,000 | 17,000 | 17,000 | 68,000 | 10 | |||||
| 72400 | Comm & Audio Visual Equip | 5,000 | 0 | 0 | 0 | 5,000 | 11 | |||||
| 72800 | IT Equipment | 3,000 | 0 | 0 | 0 | 3,000 | 12 | |||||
| 74200 | AV & Printing Production Costs | 5,000 | 5,000 | 5,000 | 5,000 | 20,000 | 13 | |||||
| 74500 | Miscellaneous Expenses | 1,000 | 1,000 | 1,000 | 1,000 | 4,000 | ||||||
| SUB-TOTAL OUTCOME 1 | 1,787,000 | |||||||||||
| Project Management | UNOPS | 62000 | GEF | 71400 | Locally recruited PMU staff | 20,000 | 20,000 | 20,000 | 20,000 | 80,000 | 14 | |
| 72200 | Equipment and Furniture | 6,000 | 0 | 0 | 0 | 6,000 | 15 | |||||
| 73200 | Premises Alteration | 7,000 | 0 | 0 | 0 | 7,000 | 16 | |||||
| 73100 | Rental & Maint - Premises | 20,000 | 20,000 | 20,000 | 20,000 | 80,000 | 17 | |||||
| 72800 | IT Equipment | 5,000 | 0 | 0 | 0 | 5,000 | 18 | |||||
| 74500 | Miscellaneous Expenses | 1,000 | 1,000 | 1,000 | 1,000 | 4,000 | ||||||
| SUB-TOTAL Project Management | 182,000 | |||||||||||
| TOTAL PROJECT | 522,000 | 743,000 | 473,000 | 231,000 | 1,969,000 | |||||||
| Budget Note: | ||||||||||||
| 1 | PMU inputs (80%) to achieve Outcome 1 | |||||||||||
| 2 | 5 month inputs of internationally/regionally recruited consultants (1 month input = 12,000USD, inclusive of DSA and travel costs) (See activity notes) | |||||||||||
| 3 | 16 month inputs of nationally recruited consultants (1 month input = 6,000USD). Whenever possible and appropriate, local consultants are hired to assist carrying out tasks assigned to international/regional consultants to build and retain capacities in the country. (See Activity Notes) | |||||||||||
| 4 | for the construction of the tertiary wastewater treatment systems | |||||||||||
| 5 | PMU staff travel to achive Outcome 2 | |||||||||||
| 6 | 16 workshops (see activity notes) | |||||||||||
| 7 | materials for wastewater facility construction | |||||||||||
| 8 | Project Car for Burundi component (27,000), 2 machineries (45,000 each) for sewerage pipeline maintenance, laboratory equipments (100,000) and equipments for Pollution Training Center (50,000) | |||||||||||
| 9 | Maintenance of the pumping stations | |||||||||||
| 10 | Car maintenance (Petrol, insurance, radio subscription, check-up, etc.) | |||||||||||
| 11 | Acquisition of TV, VCR/DVD, ppt projector for awareness raising and sensitization campagnes | |||||||||||
| 12 | Laptop for Project Manager for Burundi component | |||||||||||
| 13 | production of documents for dissemination | |||||||||||
| 14 | PMU inputs (20%) to develop Management Information System and to ensure the effective project management | |||||||||||
| 15 | For office furnishing | |||||||||||
| 16 | For the necessary renovation of the office to meet UN Security standatds | |||||||||||
| 17 | For security, etc. (Rental is covered by the Govt) | |||||||||||
| 18 | 2 desktops for PMU staff | |||||||||||
| TOTAL ANNUAL WORK PLAN AND BUDGET | |||||||||||
| Award ID: tbd | |||||||||||
| Award Title: PIMS 1941 - IW – FSP- Lake Tanganyika Regional component (UNOPS Execution) | |||||||||||
| Project ID: Tbd | |||||||||||
| Project Title: Partnership Interventions for the Implementation of the Strategic Action Programme (SAP) for Lake Tanganyika | |||||||||||
| Implementing Partner/Executing Agency: UNOPS | |||||||||||
| Activities / Outcomes | Responsible Party | Fund Code | Donor | Budget Code | Budget Description | Year 1 | Year 2 | Year 3 | Year 4 | Total | Budget Notes |
| Outcome 1: Regional and national institutions have internalized the implementation of the SAP and FFMP and provide institutional support for the cooperative management of Lake Tanganyika under the ratified Convention. | UNOPS | 62000 | GEF | 71100 | Internationally recruited PMU staff (CTA&TA) | 149,000 | 149,000 | 85,000 | 85,000 | 468,000 | 1 |
| 71200 | Internationally recruited Secretariat Staff (ED&Dir.Envt) | 180,000 | 0 | 0 | 0 | 180,000 | 2 | ||||
| 71400 | Locally recruited PMU staff | 35,000 | 35,000 | 35,000 | 35,000 | 140,000 | 3 | ||||
| 71200 | Internationally recruited consultants | 30,000 | 36,000 | 36,000 | 30,000 | 132,000 | 4 | ||||
| 71200 | Regionally recruited consultants | 24,000 | 24,000 | 21,000 | 21,000 | 90,000 | 5 | ||||
| 71300 | Locally recruited consultants | 18,000 | 18,000 | 0 | 0 | 36,000 | 6 | ||||
| 71600 | Travel | 12,000 | 12,000 | 13,000 | 13,000 | 50,000 | 7 | ||||
| Learning/Awareness raising/consultation workshops | 100,000 | 100,000 | 100,000 | 88,000 | 388,000 | 8 | |||||
| 72400 | Comm & Audio Visual Equip | 5,000 | 0 | 0 | 0 | 5,000 | 9 | ||||
| 72800 | IT Equipment | 5,000 | 0 | 0 | 0 | 5,000 | 10 | ||||
| 71600 | Support to LTS - organizing a Conf of Ministers | 40,000 | 0 | 0 | 0 | 40,000 | |||||
| 72100 | Support to LTS - Translators | 30,000 | 30,000 | 30,000 | 30,000 | 120,000 | |||||
| 73400 | Support to LTS - Translation equip rental | 15,000 | 15,000 | 15,000 | 15,000 | 60,000 | |||||
| 73100 | Support to LTS - Utilities | 10,000 | 10,000 | 10,000 | 10,000 | 40,000 | 11 | ||||
| 72200 | Equipment and Furniture | 27,000 | 0 | 0 | 0 | 27,000 | 12 | ||||
| 73400 | Rental & Maint - Other Equip | 17,000 | 17,000 | 17,000 | 17,000 | 68,000 | 13 | ||||
| 74200 | AV & Printing Production Costs | 10,000 | 10,000 | 15,000 | 15,000 | 50,000 | 14 | ||||
| 74500 | Miscellaneous Expenses | 1,000 | 1,000 | 1,000 | 1,000 | 4,000 | |||||
| SUB-TOTAL OUTCOME 1 | 1,903,000 | ||||||||||
| Outcome 2. The quality of the water of Lake Tanganyika is improved at two identified pollution hotspots through wastewater treatment. | UNOPS | 62000 | GEF | 71100 | Internationally recruited PMU staff (CTA, TA) | 49,000 | 49,000 | 17,000 | 17,000 | 132,000 | 15 |
| 71200 | Internationally recruited Secretariat Staff (Dir.Envt) | 10,000 | 0 | 0 | 0 | 10,000 | 16 | ||||
| 71400 | Locally recruited PMU staff | 35,000 | 35,000 | 35,000 | 35,000 | 140,000 | 17 | ||||
| 71600 | Travel | 4,000 | 4,000 | 4,000 | 4,000 | 16,000 | 18 | ||||
| SUB-TOTAL OUTCOME 2 | 298,000 | ||||||||||
| Outcome 3: Sediment discharge reduced from demonstration catchment management sites; providing significant livelihood benefits to local people, and seeking long-term adaptation measures to changing climatic regimes. | UNOPS | 62000 | GEF | 71100 | Internationally recruited PMU staff (CTA, TA) | 73,000 | 73,000 | 17,000 | 17,000 | 180,000 | 19 |
| 71200 | Internationally recruited Secretariat Staff (Dir.Envt) | 10,000 | 0 | 0 | 0 | 10,000 | 20 | ||||
| 71400 | Locally recruited PMU staff | 35,000 | 35,000 | 35,000 | 35,000 | 140,000 | 21 | ||||
| 72100 | ICRAF Contract | 100,000 | 200,000 | 200,000 | 150,000 | 650,000 | 22 | ||||
| 71600 | Travel | 4,000 | 4,000 | 4,000 | 4,000 | 16,000 | 23 | ||||
| SUB-TOTAL OUTCOME 3 | 996,000 | ||||||||||
| Outcome 4: Regional monitoring and management systems contribute to the long-term sustainable management of Lake Tanganyika | UNOPS | 62000 | GEF | 71100 | Internationally recruited PMU staff (CTA, TA) | 16,500 | 16,500 | 8,500 | 8,500 | 50,000 | 24 |
| 71200 | Internationally recruited Secretariat Staff (Dir.Envt) | 5,000 | 0 | 0 | 0 | 5,000 | 25 | ||||
| 71400 | Locally recruited PMU staff | 7,000 | 7,000 | 7,000 | 7,000 | 28,000 | 26 | ||||
| 72100 | IUCN Contract | 50,000 | 50,000 | 50,000 | 50,000 | 200,000 | 27 | ||||
| SUB-TOTAL OUTCOME 4 | 283,000 | ||||||||||
| Project Management | UNOPS | 62000 | GEF | 71100 | Internationally recruited PMU staff (CTA, TA) | 34,000 | 34,000 | 34,000 | 34,000 | 136,000 | 28 |
| 71400 | Locally recruited PMU staff | 28,000 | 28,000 | 28,000 | 28,000 | 112,000 | 29 | ||||
| 72200 | Equipment and Furniture | 18,000 | 0 | 0 | 0 | 18,000 | 30 | ||||
| 73400 | Rental & Maint - Other Equip | 10,000 | 10,000 | 10,000 | 10,000 | 40,000 | 31 | ||||
| 73200 | Premises Alteration | 8,000 | 0 | 0 | 0 | 8,000 | 32 | ||||
| 73100 | Rental & Maint - Premises | 15,000 | 15,000 | 15,000 | 15,000 | 60,000 | 33 | ||||
| 72800 | IT Equipment | 10,000 | 0 | 0 | 0 | 10,000 | 34 | ||||
| 71200 | Internationally recruited consultants | 0 | 30,000 | 0 | 30,000 | 60,000 | 35 | ||||
| 74100 | Professional Services | 7,000 | 7,000 | 7,000 | 7,000 | 28,000 | 36 | ||||
| 74500 | Miscellaneous Expenses | 1,000 | 1,000 | 1,000 | 1,000 | 4,000 | |||||
| UNOPS Management Fee | 60,000 | 60,000 | 60,000 | 55,000 | 235,000 | ||||||
| SUB-TOTAL Project Management | 711,000 | ||||||||||
| TOTAL PROJECT | 1,297,500 | 1,115,500 | 910,500 | 867,500 | 4,191,000 | ||||||
| Budget Notes: | |||||||||||
| 1 | CTA:85,000/yr - 50%; TA: 64,000/yr - 40% for the first 2 years | ||||||||||
| 2 | ED:110,000/yr - 100% for the 1st year; Director(Env): 70,000 - 70% for the 1st year; | ||||||||||
| 3 | Regional Project Coordination Unit (PCU) inputs: 35,000/yr (20%) | ||||||||||
| 4 | 11 month inputs of international consultants: (1 month input = 12,000USD, inclusive of DSA and travel costs, See details of required inputs in Activity Note) | ||||||||||
| 5 | 7.5 month inputs of regional consultants (1 month input = 12,000USD, including travel costs, See details of required inputs in Activity Note) | ||||||||||
| 6 | 6 month inputs of national consultants (1 month input = 6,000USD, See details of required inputs in Activity Note) | ||||||||||
| 7 | PCU staff travel to achive Outcome 1 (See Activity Note for PCU travel) | ||||||||||
| 8 | 18 workshops, including 3 training visits (See description of each workshop in Activity Note) | ||||||||||
| 9 | TV, VCR/DVD, ppt projector for awareness raising for Regional component | ||||||||||
| 10 | Laptop and other accessaries for CTA | ||||||||||
| 11 | Utilities for LTA Secretariat. Rental is covered by the Govt | ||||||||||
| 12 | Project car for Regional PCU | ||||||||||
| 13 | 20,000/yr for Car maintenance (Petrol, insurance, radio subscription, check-up, etc.) & 20,000/yr for simultaneous translation equipment rental | ||||||||||
| 14 | production of documents for dissemination, including LTA newsletter | ||||||||||
| 15 | CTA:17,000/yr (10%), TA:32,000 (20%) for yr 1&2 | ||||||||||
| 16 | Dir (Env): 10,000/1st year (10%) | ||||||||||
| 17 | PCU inputs:35,000/yr (25%) | ||||||||||
| 18 | PCU staff travel to achive Outcome 2 (See Activity Notes for PCU travel) | ||||||||||
| 19 | CTA:17,000/yr (10%); TA:56,000/yr (35%) for yr 1&2 | ||||||||||
| 20 | Dir (Env):10,000 (10%) for the 1st year | ||||||||||
| 21 | Regional PCU inputs: 35,000/yr (25%) | ||||||||||
| 22 | Contract with ICRAF (See details in the Annex 1 of the Activity Notes) | ||||||||||
| 23 | PCU staff travel to support Outcome 3 (See Activity Notes for PCU travel) | ||||||||||
| 24 | CTA: 8,500/yr (5%); TA:8,000/yr(5%) for the first 2 years | ||||||||||
| 25 | Dir (Env):5,000/yr (5%) for the 1st year | ||||||||||
| 26 | Regional PCU inputs: 7,000/yr (5%) | ||||||||||
| 27 | Contract with IUCN (See details in Annex 2 of Activity Note) | ||||||||||
| 28 | CTA:34,000/yr(20%) | ||||||||||
| 29 | Regional PCU inputs (20%) | ||||||||||
| 30 | For office furnishing (6,000) and a messenger car (14,000) for RPMU | ||||||||||
| 31 | Car maintenance (Petrol, insurance, radio subscription, check-up, etc.) for a messenger car | ||||||||||
| 32 | Necessary renovation of the office space | ||||||||||
| 33 | For security, etc. (Rent will be covered by Govt) | ||||||||||
| 34 | 2 desktop & 1laptop & printer for Regional PCU | ||||||||||
| 35 | MTE and TE for UNOPS-executed component (Regional, DRC and Burundi) | ||||||||||
| 36 | Annual audits for UNOPS-executed component (Regional, DRC and Burundi) |